Exam Review

Key Facts: CSI CDT Exam

120

Multiple-Choice Questions

CSI Exam Registration

2 hours

Testing Time Limit

CSI CDT Exam Overview

22%

Largest Domain (Construction Documents)

CSI CDT Exam Blueprint

$425

Fall 2026 Early Bird Member Fee

CSI Fall 2026 Exam Registration

3 years

Recertification Cycle (24 LUs)

CSI Recertification Policy

Jan. 2027

Fall 2026 Results Month

CSI Fall 2026 Exam Registration

The CSI CDT exam has 120 multiple-choice questions and a 2-hour test limit. CSI gives the exam in spring and fall windows. Use CSI’s registration page for the applicable fees and choose remote testing or an eligible U.S. or territorial test center.

Sample CSI CDT Practice Questions

Try these sample questions to review concepts for the CSI CDT exam. Each question includes a detailed explanation. Start the interactive quiz above for the full 100+ question experience with AI tutoring.

1Under traditional design-bid-build with one prime builder, how does the owner procure design and construction?
A.Two separate contracts, one for design and one for construction
B.One contract covering both design and construction
C.A design agreement that makes the builder a design-team subcontractor
D.An advisory agreement that also covers all trade construction
Explanation: The owner contracts separately for design and construction. In the traditional sequence, the design is completed before the owner procures the builder.
2Which project delivery method combines design and construction services under a single contract with the owner?
A.Design-build
B.Design-bid-build
C.CM agency
D.Multiple prime contracting
Explanation: Design-build places design and construction under one contract held by a single design-build entity, giving the owner a single point of responsibility. This typically allows fast-tracking and reduces the owner's exposure to coordination disputes between designer and builder.
3What role does the construction manager take on during the construction phase of CM at risk?
A.Constructor holding the trade subcontracts
B.Independent adviser to the owner throughout construction
C.Contract administrator with the architect’s design authority
D.Owner’s agent awarding the owner’s multiple prime contracts
Explanation: The CM at risk typically provides preconstruction services and then contracts to perform the construction, ordinarily holding the trade subcontracts.
4What is a hallmark of a multiparty Integrated Project Delivery agreement?
A.Shared risk and reward for core participants
B.Separate incentives based only on each firm’s individual results
C.Designer selection after the construction scope is complete
D.A procurement model limited to government projects
Explanation: A multiparty IPD agreement supports early collaboration among the owner, designer, and constructor and aligns their interests through shared risk and reward.
5A library owner is defining the rooms, capacities, and adjacencies needed before the architect develops layout options. Which activity is underway?
A.Architectural programming
B.Schematic design
C.Design development
D.Construction documentation
Explanation: Programming converts user and owner needs into requirements the design team can use to develop and compare layouts.
6Which role does a construction manager as adviser typically serve?
A.Independent adviser to the owner
B.General contractor holding construction subcontracts
C.Architect of record providing professional design services
D.Trade subcontractor responsible for one construction package
Explanation: A CM as adviser provides management and coordination services to the owner. Under the AIA CMa arrangement the owner holds contracts with the multiple construction contractors.
7What makes a project fast-tracked?
A.Construction starts while design continues
B.Construction starts after a complete design is bid
C.Design is split into packages but all work starts together
D.Fabrication starts after all construction drawings are issued
Explanation: Fast-tracking overlaps design and construction. Starting early packages before later design is complete can shorten the schedule and increases the need to coordinate design interfaces.
8Before acquiring a proposed building site, which work best addresses the risk that it cannot support the intended project?
A.Verify finishes and color samples
B.Compare final trade bids
C.Check zoning, easements, and utility capacity
D.Review the contractor’s payment schedule
Explanation: Site due diligence checks restrictions and available infrastructure before the owner commits to a site.
9Which arrangement normally makes the CM the constructor and uses a guaranteed maximum price?
A.CM at risk with a cost-plus GMP
B.Design-bid-build with a stipulated sum
C.CM as adviser with owner-held trade contracts
D.Sole-source selection of a design consultant
Explanation: In a cost-plus GMP form such as AIA A133–2019, the GMP caps what the owner pays for the agreed scope, subject to contractual adjustments such as change orders. The contract determines how any savings are treated.
10Who holds separate construction agreements with the trades in a multiple-prime arrangement?
A.The owner
B.The general contractor under a single prime construction agreement
C.The architect administering the construction contracts
D.The construction manager retained solely as adviser
Explanation: The owner contracts directly with multiple prime contractors. The contract documents allocate coordination duties, which may involve an adviser or the architect.

