Key Facts: NM CID GS-4 Exam

75%

Passing Score

PSI NM Contractor Bulletin 4/3/2026

60 Q

Official Exam Questions

PSI NM Contractor Bulletin 4/3/2026

150 min

Time Allowed

PSI NM Contractor Bulletin 4/3/2026

USD 68.88

PSI Exam Fee

PSI NM Contractor Bulletin 4/3/2026

NM CID GS-4 is a 60-question PSI concrete, cement, walkways, and driveways exam, 75% pass, 150 minutes, USD 68.88 (bulletin 4/3/2026).

Sample NM CID GS-4 Practice Questions

Try these sample questions to review concepts for the NM CID GS-4 exam. Each question includes a detailed explanation. Start the interactive quiz above for the full 100+ question experience with AI tutoring.

1A private driveway slab measures 20 feet by 40 feet and is 4 inches thick. How many cubic yards of concrete are required, with no waste allowance?
A.6.0 cubic yards
B.8.9 cubic yards
C.9.9 cubic yards
D.13.3 cubic yards
Explanation: Convert thickness to feet and divide by 27: 20 × 40 × (4/12) ÷ 27 = 266.67 ÷ 27 = 9.88 cubic yards, which rounds to 9.9 cubic yards. Order extra only after the net volume is correct; waste is a separate adder.
2One cubic yard of concrete placed 4 inches thick covers 81 square feet. How many cubic yards are needed for 486 square feet of 4-inch walkway, with no waste?
A.4.0 cubic yards
B.5.0 cubic yards
C.6.0 cubic yards
D.8.0 cubic yards
Explanation: Coverage at 4 inches is 27 ÷ (4/12) = 81 square feet per cubic yard. 486 ÷ 81 = 6.0 cubic yards. The same result comes from 486 × (4/12) ÷ 27.
3A site plan is drawn at a scale of 1/4 inch = 1 foot 0 inches. A walkway measures 3-1/2 inches on the drawing. What is the actual length?
A.7 feet
B.10 feet 6 inches
C.14 feet
D.28 feet
Explanation: At 1/4 inch = 1 foot, each inch on the drawing equals 4 feet. 3.5 × 4 = 14 feet. Equivalently, 3.5 ÷ 0.25 = 14.
4A driveway is 12 feet wide, 50 feet long, and 5 inches thick. If the estimator adds 8 percent waste, how many cubic yards should be ordered?
A.8.6 cubic yards
B.9.3 cubic yards
C.10.0 cubic yards
D.11.1 cubic yards
Explanation: Net volume is 12 × 50 × (5/12) ÷ 27 = 250 ÷ 27 = 9.26 cubic yards. Adding 8 percent: 9.26 × 1.08 = 10.00 cubic yards. Order a full 10-yard load.
5Estimate net concrete for an 80-foot walk that is 5 feet wide and 4 inches thick, plus two landings that are each 5 feet by 5 feet and 6 inches thick. Ignore waste.
A.4.9 cubic yards
B.5.4 cubic yards
C.5.9 cubic yards
D.7.4 cubic yards
Explanation: Walk: 80 × 5 × (4/12) ÷ 27 = 4.94 cubic yards. Two landings: 2 × 5 × 5 × (6/12) ÷ 27 = 0.93 cubic yards. Total = 5.87 cubic yards, which rounds to 5.9 cubic yards.
6A civil grading plan uses a scale of 1 inch = 20 feet. A proposed driveway measures 3.25 inches on the plan. What field length should be laid out?
A.32.5 feet
B.48.8 feet
C.65.0 feet
D.80.0 feet
Explanation: Engineer's scale of 1 inch = 20 feet means 3.25 × 20 = 65 feet. Do not apply an architectural 1/4-inch scale to a civil sheet.
7A rebar takeoff lists 24 pieces of No. 4 bar, each 20 feet long. Using 0.668 pounds per foot for No. 4 bar, what is the mill weight?
A.160 pounds
B.241 pounds
C.321 pounds
D.481 pounds
Explanation: Total length is 24 × 20 = 480 feet. 480 × 0.668 = 320.6 pounds, which rounds to 321 pounds. CRSI nominal weights are used for purchasing and for comparing delivered bundles.
8Under New Mexico Construction Industries rules, which adopted code pair applies to a GS-4 contractor placing a residential garage slab versus a commercial building slab?
A.NMAC 14.7.2 (2021 IRC) for both occupancies
B.NMAC 14.7.3 (2021 IBC) for dwellings and NMAC 14.7.2 (2021 IRC) for commercial
C.NMAC 14.7.3 (2021 New Mexico Residential Building Code / IRC) for the dwelling garage and NMAC 14.7.2 (2021 New Mexico Commercial Building Code / IBC) for the commercial slab
D.Only ACI 318; NMAC does not adopt IBC or IRC
Explanation: NMAC 14.7.3 adopts the 2021 IRC as the New Mexico Residential Building Code for one- and two-family dwellings and their accessory structures. NMAC 14.7.2 adopts the 2021 IBC as the New Mexico Commercial Building Code. A GS-4 contractor must read the correct book for the occupancy.
9A 30-foot by 40-foot pad has an existing grade of 102.4 feet and a proposed subgrade of 101.1 feet. Assuming a level cut over the whole pad, how many cubic yards of excavation are required?
A.44.4 cubic yards
B.52.0 cubic yards
C.57.8 cubic yards
D.75.1 cubic yards
Explanation: Cut depth is 102.4 − 101.1 = 1.3 feet. Volume = 30 × 40 × 1.3 ÷ 27 = 1,560 ÷ 27 = 57.8 cubic yards. Existing above proposed is cut; the reverse would be fill.
10How many cubic feet are in one cubic yard of concrete?
A.9 cubic feet
B.27 cubic feet
C.36 cubic feet
D.81 cubic feet
Explanation: A cubic yard is 3 feet × 3 feet × 3 feet = 27 cubic feet. Every GS-4 quantity takeoff that reports cubic yards divides cubic feet by 27.

