Key Facts: C-13 Fencing Exam

3.5 hours

per required examination

CSLB examination FAQ

4 years in 10

usual qualifier experience; training credit may apply

CSLB 2026 law book, CCR 825

$450

application fee; not the PSI exam fee

CSLB fee schedule

$51.43

each PSI examination attempt

PSI candidate bulletin

50%

approximate installation/repair weight

CSLB C-13 guide, March 2026

21 days

retake wait within eligibility window

CSLB examination FAQ

The CSLB C-13 trade examination is a 3.5-hour closed-book multiple-choice exam delivered by PSI. Its four approximate topic weights are 16%, 18%, 50% and 16%. Exact official item count is not published in the inspected guide; the site has 107 separate practice items. Application, examination and license-issuance fees are distinct.

Sample C-13 Fencing Practice Questions

Try these sample questions to review concepts for the C-13 Fencing exam. Each question includes a detailed explanation. Start the interactive quiz above for the full 107+ question experience with AI tutoring.

1Estimate concrete for ten cylindrical holes, each 12 inches in diameter and 36 inches deep. Ignore post displacement and overbreak, then add the specified 15% allowance. What is the approximate volume?
A.0.87 cubic yard.
B.4.01 cubic yards.
C.27.10 cubic yards.
D.1.00 cubic yard.
Explanation: Radius = 0.5 ft and depth = 3 ft. Ten holes require 10 x pi x 0.5^2 x 3 = 23.562 cubic feet. With the allowance: 23.562 x 1.15 / 27 = 1.0036 cubic yards, approximately 1.00. This rounded estimate is not exactly one yard; actual purchase quantity also accounts for site and supplier conditions.
2A straight fence follows a uniform 15% grade over a horizontal plan distance of 200 feet. What is its approximate length along the slope?
A.170.0 feet.
B.202.2 feet.
C.200.0 feet.
D.230.0 feet.
Explanation: A 15% grade means rise/run = 0.15, so the rise is 30 ft. The sloping length is sqrt(200^2 + 30^2) = 202.237 ft, or about 202.2 ft. Percent grade is not an angle in degrees.
3An open, straight 350-foot chain-link run has an end post at each end, no gates, and 10-foot post bays. Fabric comes in 50-foot rolls with no allowance. How many rolls and interior line posts are needed?
A.6 rolls and 36 line posts.
B.7 rolls and 36 line posts.
C.7 rolls and 34 line posts.
D.8 rolls and 35 line posts.
Explanation: Fabric requires 350 / 50 = 7 rolls. There are 350 / 10 = 35 bays and 36 total posts. Subtract the two end posts to get 34 interior line posts. An enclosed perimeter would have different endpoint counting.
4Four cylindrical holes are each 16 inches in diameter and 42 inches deep. A specified bag yields 0.45 cubic foot. Ignoring post displacement and waste, what is the minimum whole-bag quantity?
A.11 bags.
B.20 bags.
C.43 bags.
D.44 bags.
Explanation: Radius = 8/12 ft and depth = 42/12 ft. Total volume = 4 x pi x (8/12)^2 x (42/12) = 19.548 cubic feet. Dividing by 0.45 gives 43.439 bags; round up to 44 whole bags. Site allowances would be additional.
5An adopted project specification uses the CLFMI template limit for chain-link line-post intervals, with no stricter project requirement. What maximum spacing does that template state?
A.10 feet on center.
B.12 feet on center.
C.15 feet on center.
D.20 feet on center.
Explanation: The inspected CLFMI specification template, Part 3.2, states intervals not exceeding 10 ft on center. This is the stated template limit, not proof that 10 ft is adequate for every fence. Wind, fabric, height, loads and site design may require closer spacing.
6The building department confirms that a proposed ordinary fence is exempt from a building permit. Which conclusion is correct when planning its location and height?
A.The exemption also waives zoning setbacks.
B.Zoning and other applicable restrictions still apply.
C.The exemption also approves a pool enclosure.
D.The exemption also approves work in an easement.
Explanation: A permit exemption does not authorize violations of other applicable law. Verify zoning, property rights, easements and any special pool, visibility or fire-access requirements. The answer does not assume a universal California front-yard height or that one code exemption resolves every approval.
7In the March 2017 CLFMI framework specification, which description identifies Group IA pipe rather than confusing framework with fabric or solid stock?
A.Cold-formed aluminum channel.
B.Stainless-steel solid bar.
C.Schedule 40 galvanized steel pipe.
D.Copper-coated solid steel rod.
Explanation: The March 2017 CLFMI specification template identifies Group IA Schedule 40 pipe under ASTM F1083 and discusses framework groups under ASTM F1043. Fabric specifications are separate. Use the actual project-selected material and grade.
8A takeoff calls for 1,000 usable cedar pickets. The estimator explicitly allows another 100 to 150 pickets for cuts and rejected pieces. What allowance, relative to the usable quantity, is being applied?
A.2% to 3%.
B.5% to 6%.
C.8% to 9%.
D.10% to 15%.
Explanation: The allowance is 100/1,000 to 150/1,000, or 10% to 15%. These are supplied estimating assumptions, not a universal lumber-waste requirement. Actual allowance depends on layout, stock lengths, quality and purchasing conditions.
9Before setting a fence near a disputed property boundary, what provides the appropriate basis for establishing its alignment?
A.A licensed boundary survey.
B.The alignment of a nearby existing fence.
C.An assessor map scaled with a ruler.
D.The position of the overhead service drop.
Explanation: A disputed boundary needs qualified survey resolution using the relevant records and monuments. Existing fences, assessor maps and utilities may provide context, but none independently establishes the legal boundary. Installing a fence is not authorization to perform licensed boundary surveying.
10For an enclosure governed by California Health and Safety Code section 115923, what is the maximum vertical clearance between the ground and the bottom of the enclosure?
A.1 inch.
B.2 inches.
C.4 inches.
D.6 inches.
Explanation: Section 115923(c) sets a maximum bottom clearance of 2 inches. Its separate sphere-opening criterion does not increase that bottom clearance. This question addresses the state Swimming Pool Safety Act enclosure, not a claimed concrete-deck exception from another rule.

