Key Facts: CSLB C-10 Electrical Exam

3.5

Hours Duration

CSLB Study Guide

4

Years Experience Required

CSLB Requirements

$450

Application Fee

CSLB Fees

5

Major Topic Areas

Exam Outline

18%

Safety Weight

Exam Outline

The CSLB C-10 Electrical exam is a 3.5-hour computer-delivered test administered by PSI. It requires 4 years of journey-level experience and a $450 application fee. Topic weights include Planning and Estimating (28%), Rough Wiring (27%), Finish Wiring and Trim (11%), Startup, Troubleshooting, and Maintenance (16%), and Safety (18%).

Sample CSLB C-10 Electrical Practice Questions

Try these sample questions to test your CSLB C-10 Electrical exam readiness. Each question includes a detailed explanation. Start the interactive quiz above for the full 100+ question experience with AI tutoring.

1A 2,400 sq ft single-family dwelling unit requires a standard service load calculation per CEC Article 220. The general lighting (3 VA/sq ft), two small appliance circuits (1,500 VA each), and one laundry circuit (1,500 VA) total 11,700 VA before demand factors. What is the net calculated demand load for these combined general lighting and appliance loads after applying CEC Table 220.42 demand factors?
A.6,045 VA
B.7,110 VA
C.8,700 VA
D.9,250 VA
Explanation: Per CEC Table 220.42, the first 3,000 VA of general lighting and small appliance load is calculated at 100% (3,000 VA). The remaining load of 8,700 VA (11,700 VA - 3,000 VA) is calculated at 35%, which equals 3,045 VA. Adding 3,000 VA and 3,045 VA yields a net calculated demand load of 6,045 VA.
2A single-phase 240V branch circuit supplies a 20A continuous load across a one-way length of 150 feet using 10 AWG solid copper conductors (K = 12.9, circular mil area = 10,380 CM). What is the estimated line-to-line voltage drop for this run?
A.4.85 volts
B.7.46 volts
C.9.92 volts
D.12.3 volts
Explanation: Voltage drop for a single-phase two-wire circuit is calculated using VD = (2 x K x I x L) / CM. Substituting the values yields VD = (2 x 12.9 x 20 A x 150 ft) / 10,380 CM = 77,400 / 10,380 = 7.46 V. CEC Informational Notes recommend limiting branch circuit voltage drop to 3% (7.2V on 240V).
3A balanced 480V three-phase commercial feeder supplies a 100A continuous load over a distance of 300 feet using 1/0 AWG THHN copper conductors (K = 12.9, circular mil area = 105,600 CM). What is the approximate percentage voltage drop for this feeder?
A.0.85 percent
B.2.45 percent
C.1.32 percent
D.3.68 percent
Explanation: Three-phase voltage drop is calculated using VD = (1.732 x K x I x L) / CM. Substituting values gives VD = (1.732 x 12.9 x 100 A x 300 ft) / 105,600 CM = 670,284 / 105,600 = 6.35 V. Dividing 6.35 V by 480 V gives 0.0132 or 1.32%, which complies with the CEC 3% feeder limit recommendation.
4An electrical contractor is calculating the main feeder demand load for a multi-family building with four 12 kW household electric ranges. According to CEC Table 220.55 Column C, what is the total maximum demand load for these four ranges?
A.48 kW demand
B.28 kW demand
C.24 kW demand
D.17 kW demand
Explanation: Per CEC Table 220.55 Column C, the maximum demand for four 12 kW household electric ranges is listed directly as 17 kW. Because all ranges are rated 12 kW (not exceeding 12 kW), no additional 5% increase per kW is required.
5When calculating feeder and service loads for commercial kitchen equipment under CEC Table 220.56, what demand factor applies to a facility equipped with six (6) thermostatically controlled commercial electric kitchen appliances?
A.65 percent
B.70 percent
C.80 percent
D.100 percent
Explanation: CEC Table 220.56 specifies demand factors for commercial kitchen equipment. For 1 to 2 units the factor is 100%, 3 units is 90%, 4 units is 80%, 5 units is 70%, and for 6 or more units, the demand factor is 65% of total connected load.
6On architectural electrical plans, what does a wall switch symbol labeled with a subscript '3' ('S3') represent?
A.A single-pole switch with a 3-amp rating
B.A three-way switch controlling a luminaire
C.A three-pole switch for three-phase equipment
D.A smart switch requiring a neutral conductor
Explanation: Standard electrical plan symbols per ANSI/IEEE standards use 'S' for a single-pole switch, 'S3' for a three-way switch, and 'S4' for a four-way switch. Three-way switches permit controlling a lighting load from two distinct locations.
7According to CEC Chapter 9, Table 1, what is the maximum allowable percentage conduit fill for cross-sectional area when installing three or more conductors of any size in a single raceway?
A.31 percent
B.53 percent
C.40 percent
D.60 percent
Explanation: CEC Chapter 9, Table 1 specifies that one conductor allows 53% fill, two conductors allow 31% fill, and three or more conductors allow a maximum of 40% conduit fill of the internal cross-sectional area of the raceway. The 40% limit for three or more conductors balances heat dissipation needs against practical wire-pulling friction. A higher 60% fill is permitted only for conduit nipples 24 inches or shorter between enclosures, where heat and pulling concerns are minimal.
8An estimator calculates that installing 400 feet of 3/4-inch Electrical Metallic Tubing (EMT) exposed on concrete walls requires 1.5 labor hours per 100 feet. If the electrician's fully burdened labor rate is $85/hour, what is the estimated total direct labor cost for this conduit installation?
A.340 dollars
B.425 dollars
C.480 dollars
D.510 dollars
Explanation: Installing 400 feet of conduit at 1.5 labor hours per 100 feet requires (400 / 100) x 1.5 = 6.0 total labor hours. Multiplying 6.0 hours by the $85/hour fully burdened labor rate yields a total direct labor cost of $510.
9Under California Title 24, Part 6 (Building Energy Efficiency Standards), what mandatory indoor lighting control requirement applies to nonresidential office spaces greater than 100 square feet?
A.Occupants must have manual controls plus automatic shut-off controls
B.Lighting must operate continuously during business hours without switches
C.All luminaires must be hardwired directly to emergency backup batteries
D.Only dimmable LED fixtures operating below 12 volts may be installed
Explanation: California Title 24 Part 6 Section 130.1(c) mandates that nonresidential indoor lighting systems must have occupant-accessible manual controls plus automatic shut-off controls (such as occupancy sensors or automatic time-switch controls) to reduce energy consumption.
10A commercial building main service supplies a continuous non-lighting load of 160A and a non-continuous load of 80A. Per CEC 215.3 and 230.42, what is the minimum required rating for the service-entrance conductors and overcurrent device (assuming standard 75°C terminations)?
A.240 amperes
B.280 amperes
C.300 amperes
D.320 amperes
Explanation: CEC 215.3 and 230.42 require service overcurrent devices and conductors to be sized at not less than 125% of continuous loads plus 100% of non-continuous loads. Calculation: (160 A x 1.25) + 80 A = 200 A + 80 A = 280 A.