About the NM CID GS-4 Exam

The New Mexico CID GS-4 examination covers concrete, cement, walkways, and driveways. The official open-book PSI exam has 60 scored questions, a 75% passing standard (45 points), and 150 minutes allowed. Allowed references include OSHA 29 CFR 1926, PCA Design and Control of Concrete Mixtures (17th, 2021), Pipe and Excavation Contracting, NMAC 14.7.2 and 14.7.3 (2021), IBC 2021, IRC 2021, ACI formwork and reinforcing-bar references, and ACI 318. PSI lists the fee at USD 68.88 (bulletin updated 4/3/2026). This English-language MCQ bank is a study aid, not an official PSI form.

Exam sponsor: PSI Services LLC (for New Mexico Construction Industries Division). The requirements and fees below concern the certification or admission exam, separate from our free practice resources.

Questions

60 questions

Time Limit

150 minutes

Passing Score

75% (45 of 60 points)

Exam / Certification Fees

USD 68.88

Exam sponsor website

Fees, eligibility, and exam policies can change. Confirm them with the exam sponsor before applying or paying.

Our practice resources: topics covered

We aim to reflect publicly available exam outlines and topic information in our study resources. Coverage, format, and difficulty may differ from the actual exam, and we cannot guarantee that every detail is accurate or current. Confirm exam requirements, fees, and policies with the official exam sponsor.

17%

Estimating and Plan Reading

Estimating and plan reading (10 items)

20%

Layout and Excavation

Layout and excavation (12 items)

13%

Formwork

Formwork (8 items)

13%

Reinforcing Steel

Reinforcing steel (8 items)

27%

General Concrete

General concrete (16 items)

10%

Safety

Safety (6 items)

Preparing for the NM CID GS-4 Exam

What You Need to Know

  • Passing score: 75% (45 of 60 points)
  • Exam length: 60 questions
  • Time limit: 150 minutes
  • Exam / certification fees: USD 68.88 Official sources

Using Our Practice Resources

  • Work through all 100 available questions
  • Review every answer and explanation
  • Track weak areas and revisit them
  • Use our AI tutor for tough concepts

NM CID GS-4: Suggested Study Strategy

1General concrete is 16 of 60 official items. Study PCA mixtures with ACI formwork and rebar placing.
2This bank is an English-language MCQ study aid, not an official PSI form

Frequently Asked Questions

How many questions are on the NM GS-4 exam?

The official PSI examination has 60 scored questions. Passing is 75% (45 points) within 150 minutes (bulletin updated 4/3/2026).