Under traditional design-bid-build with one prime builder, how does the owner procure design and construction?
Project Conception And Delivery
Question · Easy
Final walkthrough: the punch list
Short
Which project delivery method combines design and construction services under a single contract with the owner?
Introduction & Exam Overview
0.1 About the CSI CDT Exam
Study guide
What role does the construction manager take on during the construction phase of CM at risk?
Question · Medium
Trades Exam Prep Podcast
Listen on Spotify
Podcast
What is a hallmark of a multiparty Integrated Project Delivery agreement?
A library owner is defining the rooms, capacities, and adjacencies needed before the architect develops layout options. Which activity is underway?
Which role does a construction manager as adviser typically serve?
0.2 How to Use This Study Guide & Exam Strategy
What makes a project fast-tracked?
Before acquiring a proposed building site, which work best addresses the risk that it cannot support the intended project?
Which arrangement normally makes the CM the constructor and uses a guaranteed maximum price?
Who holds separate construction agreements with the trades in a multiple-prime arrangement?
Question · Hard
Chapter 1: Fundamentals — Project Teams, Lifecycle & Legal Context
1.1 Project Teams, Roles & Contractual Relationships
Which design-build document describes the owner’s program and performance expectations for the finished facility?
The owner wants to compare two early concepts for a clinic’s circulation, department adjacencies, and overall massing. Which design-phase deliverable best supports the decision?
Design Process
In an AIA A201–2017 project, which documents establish the architect’s contract administration role and authority?
Fundamentals
Who is generally responsible for construction means, methods, and sequencing under AIA A201–2017?
1.2 Stages of the Facility Life Cycle
A consultant retained by the architect to provide structural, mechanical, or electrical design is BEST described as a(n):
In AIA A201–2017, with whom does a subcontractor have a direct contract for work at the site?
In a conventional project delivery arrangement, who establishes the project requirements and provides project funding?
What is the primary role of a construction surety?
1.3 Legal Implications of Contract Documents & Sustainable Design
A building permit is required before field work. Which party issues the permit after the required regulatory review?
Preconstruction
An owner can retain an existing structural frame while renovating the rest of a building. Which sustainability strategy does keeping the frame illustrate?
AIA A201–2017 applies and the agreement has no special provision incorporating bid paperwork. Which item is normally excluded from the Contract Documents?
Construction Documents
Which description best fits a project manual?
Chapter 2: Fundamentals — CSI Written & Graphic Formats
2.1 Written Formats: Classification, Preliminary Descriptions & Product Data
The drawings and specifications conflict. The contract requires clarification of discrepancies and gives neither document automatic priority. What should the contractor do?
The owner has approved a schematic layout. The team is now selecting major systems and coordinating mechanical, electrical, plumbing, structural, and architectural layouts. Which phase is this?
Which drawing view best shows how a stair, intermediate landing, and upper floor align vertically?
Which item belongs primarily in Division 01, General Requirements?
2.2 Written Formats: SectionFormat, PageFormat & Preliminary Project Descriptions
Which documents are the conditions of the contract?
What is the purpose of supplementary conditions?
At design development, the owner selects a system that changes both the budget and equipment-room layout. What record most clearly allows the team to trace the decision later?
A geotechnical report is expressly furnished for reference and is not listed as a Contract Document. How should the contractor treat it?
2.3 Graphic Formats & National CAD Standard
How many division numbers are in the MasterFormat framework, counting those reserved for future use?
While comparing early concepts, the team needs a rough construction estimate and has no detailed quantity takeoff. Which basis is appropriate?
How many digits are in a base MasterFormat section number such as 03 30 00, before any further extension?
Which information is organized in MasterFormat Division 00?
Chapter 3: Project Conception — Programming, Due Diligence & Budgets
3.1 Architectural Programming, Planning & Commissioning Planning
The contract calls for evidence of insurance before field work begins. What should the contractor submit to demonstrate that the required policies are in place?
Which item is a separate MasterFormat group containing Division 00, rather than a subgroup of the Specifications Group?
The coordinated BIM shows that a mechanical duct and a structural beam occupy the same space. What has the review found?