Cheat sheet

ARE 5.0 Practice Management Cheat Sheet

Quick Facts

Exam owner
NCARB
Guidelines edition
October 2026
Items
65 total, 59 scored, 6 pretest
Active testing
2 hr 40 min
Optional break time
30 min
Total appointment
3 hr 20 min
Case studies
Up to 6
Case study items
Up to 14 total
Item types
Multiple choice, check-all-that-apply, hotspot
Live cut score range
59–71% of scored items
2025 PcM pass rate
51% first-time and repeat
NCARB division fee
$263
Delivery
PSI test center or online

Conflict Check

Disclose, obtain consent, then proceed

Name affected interestsEveryone relying on judgmentCheck jurisdiction’s conflict rules

AIA Ethics vs NCARB Model Rules

AIA code

  • Applies to AIA members
  • Institute disciplinary process

NCARB model rules

  • Framework for licensing boards
  • Check jurisdiction’s adopted rules

Identify the governing authority

Staffing and Ethics Decisions

  1. Short peak in workload→Rebalance qualified staff(Check deadlines and capacity)
  2. Persistent skills shortage→Plan targeted hiring or training(Use forecasted demand)
  3. New jurisdiction→Check licensing board rules(Confirm firm authorization where required)
  4. Asked to seal outside supervision→Check responsible control(Apply local sealing rules)
  5. Interest may impair judgment→Fully disclose and obtain consent(All relying on your judgment)
  6. Material change to project objectives→Obtain client consent(AIA Rule 3.103)
  7. Unknown conditions affect public safety→Investigate and document findings(Engage qualified specialists as needed)

Staffing and Resources

Staffing forecast
Demand by skill and week
Capacity
Available staff time by role
Backlog
Fees remaining on contracted work
Staffing gap
Demand exceeds available staff time
Hiring criteria
Skills tied to role requirements
Performance review
Feedback against agreed expectations
Capital expenditure
Investment in long-lived assets

Standard of Care vs Guarantee

Standard of care

  • Ordinary peer skill and care
  • Comparable circumstances and locality

Performance guarantee

  • Promises a stated result
  • Review added contractual exposure

Evaluate promises against ordinary care

Work Environment

Fair Labor Standards Act (FLSA)
Federal minimum wage and overtime
Covered nonexempt overtime
1.5× regular rate after 40h/week
FLSA payroll records
Track actual hours and pay
ADA Title I
Employment disability protections
Reasonable accommodation
Job access unless undue hardship
OSHA
Workplace health and safety
Workers’ compensation
Work-related injury and illness benefits

Ethics and Licensure

AIA ethics code
Governs AIA member conduct
NCARB model rules
Framework for jurisdictional adoption
Conflict of interest
Full disclosure and informed consent
Material scope change
Obtain the client’s consent
Independent contract interpreter
Decide impartially
Responsible control
Knowledge and supervision underpin sealing
Architect license
Issued by a jurisdictional board
NCARB Certificate
Facilitates reciprocal licensure applications
Standard of care
Ordinary peer skill under comparable conditions
Climate-related vulnerability
Assess risks to public safety

Three Labor Denominators

Total for utilization, direct for net and overhead

Utilization uses total laborNet multiplier uses direct laborOverhead rate uses direct labor

Utilization vs Net Multiplier

Labor-cost utilization

  • Direct labor ÷ total labor
  • Share of payroll on projects

Net multiplier

  • Net revenue ÷ direct labor
  • Revenue per direct labor dollar

Both drive the payroll multiplier

Finance and Coverage Decisions

  1. Net multiplier below breakeven→Review fees and labor costs(Check matching scope and period)
  2. Strong profit, little cash→Review receivables aging(Check actual collections)
  3. Billable demand falls→Reforecast staffing and pipeline(Use contracted backlog first)
  4. Alleged negligent design→Check professional liability coverage(Follow policy notice provisions)
  5. Switching claims-made insurers→Check prior-acts coverage(Preserve eligible retroactive date)
  6. Claims-made coverage ending→Check tail terms(Confirm reporting window)