About the CSI CDT Exam

The CSI Construction Documents Technologist (CDT) exam tests comprehensive knowledge of construction project delivery, construction documents, CSI formats, specifications, procurement, and contract administration across the facility life cycle.

Exam sponsor: Construction Specifications Institute (CSI). The requirements and fees below concern the certification or admission exam, separate from our free practice resources.

Questions

120 questions

Time Limit

2 hours

Passing Score

CSI does not publish a fixed raw passing percentage

Exam / Certification Fees

Fall 2026: $425–$625 member; $685–$935 nonmember; $185 eligible full-time student; +$50 for in-person testing

Exam sponsor website

Reported exam pass rate: not-published. CSI does not publish a fixed raw passing percentage or candidate pass rate. Review CSI’s registration page for the results schedule. Exam sponsor website

Fees, eligibility, and exam policies can change. Confirm them with the exam sponsor before applying or paying.

Our practice resources: topics covered

We aim to reflect publicly available exam outlines and topic information in our study resources. Coverage, format, and difficulty may differ from the actual exam, and we cannot guarantee that every detail is accurate or current. Confirm exam requirements, fees, and policies with the official exam sponsor.

13%

Fundamentals

Project team roles and responsibilities, facility life cycle stages, written and graphic formats, legal implications, and sustainable design

11%

Project Conception and Delivery

Programming, due diligence, budgets, insurance, scheduling, site selection, commissioning planning, delivery methods, team selection, and design and construction services

12%

Design Process

Schematic design and design development documentation, design constraints, cost estimating, life-cycle cost and value analysis, change control, decision records, QA/QC, product selection, and BIM

22%

Construction Documents

Drawings, specifying methods, MasterFormat, SectionFormat, PageFormat, specification language, Project Manual Divisions 00-49, warranties, and coordination

10%

Procurement

Competitive bidding, addenda, subcontracting, direct negotiation, controlling variables, procurement options, basis of payment, pricing, purchasing, and access to procurement documents

9%

Preconstruction

Notice to proceed, award and execution, applicable contract documents, preconstruction submittals, permits and regulatory approvals, preconstruction meetings, site verification, and mobilization

15%

Construction

Executing the work, progress meetings, submittals, site observations and inspections, QA/QC, modifications, payment, claims and disputes, closeout and the facility manager’s turnover role, and commissioning

8%

Life Cycle Activities

Facilities operation and maintenance, resource materials, facility evaluations, and end-of-life decommissioning

Preparing for the CSI CDT Exam

What You Need to Know

  • Passing score: CSI does not publish a fixed raw passing percentage
  • Exam length: 120 questions
  • Time limit: 2 hours
  • Exam / certification fees: Fall 2026: $425–$625 member; $685–$935 nonmember; $185 eligible full-time student; +$50 for in-person testing Official sources

Using Our Practice Resources

  • Work through all 100 available questions
  • Review every answer and explanation
  • Track weak areas and revisit them
  • Use our AI tutor for tough concepts

CSI CDT: Suggested Study Strategy

1Start with Construction Documents (22%) and Construction (15%), which together account for 37% of the published outline.
2Compare MasterFormat work results with UniFormat functional elements, then distinguish SectionFormat organization from PageFormat presentation.
3Separate Division 00 procurement and contracting material from Division 01 general requirements. For an AIA A201 question, check which documents the agreement incorporates.
4For AIA A201–2017, distinguish a written amendment, Change Order, Construction Change Directive, and architect’s written order for a minor change.
5Check the specified start of special warranties and separately track AIA A201–2017’s one-year correction period.

Frequently Asked Questions

What is the CSI CDT exam format?

The Construction Specifications Institute gives candidates 2 hours to answer 120 multiple-choice questions on a computer. CSI policy allows unscored pretest questions to appear among scorable questions. The current registration page does not specify a breakdown.

How much did the CSI CDT exam cost for Fall 2026?

Member registration was $425 Early Bird, $525 Standard, or $625 Final. Nonmember registration was $685, $795, or $935, respectively. Eligible full-time students paid $185. In-person testing added $50. Check CSI’s registration page for the fees for your window.

How do you maintain CSI CDT certification?

For the three-year renewal cycle, earn and report 24 CSI Learning Units, submit the recertification application, and pay the fee. Under current CSI guidance, all units relate to the architecture, engineering, construction, or operations industry and at least half relate to the CDT credential.

Which CSI domain carries the highest weight on the CDT exam?

Construction Documents is the largest domain at 22%, followed by Construction at 15% and Fundamentals at 13%.