About the CSLB C-10 Electrical Exam

The C-10 Electrical exam tests a candidate's knowledge of planning and estimating, rough wiring, finish wiring and trim, startup, troubleshooting, maintenance, and safety based on the California Electrical Code.

Assessment

Question count not published by the exam provider

Time Limit

3.5 hours

Passing Score

Disclosed at test site

Exam Fee

$450 application fee (California Contractors State License Board (CSLB))

CSLB C-10 Electrical Exam Content Outline

28%

Planning and Estimating

Reading blueprints, estimating materials, and planning electrical systems.

27%

Rough Wiring

Installing conduits, boxes, and running conductors according to code.

11%

Finish Wiring and Trim

Installing devices, fixtures, and final terminations.

16%

Startup, Troubleshooting, and Maintenance

Testing systems, finding faults, and performing ongoing maintenance.

18%

Safety

OSHA regulations, arc flash requirements, and general job site safety.

How to Pass the CSLB C-10 Electrical Exam

What You Need to Know

  • Passing score: Disclosed at test site
  • Assessment: Question count not published by the exam provider
  • Time limit: 3.5 hours
  • Exam fee: $450 application fee

Keys to Passing

  • Work through all 100 available questions
  • Review every answer and explanation
  • Track weak areas and revisit them
  • Use our AI tutor for tough concepts

CSLB C-10 Electrical Study Tips from Top Performers

1Review the California Electrical Code (CEC) extensively, focusing on Article 250 (Grounding and Bonding).
2Practice calculating box fill, conduit fill, and voltage drop.
3Understand Cal/OSHA Title 8 electrical safety orders.
4Get familiar with reading and interpreting electrical blueprints and symbols.
5Memorize basic load calculations for residential and commercial services.

Frequently Asked Questions

How long is the C-10 exam?

The exam is 3.5 hours long and delivered via computer.

What is the passing score?

The specific passing score is disclosed at the test site and is not published in advance.

What are the experience requirements?

You need 4 years of qualifying journey-level experience within the past 10 years.

What codes are covered?

The exam primarily covers the California Electrical Code (CEC) and Title 8 safety regulations.