100+ Free TN BC-C Industrial Practice Questions
Prepare for the Tennessee Industrial (BC-C) Contractor Examination exam with instant access — no signup required.
Loading practice questions...
Explore More Tennessee Board for Licensing Contractors Examinations
Continue into nearby exams from the same family. Each card keeps practice questions, study guides, flashcards, videos, and articles in one place.
Key Facts: TN BC-C Industrial Exam
70 Q
Official Exam Questions
Prov TN Contractor CIB 2026.07.13
73%
Passing Score
Prov TN Contractor CIB 2026.07.13
3.5 hr
Time Allowed
Prov TN Contractor CIB 2026.07.13
USD 53
Prov Exam Fee
Prov TN Contractor CIB 2026.07.13
Open Book
Book Policy
Prov TN Contractor CIB 2026.07.13
Tennessee Industrial (BC-C) Contractor Examination is the official Board/Prov open-book exam: 70 questions, 73%, 3.5 hours, USD 53 (bulletin dated 2026.07.13). Official delivery is English.
Sample TN BC-C Industrial Practice Questions
Try these sample questions to test your TN BC-C Industrial exam readiness. Each question includes a detailed explanation. Start the interactive quiz above for the full 100+ question experience with AI tutoring.
1A manufacturing-plant floor plan is drawn at a scale of 1/8 inch = 1 foot 0 inches. A column grid measures 3-3/4 inches on the drawing. What is the actual grid spacing?
2A plant floor slab measures 60 feet by 80 feet by 8 inches thick. How many cubic yards of concrete are required, with no waste allowance?
3The same 60-foot by 80-foot by 8-inch plant slab will be ordered with an 8 percent waste allowance. How many cubic yards should be ordered?
4A takeoff lists 2,400 linear feet of No. 5 reinforcing bar for a process-area slab. Using the CRSI unit weight of 1.043 pounds per foot, what is the bar weight?
5A 40-foot by 60-foot equipment-room slab is reinforced with No. 4 bars at 12 inches on center each way. Count one bar at each edge. Add 2 feet of length to each bar for laps. Using 0.668 pounds per foot, what is the closest total No. 4 weight?
6An industrial bay uses 18 W21×62 beams, each 40 feet long, and 12 W14×90 columns, each 28 feet long. Excluding connections, what is the structural steel tonnage?
7An 8-inch CMU partition in a plant is 120 feet long and 16 feet high. Using nominal 8×8×16 units, with no openings and no waste, how many units are required?
8On an architectural floor plan of a manufacturing plant, a dashed line most commonly represents which of the following?
9On an industrial structural-steel package, who is responsible for reviewing and approving the fabricator's shop drawings?
10A process-equipment mat is 10 feet by 12 feet by 3 feet thick. How many cubic yards of concrete are required, with no waste?
About the TN BC-C Industrial Exam
The Tennessee Industrial (BC-C) Contractor Examination is the official Board trade examination administered by Prov beginning July 1, 2026. The official exam has 70 questions. Passing is 73% in 3.5 hours. The examination is open book. Prov lists USD 53 per attempt (Tennessee Contractor Candidate Information Bulletin dated 2026.07.13). BC-C covers industrial production and service facilities such as manufacturing plants, processing facilities, factories, and heavy industrial structures. Candidates must also pass Business and Law. The Board charges a separate USD 250 initial application fee. This bank is an English-language MCQ study adaptation. It does not replace required trade experience, board approval, financial statements or bonds, or the official examination.
Assessment
Open-book computer-based multiple-choice. Prov lists 2021 IBC, the Study Guide for Commercial Building Contractor (2024), the Study Guide for Structural Steel (2012), and OSHA 29 CFR 1926. Remote Examroom testing is available.
Time Limit
3.5 hours
Passing Score
73%
Exam Fee
USD 53 (Prov, Inc. (for the Tennessee Board for Licensing Contractors))
TN BC-C Industrial Exam Content Outline
Estimating and Plan Reading
Estimating, Plan Reading (8 items)
General Code
General Code (5 items)
Sitework
Sitework (2 items)
Footings and Foundations
Footings and Foundations (3 items)
Concrete and Concrete Reinforcement
Concrete and Concrete Reinforcement (17 items)
Masonry
Masonry (6 items)
Carpentry
Carpentry (3 items)
Structural Steel
Structural Steel (14 items)
Roofing, Siding, and Insulation
Roofing, Siding, and Insulation (4 items)
Plumbing Concepts
Plumbing Concepts (1 item)
HVAC Concepts
HVAC Concepts (1 item)
Electrical Concepts
Electrical Concepts (1 item)
OSHA Safety
OSHA Safety (5 items)
How to Pass the TN BC-C Industrial Exam
What You Need to Know
- Passing score: 73%
- Assessment: Open-book computer-based multiple-choice. Prov lists 2021 IBC, the Study Guide for Commercial Building Contractor (2024), the Study Guide for Structural Steel (2012), and OSHA 29 CFR 1926. Remote Examroom testing is available.
- Time limit: 3.5 hours
- Exam fee: USD 53
Keys to Passing
- Work through all 100 available questions
- Review every answer and explanation
- Track weak areas and revisit them
- Use our AI tutor for tough concepts
TN BC-C Industrial Study Tips from Top Performers
Frequently Asked Questions
How many questions are on the Tennessee BC-C Industrial Contractor Examination?
The official Prov examination has 70 questions. Passing is 73% within 3.5 hours (Tennessee Contractor Candidate Information Bulletin dated 2026.07.13).
How much does the Tennessee BC-C exam cost?
Prov lists USD 53 per attempt, including retakes. The Board charges a separate USD 250 initial contractor application fee.
What does a Tennessee BC-C license cover?
Prov describes BC-C as construction related to industrial production and service facilities such as manufacturing plants, processing facilities, factories, and heavy industrial structures.
Do I also need the Business and Law exam?
Yes. Every new contractor applicant must pass the Tennessee Contractor Business and Law Examination in addition to any required trade examination.