Firm Finance Formulas

Direct labor
Payroll charged to projects
Total labor
Direct labor + indirect labor
Net revenue
Gross revenue minus direct nonlabor costs
Labor-cost utilization
Direct labor ÷ total labor
Gross hours utilization
Direct project hours ÷ total hours
Net multiplier
Net revenue ÷ direct labor
Payroll multiplier
Labor-cost utilization × net multiplier
Overhead rate
Indirect costs ÷ direct labor
Breakeven multiplier
1 + overhead rate
Net multiplier for operating margin
Breakeven ÷ (1 − target margin)

Cash Flow vs Operating Profit

Cash flow

  • Tracks collections and payments
  • Reveals liquidity pressures

Operating profit

  • Net revenue less operating costs
  • Measures operating performance

Check both before expanding payroll

Financial Statements

Balance sheet
Assets, liabilities, equity at date
Income statement
Period revenue, expenses, profit
Cash flow statement
Cash inflows and outflows
Accounts receivable
Amounts owed to the firm
Accounts payable
Amounts the firm owes
Cash basis
Recognize cash receipts and payments
Accrual basis
Record revenue earned, expenses incurred
Operating margin
Operating profit ÷ net revenue

Claims-Made vs Occurrence

Claims-made

  • Check claim and reporting dates
  • Verify retroactive date

Occurrence

  • Check date of covered event
  • Apply policy notice requirements

Identify the policy’s coverage trigger

Insurance and Claims

Professional liability (E&O)
Claims alleging professional errors
Commercial general liability (CGL)
Covered third-party injury or property damage
Claims-made policy
When claim is first made matters
Occurrence policy
When covered event occurred matters
Retroactive date
Earliest eligible prior act date
Tail coverage
Extends reporting for eligible acts
Deductible
Insured’s retained amount per policy
Mediation
Facilitated negotiation toward settlement
Arbitration
Neutral issues an award

Business Development

Go/no-go review
Screen client, capacity, and exposure
Client due diligence
Verify payment and claims history
Scope baseline
Document deliverables and exclusions
Scope creep
Unapproved expansion of agreed services
Fee proposal
Price scope, staffing, and consultants
Payment terms
Define billing and collection expectations
Risk register
Track exposures, responses, and owners

B101 Basic Service Sequence

Sketch, develop, document, procure, administer

Schematic designDesign developmentConstruction documentsProcurementConstruction phase services

Supplemental vs Additional Services

Supplemental

  • Allocated when signing B101
  • Name the responsible party

Additional

  • Arise after contract execution
  • Check notice and authorization requirements

Check when the scope arose

Contract and Delivery Decisions

  1. Unclear client service request→Clarify scope before pricing(Confirm deliverables and exclusions)
  2. Budget conflicts with requested scope→Reconcile before accepting work(Confirm scope, budget, and schedule)
  3. Defined services and effort→Consider a stipulated sum(Document scope assumptions)
  4. Scope cannot yet be quantified→Consider hourly compensation(Set rates and controls)
  5. Owner requests a new deliverable→Check B101 Article 4(Confirm notice and authorization terms)
  6. Separate design and competitive bids→Consider design-bid-build(Complete documents before bidding)
  7. Single design and construction contract→Consider design-build(One owner-facing entity)
  8. Builder input with construction risk→Consider CM at risk(Price terms vary)
  9. Owner wants adviser only→Consider CM as adviser(Construction contracts stay separate)

AIA Forms and Roles

B101-2017
Owner–architect agreement
C401-2017
Architect–consultant agreement
A101-2017
Owner–contractor stipulated-sum agreement
A201-2017
Construction general conditions
Prime flow-down
Applicable prime terms bind consultant
Construction site visits
Observe progress and general conformance
Construction means and methods
Contractor directs how work proceeds

CM as Adviser vs CM at Risk

CM as adviser

  • Provides construction management advice
  • Owner contracts separately for construction

