NICET ITWBS Level II Cheat Sheet

Safety

5-15%of exam

PPEHazardous energyLadders and toolsImpairment hazards

Communication with AHJs and Customers

5-15%of exam

Test coordinationNotificationsReportsRestoration confirmation

Intermediate ITM Tasks

30-40%of exam

Dry and wet systemsStandpipesDeficiency classificationDevice-specific testing

ITM for Water Supplies

25-35%of exam

Fire pumpsPrivate mainsHydrantsWater tanks

Internal Obstruction Investigation

10-20%of exam

TriggersInternal assessmentInvestigation locationsEvidence and remediation

Quick Facts

Questions
168 questions
Time limit
185 minutes
Passing score
500 scaled; not percentage
Score scale
0–700
Testing provider
Pearson VUE test centers
Core standard
NFPA 25 (2023)
Renewal cycle
Three-year CPD cycle
Permitted references
20 / 25 / 72 / 291

Safety and Working Practices

PPE selection
Match hazards, task, and employer assessmentAssess
Hazardous energy
Isolate; lock/tag; release; verify controlsLOTO
Electrical exposure
Qualified personnel and applicable electrical procedureQualified
Confined-space entry
Evaluate permit status before entryClassify
Atmosphere test sequence
Oxygen, flammables, then toxic contaminantsSequence
Hazardous oxygen concentration
Below 19.5% or above 23.5%Oxygen
Leaning ladder foot position
Quarter of ladder working length1:4
Landing ladder extension
Three feet; secured-grasp alternative appliesAccess

Extended Impairment Options

Evacuate, Watch, Water, Control

Evacuate affected areaApproved fire watchTemporary water supplyEliminate ignition sourcesLimit fuel load

Communication and Impairment Control

Impairment coordinator
Owner designee; otherwise ownerOwner
Planned impairment
Authorize scope and coordinate before shutdownBefore
Emergency impairment
Notify and protect without delayNow
More than 10 hours/24 hours
Arrange an approved mitigation optionThreshold
Four extended-impairment options
Evacuation, watch, water, ignition/fuel controlsOptions
Restoration verification
Valves, pressures, controllers, alarms, required testsVerify
Tag colors
Jurisdiction/program specific; no universal paletteLocal
Baseline system records
Retain for system lifeLifetime
Recurring ITM records
One year after next same-type eventRetention

Separate Sprinkler Sampling Groups

50 / 25 / 20 / 20

Many standard: 50Other fast: 25ESFR/CMSA fast: 20Dry: 20Sample: greater of four/1%

Critical Deficiency vs Impairment

Critical deficiency

  • Material effect on system performance
  • Correct promptly; document actual condition

Impairment

  • System/function out of order
  • Coordinator manages notifications and mitigation

Evaluate actual effect on protection

Classify Findings by Actual Consequence

  1. Required protection cannot operate→Initiate impairment procedure(Notify owner and required parties promptly)
  2. Function materially affected, still operating→Evaluate critical deficiency(Use actual condition and applicable guidance)
  3. No material effect on performance→Evaluate noncritical deficiency(Document and arrange correction)
  4. Sprinkler damaged or field painted→Apply sprinkler replacement requirements(Assess affected protection; avoid automatic classification)
  5. Pump cannot meet system demand→Treat as impairment(Coordinate approved mitigation with responsible parties)
  6. Curve degraded, demand still met→Apply pump deficiency classification(Document, investigate, and report results)

Control Valves and Gauges

Sealed control valves
Inspect weeklyWeekly
Locked control valves
Inspect monthlyMonthly
Electrically supervised control valves
Inspect quarterlyQuarterly
Valve operation
Exercise annually; verify positionAnnual
Gauge condition
Check damage and operation monthlyMonthly
Water-pressure reading
Verify normal pressure quarterlyQuarterly
Air/nitrogen-pressure reading
Monthly; quarterly with qualifying supervisionConditional
System gauge accuracy
Five years; 3% full-scale tolerance5 years
FDC inspection
Quarterly; accessibility, condition, obstructionQuarterly

Two Air-Leakage Test Methods

40–2–3 or Normal–4–No Alarm

40 psi test pressureTwo-hour testMaximum three psi lossOr normal pressure four hoursNo low-air alarm

