Free ARE 5.0 PcM Exam Flashcards

Memorize 50 essential terms and definitions for the Architect Registration Examination 5.0 — Practice Management. See the term, recall the definition, then flip to check yourself.

50 Flashcards
4 Topics
100% Free
TermClick to flip

Two projects need the same specialist next week. What should the firm check before promising a third deadline?

Tap to reveal definition
Card 1 of 50Business Operations

Filter by Topic

Jump to Card

About These ARE 5.0 PcM Flashcards

These 50 flashcards are designed to help you memorize key terms and definitions for the Architect Registration Examination 5.0 — Practice Management. Each card shows a term on the front and its definition on the back—the classic flashcard format for vocabulary memorization. Use these alongside our practice questions to build both recall and comprehension.

Topics Covered

Business Operations12 cards
Finances, Risk, & Development of Practice16 cards
Practice-Wide Delivery of Services12 cards
Practice Methodologies10 cards

Complete Flashcard Reference

Review every term in this set. Open any term to reveal its definition.

Two projects need the same specialist next week. What should the firm check before promising a third deadline?

Compare the specialist’s available hours with the work and deadlines already assigned. If there is a gap, adjust a commitment or secure qualified support before promising the date.

A proposal requires laboratory planning expertise the firm lacks. How can it fill that capability gap?

Engage a qualified laboratory planning consultant and confirm their availability and role before committing. The combined team needs the expertise to perform the work it proposes.

Only one employee can restore the office’s project files. Which staffing policy reduces that continuity risk?

Train a backup and give them the authorized access needed to carry out the recovery procedure. Test the handoff while the primary employee is available.

What costs beyond the license price should a firm include when evaluating new energy-modeling software?

Estimate paid training time, setup and ongoing support. Compare the full adoption cost with expected use on projects before deciding whether to invest.

When does federal overtime generally start for a covered, nonexempt architecture firm employee?

After 40 hours worked in a workweek. The Fair Labor Standards Act generally requires at least 1.5 times the regular rate for the overtime hours.

What should a covered firm do when a qualified employee requests a disability accommodation and the solution is unclear?

Discuss the job barrier and possible effective adjustments with the employee. The ADA requires reasonable accommodation for a qualified individual unless it would impose undue hardship.

What workplace hazards does the federal OSHA General Duty Clause address?

It requires covered employers to protect their employees from recognized hazards that cause or are likely to cause death or serious physical harm. Check first for a specific OSHA standard that applies to the hazard.

Under AIA Rule 3.201, when may a member proceed if a financial interest could affect professional judgment?

After fully disclosing the interest and obtaining consent from everyone who relies on that judgment. Check any separate licensing-board requirements before proceeding.

Under NCARB’s Model Rules, may an architect accept a supplier payment in exchange for specifying its product?

Decline the payment. Model Rule 2.2 bars compensation from a supplier for specifying or endorsing its products on a project.

Under NCARB Model Rule 3.5, who receives a report if a client overrides the architect’s advice and a building-law violation materially threatens public safety?

Report the decision to the official who enforces the applicable building laws and refuse to consent to it. The rule applies when the architect judges the public health or safety effect to be materially adverse.

Whose performance is the benchmark for an architect’s professional standard of care?

The benchmark is the ordinary skill and care of competent architects working under similar circumstances in the same or a comparable locality. The circumstances of the work matter when evaluating performance.

Why is a brief review of another firm’s completed architectural drawings generally insufficient to seal them?

A seal ordinarily requires responsible control, which involves professional knowledge of and supervision over preparation. Check the licensing board’s rules for the jurisdiction and any applicable exceptions.

Why can a firm with an accrual profit still struggle to cover payroll?

Revenue may have been recognized before clients paid their invoices. Compare collections and cash on hand with near-term outflows such as payroll.

Which financial statement shows an architecture firm’s assets, liabilities, and equity on a specific date?

The balance sheet. Assets equal liabilities plus equity, giving a snapshot of the firm’s financial position on that date.

A team books 108 project hours out of 160 compensated hours. What is its hours-based utilization?

67.5%. Divide project hours by total compensated hours, 108 ÷ 160. The result measures the share of paid time spent on project work.