CM at risk

  • Advises during design
  • Takes on construction responsibility

Trace who contracts to build

B101 Scope and Fees

Article 3
Five basic service phases
Article 4
Supplemental and additional services
Article 7
Instruments of Service and licenses
Article 8
Claims and dispute resolution
Article 11
Compensation and payments
Supplemental services
Allocated at agreement signing
Additional services
Arise after agreement execution
B101 §4.2.1
Written authorization before listed services
B101 §4.2.2
Prompt notice for delay-avoidance services
B101 project-use license
Owner’s use subject to terms
Stipulated sum
Fixed fee for defined scope
Hourly compensation
Agreed rates × actual hours
Percentage compensation
Share of budgeted construction cost

Delivery Methods

Design-bid-build
Separate design and construction contracts
Design-build
One owner-facing design-builder
CM at risk (CMAR)
Early advice, then construction responsibility
CM as adviser (CMa)
Advises without taking construction responsibility
Guaranteed maximum price (GMP)
Ceiling subject to agreed adjustments
Multiparty IPD
Shared risk and reward structure
Fast tracking
Overlaps design and construction

Quality Workflow

Plan the review, check the set

Assurance sets the processControl checks the deliverable

Quality Assurance vs Quality Control

Quality assurance

  • Defines reliable review processes
  • Sets templates and checkpoints

Quality control

  • Checks specific project deliverables
  • Finds discrepancies before issue

Set the process, check output

Quality and Coordination Decisions

  1. Same error across several projects→Revise firm QA process(Update templates and training)
  2. Drawings conflict with specifications→Run coordinated QC review(Resolve before issue)
  3. High-risk package nearing release→Schedule peer review(Use qualified outside-team reviewer)
  4. Teams using different drawing versions→Verify the issue register(Circulate current controlled set)

Firm Structures

Sole proprietorship
One owner, personal business liability
LLC
Generally limits owners’ business liability
LLP
Generally limits partners’ personal liability
Corporation
Separate legal entity from owners
Entity eligibility
Check jurisdiction’s professional practice rules
Functional organization
Staff grouped by shared specialty
Studio organization
Dedicated team across project phases
Matrix organization
Shared specialists span project teams
Principal-led organization
Key decisions routed through principal

Quality and Coordination

Quality assurance (QA)
Set repeatable quality processes
Quality control (QC)
Check deliverables against requirements
Peer review
Reviewer outside responsible project team
Phase checklist
Confirm required deliverables before release
Drawing and specification coordination
Cross-check scope and assemblies
Consultant coordination
Resolve interfaces between disciplines
Version control
Identify current issued documents
Issue log
Track corrections through resolution
Project archive
Preserve issued documents and decisions

Common Traps

Exam scoring

2025 PcM pass rate ≠ Live form cut score

Cash and profit

Earned fees ≠ Collected cash

Finance formula inputs

Net revenue ≠ Gross billings

Insurance timing

Extended reporting window ≠ Coverage for new professional acts

B101 ownership

Author’s copyright ≠ Owner’s project-use license

Construction roles

Architect observes progress ≠ Contractor directs means and methods

Licensure portability

NCARB Certificate supports reciprocity ≠ Board issues reciprocal license

Items after a break

Viewed items become locked ≠ Unseen items remain available

Last Minute

  1. 1.Review viewed items before breaks
  2. 2.Use case study exhibits as evidence
  3. 3.Match staffing to contracted workload
  4. 4.Utilization uses total labor cost
  5. 5.Net multiplier = net revenue/direct labor
  6. 6.Breakeven equals one plus overhead rate
  7. 7.Check claims-made reporting and retroactivity
  8. 8.B101 links owner and architect
  9. 9.C401 flows down applicable prime terms
  10. 10.Confirm scope change authorization requirements
  11. 11.Trace who contracts to build
  12. 12.Check drawings against consultant documents
Same family resources

Explore More ARE 5.0

Continue into nearby exams from the same family. Each card keeps practice questions, study guides, flashcards, videos, and articles in one place.