About the C-13 Fencing Exam

The C-13 Fencing Contractor Examination evaluates knowledge of planning and estimating, post installation, fence and gate repair, and safety protocols under California standards.

Exam sponsor: California Contractors State License Board (CSLB). The requirements and fees below concern the certification or admission exam, separate from our free practice resources.

Assessment

Closed-book, computer-delivered multiple choice with four options and one best answer; calculator supplied and no guessing penalty. The inspected official guide does not publish an exact live or scored item count.

Time Limit

3.5 hours (210 minutes) per required examination

Passing Score

The required percentage is communicated at the test site; no fixed C-13 percentage is published in the inspected official guide.

Exam / Certification Fees

$51.43 per exam attempt

Exam sponsor website

Our practice resources: topics covered

We aim to reflect publicly available exam outlines and topic information in our study resources. Coverage, format, and difficulty may differ from the actual exam, and we cannot guarantee that every detail is accurate or current. Confirm exam requirements, fees, and policies with the official exam sponsor.

16%

Planning and Estimating

Evaluate plans, read blueprints, estimate materials, and determine project costs and scope.

18%

Preparation and Post Installation

Site preparation, layout, digging, concrete mixing, and setting various types of posts.

50%

Fence, Gate, and Rail Installation and Repair

Chain-link, agricultural, wood, ornamental, vinyl, and composite and laminate fences and gates; playgrounds, swimming pools and game courts; flagpole installations.

16%

Safety

Personnel safety, Cal/OSHA procedures and environmental safety.