Overhead is $510,000 and direct labor is $300,000. What is the overhead rate?

1.70, or 170%. Divide indirect costs by direct labor cost. The firm incurs $1.70 of overhead per dollar of direct labor.

If a firm’s overhead rate is 1.45, what net multiplier lets it break even?

2.45. Add 1.00 to the overhead rate to recover both the direct labor dollar and the $1.45 of associated overhead.

A project earns $93,000 in net service revenue on $30,000 of direct labor. What is its net multiplier?

3.10. Divide net service revenue by direct labor cost. The multiplier shows how much net revenue each dollar of direct labor generates.

Why should a firm separate signed backlog from proposals when planning next quarter’s workload?

Backlog is remaining work under contract. Proposals are prospective work. Keeping them separate lets the firm staff its commitments and account for uncertainty in potential awards.

Which coverage should a firm examine first for a claim alleging that a design error caused a loss?

Professional liability coverage, also called errors and omissions coverage. Commercial general liability commonly addresses risks such as a visitor’s injury at the office. Policy terms govern coverage.

Which dates matter when evaluating a claim under a claims-made-and-reported policy?

Check when the claim was first made, when it was reported, and whether the alleged act falls on or after any applicable retroactive date. Use the policy’s reporting window and any extended reporting provision.

What does a $3 million aggregate limit mean on a professional liability policy with a $1 million per-claim limit?

The $3 million limit is shared across covered claims in the applicable policy period. The $1 million per-claim limit still applies to each individual claim, subject to the policy terms.

Why is an owner’s proposed duty-to-defend clause a risk for the architect?

It can require paying for the owner’s defense before fault is established. That separate contractual duty may fall outside the architect’s professional liability coverage.

What risk does a promise of error-free drawings add to an owner-architect agreement?

It can create a contractual obligation beyond the ordinary standard of care. A claim based on the promise may fall outside the firm’s professional liability coverage.

What does mediation do before binding dispute resolution under the standard AIA B101–2017?

A neutral mediator helps the parties try to settle. The mediation itself is nonbinding. B101 makes it a prerequisite to the applicable binding dispute process.

Under unmodified B101–2017, the owner changes an approved program and requests redesign. What should the architect do before starting?

Promptly explain why the redesign is an Additional Service, identify the expected fee and schedule effects, and obtain the owner’s written authorization before doing the redesign.

Under standard B101–2017, what does the owner receive for use of the architect’s Instruments of Service?

A nonexclusive license for agreed uses on the project, subject to the contract terms. The architect and its consultants retain ownership of their respective work, including copyright.

What fee approach can fit a short feasibility study when the hours are difficult to estimate?

Use hourly rates with a defined scope and, if agreed, a spending cap. A review before the cap lets the owner decide whether to authorize more work.

A request for proposals asks for a “complete renovation design” without listing deliverables. What should the firm clarify before quoting a fee?

Clarify the required phases, deliverables and consultant services. A defined scope lets the firm estimate hours and compare the fee with what the client expects.

Under the U.S. federal qualifications-based process for architect-engineer services, when is the fee negotiated?

After firms are ranked on qualifications. The contracting officer starts with the highest-ranked firm and moves to the next only if a satisfactory agreement cannot be reached.

Why should a proposal identify who provides the existing-building survey?

The survey is an input the team needs to price and schedule the work. If the owner provides it, identify when it is due and state any assumptions about its completeness.

Which parties use AIA B101–2017 when contracting for building design and construction contract administration?

The owner and architect. B101 establishes their scope and compensation and distinguishes Basic Services from Supplemental Services identified at signing and Additional Services that can arise later.

Which agreement helps an architect pass relevant owner-architect obligations down to its own structural consultant?

AIA C401–2017, the architect-consultant agreement. It incorporates the prime agreement so applicable duties can flow down to the consultant’s services.

How does the owner contract for design and construction in conventional design-bid-build?

The owner contracts separately with the architect and the contractor. The design is generally developed for bidding before the construction contract is awarded. AIA A201 sets out construction general conditions when incorporated.

What contractual arrangement gives the owner one entity responsible for both design and construction?

Design-build. The owner contracts with the design-builder for both services. AIA A141 is an owner–design-builder agreement for traditional design-build.