Partial Trip vs Full-Flow Trip

Partial-flow trip

  • Annual dry-valve trip option
  • Does not establish full-flow delivery

Full-flow trip

  • At least every three years
  • Evaluate water delivery and operation

Valve operation differs from delivery

Select Dry-System Test Objective

  1. Annual dry-valve trip due→Verify valve operation(Partial-flow allowed between required full-flow tests)
  2. Three-year full-flow test due→Evaluate full-flow water delivery(Use manufacturer instructions; approved impairment plan)
  3. Quick-opening device test due→Perform quarterly operational test(Separate from annual valve trip)
  4. Three-year air-leakage test due→Select one permitted method(Do not combine their acceptance criteria)
  5. Preaction system identified→Determine actual interlock logic(Single, double, and noninterlock differ)
  6. Test complete→Verify system restoration(Confirm pressures, valves, alarms, receiving status)

Sprinkler Laboratory Sampling

Many standard-response sprinklers
Initial 50 years; then 1050 / 10
Fast-response ESFR or CMSA
Initial 20 years; then 1020 / 10
Other fast-response sprinklers
Initial 25 years; then 1025 / 10
Dry sprinklers, either response
Initial 20 years; then 1020 / 10
Sprinklers installed 75 years
Test/retest every five years5 years
Harsh-service sprinklers
Initial five years; assess conditions5 years
Representative sample
Greater of four or one percentMinimum
Removed laboratory samples
Immediately replace with new sprinklersReplace

Sprinkler Sampling Age Is Type-Specific

Other fast-response

  • Initial twenty-five-year laboratory test
  • Normal retest every ten years

Fast-response ESFR/CMSA

  • Initial twenty-year laboratory test
  • Normal retest every ten years

Dry and harsh-service rules differ

Dry and Preaction Systems

Dry-valve exterior
Inspect monthlyMonthly
Dry-valve interior
Inspect annuallyAnnual
Quick-opening device operational test
Test quarterlyQuarterly
Dry-valve trip
Annual; partial permitted between full-flowAnnual
Dry full-flow trip
At least every three years3 years
Air-leakage pressure method
40 psi; 2h; ≤3 psi loss3 years
Air-leakage normal-pressure alternative
Four hours; low-air alarm remains inactive3 years
Compressor/nitrogen generator maintenance
Follow manufacturer; oil annually unless soonerManufacturer

Preaction vs Deluge System

Preaction

  • Closed automatic sprinklers
  • Interlock type determines valve release

Deluge

  • Open sprinklers or nozzles
  • Valve release permits designed discharge

Identify the actual release logic

Alarms and Waterflow Tests

Mechanical waterflow alarm
Test quarterlyQuarterly
Vane/pressure waterflow switch
Test semiannuallySemiannual
Valve supervisory switch
Test semiannuallySemiannual
Dry-pipe low-air alarm
Test annuallyAnnual
Main drain usual interval
Annual; quarterly for specified sole suppliesConditional
Main drain residual reduction
10%: identify cause; correct if necessaryInvestigate
Antifreeze solution
Annual; before freezing weatherAnnual
Legacy antifreeze retained under 2023
≤30% PG; ≤38% glycerine; no refillConditional
Automatic air vent exterior
Annual floor-level inspection; damage and leakageAnnual
Air vent strainers/filters/screens
Five-year inspection; flush clear or replace5 years

Usual Annual Pump Flow Points

Zero, One, One-and-a-Half

Churn: zero flowRated: 100% flowPeak: 150% flowCheck supply limitationsCompare permitted baseline

Electric vs Diesel No-Flow Test

Most electric pumps

  • Monthly no-flow test
  • At least ten minutes

Diesel pumps

  • Normally weekly no-flow test
  • At least thirty minutes

Check electric weekly exceptions and allowances

Fire Pump Test Parameters

Diesel no-flow test
Weekly; at least 30 minutesWeekly
Most electric no-flow tests
Monthly; at least 10 minutesMonthly
Electric weekly exceptions
Check controller, turbine, suction, building conditionsConditional
Redundancy/risk-analysis allowances
Verify actual applicable allowanceConditional
Usual annual flow points
Churn, rated flow, 150% flowAnnual
Annual curve comparison
≥95% baseline net pressure each point95%
Other annual acceptance requirements
System demand, rated flow, suction requirementsAlso
Net pressure simplified
Discharge minus suction; corrections when applicablePressure
NFPA 20 design envelope
Not annual NFPA 25 acceptance substituteScope

