Business Operations
20-26%of exam
Finances, Risk, & Development of Practice
29-35%of exam
Practice-Wide Delivery of Services
22-28%of exam
Practice Methodologies
17-23%of exam
Quick Facts
- Exam owner
- NCARB
- Guidelines edition
- October 2026
- Items
- 65 total, 59 scored, 6 pretest
- Active testing
- 2 hr 40 min
- Optional break time
- 30 min
- Total appointment
- 3 hr 20 min
- Case studies
- Up to 6
- Case study items
- Up to 14 total
- Item types
- Multiple choice, check-all-that-apply, hotspot
- Live cut score range
- 59–71% of scored items
- 2025 PcM pass rate
- 51% first-time and repeat
- NCARB division fee
- $263
- Delivery
- PSI test center or online
Conflict Check
Disclose, obtain consent, then proceed
AIA Ethics vs NCARB Model Rules
AIA code
- Applies to AIA members
- Institute disciplinary process
NCARB model rules
- Framework for licensing boards
- Check jurisdiction’s adopted rules
Identify the governing authority
Staffing and Ethics Decisions
- Short peak in workload→Rebalance qualified staff(Check deadlines and capacity)
- Persistent skills shortage→Plan targeted hiring or training(Use forecasted demand)
- New jurisdiction→Check licensing board rules(Confirm firm authorization where required)
- Asked to seal outside supervision→Check responsible control(Apply local sealing rules)
- Interest may impair judgment→Fully disclose and obtain consent(All relying on your judgment)
- Material change to project objectives→Obtain client consent(AIA Rule 3.103)
- Unknown conditions affect public safety→Investigate and document findings(Engage qualified specialists as needed)
Staffing and Resources
- Staffing forecast
- Demand by skill and week
- Capacity
- Available staff time by role
- Backlog
- Fees remaining on contracted work
- Staffing gap
- Demand exceeds available staff time
- Hiring criteria
- Skills tied to role requirements
- Performance review
- Feedback against agreed expectations
- Capital expenditure
- Investment in long-lived assets
Standard of Care vs Guarantee
Standard of care
- Ordinary peer skill and care
- Comparable circumstances and locality
Performance guarantee
- Promises a stated result
- Review added contractual exposure
Evaluate promises against ordinary care
Work Environment
- Fair Labor Standards Act (FLSA)
- Federal minimum wage and overtime
- Covered nonexempt overtime
- 1.5× regular rate after 40h/week
- FLSA payroll records
- Track actual hours and pay
- ADA Title I
- Employment disability protections
- Reasonable accommodation
- Job access unless undue hardship
- OSHA
- Workplace health and safety
- Workers’ compensation
- Work-related injury and illness benefits
Ethics and Licensure
- AIA ethics code
- Governs AIA member conduct
- NCARB model rules
- Framework for jurisdictional adoption
- Conflict of interest
- Full disclosure and informed consent
- Material scope change
- Obtain the client’s consent
- Independent contract interpreter
- Decide impartially
- Responsible control
- Knowledge and supervision underpin sealing
- Architect license
- Issued by a jurisdictional board
- NCARB Certificate
- Facilitates reciprocal licensure applications
- Standard of care
- Ordinary peer skill under comparable conditions
- Climate-related vulnerability
- Assess risks to public safety
Three Labor Denominators
Total for utilization, direct for net and overhead
Utilization vs Net Multiplier
Labor-cost utilization
- Direct labor ÷ total labor
- Share of payroll on projects
Net multiplier
- Net revenue ÷ direct labor
- Revenue per direct labor dollar
Both drive the payroll multiplier
Finance and Coverage Decisions
- Net multiplier below breakeven→Review fees and labor costs(Check matching scope and period)
- Strong profit, little cash→Review receivables aging(Check actual collections)
- Billable demand falls→Reforecast staffing and pipeline(Use contracted backlog first)
- Alleged negligent design→Check professional liability coverage(Follow policy notice provisions)
- Switching claims-made insurers→Check prior-acts coverage(Preserve eligible retroactive date)
- Claims-made coverage ending→Check tail terms(Confirm reporting window)