What distinguishes a construction manager as constructor from a construction manager as adviser?

The constructor provides preconstruction input and takes responsibility for construction. An adviser provides management advice while the owner contracts separately for construction.

What makes AIA C191–2009 a multi-party agreement for integrated project delivery?

The owner, architect, contractor and any other participating signatories sign one agreement. They collaborate toward jointly established cost and performance goals.

A renovation has missing as-builts and concealed structure. What step reduces design risk before committing to a structural approach?

Propose a defined investigation of critical existing conditions. Agree with the owner on access, responsibilities and the resulting schedule before relying on assumptions about the building.

What risk increases if a firm releases an early foundations package while the building layout is still changing?

Later design changes may invalidate loads or locations used in the early package. Identify and confirm the inputs that the foundations depend on before release.

How can a firm reduce schedule risk when a client committee meets only monthly?

Set decision deadlines around the committee’s meeting calendar and record the milestones that depend on those approvals. Include that decision schedule in the proposed work plan.

What financial exposure does a sole proprietor generally have for firm debts?

The owner is personally liable for the business’s obligations. A sole proprietorship gives the owner direct control without creating a separate business entity.

What should a firm verify before forming a conventional LLC to offer architectural services?

Check whether the jurisdiction permits that entity type and what ownership and firm authorization rules apply. A jurisdiction may require a professional entity or another permitted form.

What must an NCARB Certificate holder check before offering regulated services in a new state?

Confirm the new jurisdiction’s individual licensure requirements and any applicable firm authorization. The NCARB Certificate can support reciprocal licensure, while the jurisdiction grants authority to practice.

What does AIA C101–2018 establish when two firms pursue one commission together?

It sets governance and participant obligations for the joint venture. The venture separately contracts with the client for the professional services.

How can a firm use succession planning before a principal retires?

Identify potential successors early and give them increasing responsibility for client relationships and firm management. The overlap transfers knowledge before the principal leaves.

What does a firmwide quality assurance checklist standardize?

It establishes what every team should check and when. Adapt the checklist to the project’s scope and risks so review steps fit the actual work.

What is the purpose of a fresh set of eyes at a drawing quality control review?

A qualified reviewer who did not prepare the set can find omissions or conflicts the authors may overlook. Assign corrections and verify them before issuing the set.

What should a BIM execution plan clarify about models exchanged for coordination?

Identify who issues each model, when it is shared and what recipients may rely on it for. State any limits on reliance when sharing an interim version.

How does a firm’s standard drawing transmittal help when several revisions circulate?

It records which drawing versions were sent, when, to whom and for what purpose. The project record then helps identify the set that was issued for a particular use.

How can a firm turn a repeated project error into a practice-wide improvement?

Use the closeout review to identify the cause and update the relevant office checklist or template. Share the change so future teams can apply it.

Frequently Asked Questions

What topics do these ARE Practice Management flashcards cover?

The cards cover all four PcM sections. Review Business Operations, Finances, Risk, & Development of Practice, Practice-Wide Delivery of Services, and Practice Methodologies.

How many questions are on ARE 5.0 Practice Management?

NCARB lists 65 items, of which 59 are scored and 6 are unscored pretest items. Up to 14 of the 65 can be case study items across as many as six case studies. Standalone and case study items use multiple choice, check-all-that-apply, or hotspot formats.

How long is the ARE Practice Management exam?

PcM allows 2 hours and 40 minutes for testing. Your appointment is 3 hours and 20 minutes, including 30 minutes of optional break time and 10 minutes for introductory and closing screens.

What score passes ARE Practice Management?

The minimum is 550 on NCARB’s 100–800 scale. NCARB reports a raw cut-score range of 59%–71% of scored items for Practice Management and Project Management, with the percentage depending on the exam form. The result is based on your overall division performance.

Who can schedule the ARE Practice Management division?

Candidates with an active NCARB Record and testing eligibility for their selected licensing jurisdiction can schedule PcM. Eligibility requirements depend on the jurisdiction.

When can I retake ARE Practice Management if I fail?

NCARB allows a retake at least 60 days after your previous PcM attempt, subject to a maximum of three attempts at the division in any rolling 12-month period. Your eligibility also depends on your licensing jurisdiction’s rules.