Mains, Hydrants, Tanks, Standpipes

Private fire-main flow test
Every five years; compare supply performance5 years
Hydrant operation and flushing
Annual; ≥1 minute until debris clearsAnnual
Dry-barrel hydrant drainage
Check drainage within 60 minutesDrainage
Tank exterior and supports
Inspect quarterlyQuarterly
Unprotected steel tank interior
Inspect every three years3 years
Other tank interiors
Usual interval: five years5 years
Tank water-level inspection
Quarterly supervised; otherwise monthlyConditional
Class I/III standpipe flow test
Five years; installed design demand5 years
Standpipe test acceptance
Required pressure at remote outlet(s)Design

Internal Assessment vs Obstruction Investigation

Routine assessment

  • Usual five-year condition review
  • Approved alternative methods may apply

Triggered investigation

  • Specific Chapter 14 condition exists
  • Five minimum examination locations in 2023

A condition finding can escalate scope

Assess Obstruction Evidence

  1. Five-year assessment due→Assess internal piping condition(Approved risk analysis can change frequency)
  2. Main drain pressure falls 10%→Investigate reduction cause(Valve/supply changes also explain reductions)
  3. Chapter 14 trigger established→Conduct obstruction investigation(Use five 2023 minimum examination locations)
  4. Slime or tubercules found→Test for MIC indications(Appearance alone cannot establish corrosion mechanism)
  5. Obstructing material confirmed→Plan qualified complete flushing(Manage impairment and verify corrective results)
  6. Findings and limitations known→Document system-specific evidence(Report locations, methods, results, and recommendations)

Obstruction Assessment and Investigation

Routine internal condition assessment
Normally five years; approved risk alternative5 years
Potentially obstructing foreign material
Escalate to obstruction investigationTrigger
Corrosion-related internal leakage
Check Chapter 14 investigation triggerTrigger
Dry-system delivery deterioration
Apply occupancy-specific threshold and baselineTrigger
2023 investigation locations
Five specified locations; not old fourFive
Investigation location 1
System/water control valve where provided2023 minimum
Investigation location 2
Remote end of remotest cross-main2023 minimum
Investigation location 3
Near-remote branch at cross-main connectionNear most-remote branch line
Investigation location 4
End of that near-remote branchSame branch as location3
Investigation location 5
Branch attached to remotest low-point drainDirectly connected piping
Slime or tubercules
Test for MIC indicationsEvaluate
Obstructing material confirmed
Qualified complete flushing programRemedy

Common Traps

Main Drain Is a Comparison

10% residual reduction requires investigation ≠ It does not prove full-demand capacity

Air-Leakage Alternatives Differ

40 psi / 2 h / ≤3 psi ≠ Normal pressure; 4h; no low-air alarm

Electric Monthly Has Exceptions

Weekly cases exist despite electric driver ≠ Check suction, turbine, controller, building conditions

Fast-Response Age Changed in 2023

Other fast-response starts at 25 years ≠ ESFR/CMSA fast-response: initial 20 years

Investigation Locations Changed

2023 has five specified examination locations ≠ Older four-point lists are edition-specific

Impairment Timing and Choices

Notifications do not wait ten hours ≠ Fire watch is one approved option

Last Minute

  1. 1.Level II: 168 questions, 185 minutes.
  2. 2.Passing: 500 scaled; scale 0–700.
  3. 3.Books: NFPA20–2022; NFPA25–2023; NFPA72–2022; NFPA291–2022.
  4. 4.Main drain: investigate 10% residual reduction.
  5. 5.QOD quarterly; dry trip annually.
  6. 6.Dry full-flow trip: three years.
  7. 7.Air leak: 40psi, 2h, ≤3psi loss.
  8. 8.Alternative: normal pressure, 4h, no low-air-alarm.
  9. 9.Other fast-response: 25-year initial sample.
  10. 10.Dry sprinklers: 20-year initial sample.
  11. 11.Sample: greater of four or 1%.
  12. 12.Diesel: weekly, minimum 30 minutes.
  13. 13.Most electric: monthly, minimum 10 minutes.
  14. 14.Annual pump: ≥95% baseline; additional criteria.
  15. 15.2023 investigation: five specified examination locations.
  16. 16.Impairment: notify promptly; approved mitigation.
  17. 17.Restoration: verify valves, pressures, controllers, signals.