Firm Finance Formulas
- Direct labor
- Payroll charged to projects
- Total labor
- Direct labor + indirect labor
- Net revenue
- Gross revenue minus direct nonlabor costs
- Labor-cost utilization
- Direct labor ÷ total labor
- Gross hours utilization
- Direct project hours ÷ total hours
- Net multiplier
- Net revenue ÷ direct labor
- Payroll multiplier
- Labor-cost utilization × net multiplier
- Overhead rate
- Indirect costs ÷ direct labor
- Breakeven multiplier
- 1 + overhead rate
- Net multiplier for operating margin
- Breakeven ÷ (1 − target margin)
Cash Flow vs Operating Profit
Cash flow
- Tracks collections and payments
- Reveals liquidity pressures
Operating profit
- Net revenue less operating costs
- Measures operating performance
Check both before expanding payroll
Financial Statements
- Balance sheet
- Assets, liabilities, equity at date
- Income statement
- Period revenue, expenses, profit
- Cash flow statement
- Cash inflows and outflows
- Accounts receivable
- Amounts owed to the firm
- Accounts payable
- Amounts the firm owes
- Cash basis
- Recognize cash receipts and payments
- Accrual basis
- Record revenue earned, expenses incurred
- Operating margin
- Operating profit ÷ net revenue
Claims-Made vs Occurrence
Claims-made
- Check claim and reporting dates
- Verify retroactive date
Occurrence
- Check date of covered event
- Apply policy notice requirements
Identify the policy’s coverage trigger
Insurance and Claims
- Professional liability (E&O)
- Claims alleging professional errors
- Commercial general liability (CGL)
- Covered third-party injury or property damage
- Claims-made policy
- When claim is first made matters
- Occurrence policy
- When covered event occurred matters
- Retroactive date
- Earliest eligible prior act date
- Tail coverage
- Extends reporting for eligible acts
- Deductible
- Insured’s retained amount per policy
- Mediation
- Facilitated negotiation toward settlement
- Arbitration
- Neutral issues an award
Business Development
- Go/no-go review
- Screen client, capacity, and exposure
- Client due diligence
- Verify payment and claims history
- Scope baseline
- Document deliverables and exclusions
- Scope creep
- Unapproved expansion of agreed services
- Fee proposal
- Price scope, staffing, and consultants
- Payment terms
- Define billing and collection expectations
- Risk register
- Track exposures, responses, and owners
B101 Basic Service Sequence
Sketch, develop, document, procure, administer
Supplemental vs Additional Services
Supplemental
- Allocated when signing B101
- Name the responsible party
Additional
- Arise after contract execution
- Check notice and authorization requirements
Check when the scope arose
Contract and Delivery Decisions
- Unclear client service request→Clarify scope before pricing(Confirm deliverables and exclusions)
- Budget conflicts with requested scope→Reconcile before accepting work(Confirm scope, budget, and schedule)
- Defined services and effort→Consider a stipulated sum(Document scope assumptions)
- Scope cannot yet be quantified→Consider hourly compensation(Set rates and controls)
- Owner requests a new deliverable→Check B101 Article 4(Confirm notice and authorization terms)
- Separate design and competitive bids→Consider design-bid-build(Complete documents before bidding)
- Single design and construction contract→Consider design-build(One owner-facing entity)
- Builder input with construction risk→Consider CM at risk(Price terms vary)
- Owner wants adviser only→Consider CM as adviser(Construction contracts stay separate)
AIA Forms and Roles
- B101-2017
- Owner–architect agreement
- C401-2017
- Architect–consultant agreement
- A101-2017
- Owner–contractor stipulated-sum agreement
- A201-2017
- Construction general conditions
- Prime flow-down
- Applicable prime terms bind consultant
- Construction site visits
- Observe progress and general conformance
- Construction means and methods
- Contractor directs how work proceeds
CM as Adviser vs CM at Risk
CM as adviser
- Provides construction management advice
- Owner contracts separately for construction
CM at risk
- Advises during design