Preparing for the C-13 Fencing Exam

What You Need to Know

  • Passing score: The required percentage is communicated at the test site; no fixed C-13 percentage is published in the inspected official guide.
  • Assessment: Closed-book, computer-delivered multiple choice with four options and one best answer; calculator supplied and no guessing penalty. The inspected official guide does not publish an exact live or scored item count.
  • Time limit: 3.5 hours (210 minutes) per required examination
  • Exam / certification fees: $51.43 per exam attempt Official sources

Using Our Practice Resources

  • Work through all 107 available questions
  • Review every answer and explanation
  • Track weak areas and revisit them
  • Use our AI tutor for tough concepts

C-13 Fencing: Suggested Study Strategy

1Work material takeoffs with explicit units, geometry, waste and whole-unit purchasing assumptions.
2Use the four approximate C-13 blueprint weights to plan revision; installation and repair accounts for half.
3Study current Cal/OSHA conditions and exceptions for excavation, heat, silica, tools and overhead lines.
4Distinguish pool-enclosure gates, house doors and removable mesh systems; do not mix their latch rules.
5Apply the specified footing, product and gate-safety detail; avoid memorizing a universal post depth or tail length.

Frequently Asked Questions

What is the C-13 examination format and timing?

Closed-book, computer-delivered multiple choice with four options and one best answer; calculator supplied and no guessing penalty. The inspected official guide does not publish an exact live or scored item count. CSLB provides 3.5 hours for each exam. Law and Business is a separate examination when required.

What is the official C-13 blueprint?

The March 2026 guide gives approximate weights of 16% Planning and Estimating, 18% Preparation and Post Installation, 50% Fence, Gate, and Rail Installation and Repair, and 16% Safety. The 50 flashcards allocate 8, 9, 25 and 8 cards respectively; the separate site practice inventory is 107 items.

What does C-13 authorize?

CCR 832.13 covers the listed fences, enclosures, railings, posts, flagpoles and gates, and explicitly excludes masonry walls. Do not treat C-13 as a stand-alone masonry, general ornamental-metal or electrical license. Other work requires a valid classification or a genuinely applicable incidental-and-supplemental route.

What experience and issuance requirements apply?

The qualifying individual normally needs four years of qualifying journey-level experience within the preceding ten years. Approved education or apprenticeship credit can count for at most three years. Age, fingerprinting, required exams, issuance fees, the $25,000 contractor bond and applicable insurance/bond requirements also matter; new applicants also complete CSLB’s asbestos open-book requirement unless previously completed. Passing alone does not issue a license.

What are the fees?

Original application: $450. PSI charges $51.43 per exam attempt; trade plus Law and Business costs $102.86 when both are required. Initial license fee is separate: $200 sole owner or $350 other entity. Fingerprinting, bond premiums, insurance and other applicable costs are additional.

What is the retake policy?

Wait 21 calendar days after a failed attempt and pay PSI for each new attempt. Pass all required examinations before the application's 18-month void date; use the actual acceptance date rather than converting calendar months to a fixed number of days.

Can a C-13 business without employees claim a workers' compensation exemption?

Under the rule in force in 2026, a qualifying no-employee business may file the required exemption if it does not also hold a classification for which coverage is mandatory regardless of employees. The current law schedules the broader requirement for January 1, 2028. Do not assume the exemption applies merely because the business currently has no payroll.

Are these resources a substitute for the applicable construction detail?

No. They teach calculations, code distinctions and installation decisions. Footings, gate geometry, anchorage and product clearances require the actual design and manufacturer instructions. The current exam guide lists the 2025 California Building Code; CLFMI templates and individual gate manuals are identified as examples, not universal California rules.

Is C-13 offered as a Spanish-language exam?

The current CSLB FAQ lists ten Spanish exams and does not include C-13. Approved translator arrangements may be requested for other trade exams/languages. Apply through the official process before scheduling; an online translated study page is not proof of a translated exam.