- Takes on construction responsibility
Trace who contracts to build
B101 Scope and Fees
- Article 3
- Five basic service phases
- Article 4
- Supplemental and additional services
- Article 7
- Instruments of Service and licenses
- Article 8
- Claims and dispute resolution
- Article 11
- Compensation and payments
- Supplemental services
- Allocated at agreement signing
- Additional services
- Arise after agreement execution
- B101 §4.2.1
- Written authorization before listed services
- B101 §4.2.2
- Prompt notice for delay-avoidance services
- B101 project-use license
- Owner’s use subject to terms
- Stipulated sum
- Fixed fee for defined scope
- Hourly compensation
- Agreed rates × actual hours
- Percentage compensation
- Share of budgeted construction cost
Delivery Methods
- Design-bid-build
- Separate design and construction contracts
- Design-build
- One owner-facing design-builder
- CM at risk (CMAR)
- Early advice, then construction responsibility
- CM as adviser (CMa)
- Advises without taking construction responsibility
- Guaranteed maximum price (GMP)
- Ceiling subject to agreed adjustments
- Multiparty IPD
- Shared risk and reward structure
- Fast tracking
- Overlaps design and construction
Quality Workflow
Plan the review, check the set
Quality Assurance vs Quality Control
Quality assurance
- Defines reliable review processes
- Sets templates and checkpoints
Quality control
- Checks specific project deliverables
- Finds discrepancies before issue
Set the process, check output
Quality and Coordination Decisions
- Same error across several projects→Revise firm QA process(Update templates and training)
- Drawings conflict with specifications→Run coordinated QC review(Resolve before issue)
- High-risk package nearing release→Schedule peer review(Use qualified outside-team reviewer)
- Teams using different drawing versions→Verify the issue register(Circulate current controlled set)
Firm Structures
- Sole proprietorship
- One owner, personal business liability
- LLC
- Generally limits owners’ business liability
- LLP
- Generally limits partners’ personal liability
- Corporation
- Separate legal entity from owners
- Entity eligibility
- Check jurisdiction’s professional practice rules
- Functional organization
- Staff grouped by shared specialty
- Studio organization
- Dedicated team across project phases
- Matrix organization
- Shared specialists span project teams
- Principal-led organization
- Key decisions routed through principal
Quality and Coordination
- Quality assurance (QA)
- Set repeatable quality processes
- Quality control (QC)
- Check deliverables against requirements
- Peer review
- Reviewer outside responsible project team
- Phase checklist
- Confirm required deliverables before release
- Drawing and specification coordination
- Cross-check scope and assemblies
- Consultant coordination
- Resolve interfaces between disciplines
- Version control
- Identify current issued documents
- Issue log
- Track corrections through resolution
- Project archive
- Preserve issued documents and decisions
Common Traps
Exam scoring
2025 PcM pass rate ≠ Live form cut score
Cash and profit
Earned fees ≠ Collected cash
Finance formula inputs
Net revenue ≠ Gross billings
Insurance timing
Extended reporting window ≠ Coverage for new professional acts
B101 ownership
Author’s copyright ≠ Owner’s project-use license
Construction roles
Architect observes progress ≠ Contractor directs means and methods
Licensure portability
NCARB Certificate supports reciprocity ≠ Board issues reciprocal license
Items after a break
Viewed items become locked ≠ Unseen items remain available
Last Minute
- 1.Review viewed items before breaks
- 2.Use case study exhibits as evidence
- 3.Match staffing to contracted workload
- 4.Utilization uses total labor cost
- 5.Net multiplier = net revenue/direct labor
- 6.Breakeven equals one plus overhead rate
- 7.Check claims-made reporting and retroactivity
- 8.B101 links owner and architect
- 9.C401 flows down applicable prime terms
- 10.Confirm scope change authorization requirements
- 11.Trace who contracts to build
- 12.Check drawings against consultant documents