10.4 Depreciation Run (AFAB) & Asset Year-End Closing

Key Takeaways

  • Asset postings and relevant master-data changes update planned depreciation. AFAB adopts those values and posts the applicable amounts in Financial Accounting.

  • Use a test run to review errors and use the posting run for the target company code, fiscal year and period. Rerun an eligible open period after correcting the underlying values.

  • Use central G/L balance carryforward (FAGLGVTR) to open the next Asset Accounting fiscal year. Opening the next year does not itself lock the prior year.

  • Finish depreciation posting and resolve incomplete or erroneous assets for the closing scope. Use FAA_CMP for the individual close or undo function, and FAA_CLOSE_FISC_YEARS for cross-company-code and ledger closing.

  • To make an authorized correction, reopen the last closed year for the required scope where allowed, check the G/L posting period, post the correction, and close again.

Last updated: November 2026

Post depreciation for the period

SAP updates planned depreciation in response to relevant asset master changes and transactions. If a change to the configuration requires a separate recalculation, use AFAR as appropriate. The depreciation posting run (AFAB, program FAA_DEPRECIATION_POST) adopts the planned values and posts the applicable amounts to FI at asset level. For ordinary depreciation this typically debits depreciation expense and credits accumulated depreciation. Where configured, expense is also assigned to a relevant Controlling object such as a cost center.

Select the company code, fiscal year and posting period. Use a test run to look for an issue such as a locked cost center, then run the posting and inspect the log. Both the relevant FI period and the asset fiscal year need to permit posting. New Asset Accounting runs parallel processing and may allow other assets to post when there is an individual asset error. Investigate the error and verify that depreciation is complete before the year-end close.

Correct a period already posted

Suppose period 05 was posted on May 31. On June 2 a useful-life correction changes the planned figures for May. Assume period 05 is the latest posted period, is still open and the approved posting settings now require USD 14,400 cumulative depreciation through May instead of the USD 12,000 already booked. Rerun the depreciation posting for that company code, year and period. With no other movements, the adjustment due is USD 2,400. Check the revised planned values, the log and the amount posted. Current S/4HANA supports rerunning depreciation for an eligible prior period. Which period produces the correction depends on its availability and posting rules. Avoid using the old ECC selection of a run reason as a prerequisite.

If the company determines that an asset needs manually planned unplanned depreciation in the relevant valuation, enter the corresponding asset value adjustment, for example with ABAA in the stated Private Edition process. The depreciation posting program then updates FI for that planned adjustment. This is a different business event from rerunning ordinary depreciation after a master-data correction.

Change the fiscal year and close Asset Accounting

TaskTool in the Private Edition scenarioEffect
Open the next asset fiscal yearCentral FI G/L Balance Carryforward, FAGLGVTR, or the Balance Carryforward jobCarries forward values and enables posting in the new asset fiscal year for the applicable ledgers
Close or undo closing for an individual company code and relevant ledger/areaMake Company Code Settings – Asset Accounting-Specific (FAA_CMP)Updates the last closed fiscal year for the selected scope
Execute closing across company codes and ledgersFAA_CLOSE_FISC_YEARS or the corresponding Asset Accounting jobExecutes year-end close for the selected company codes and ledgers

The fiscal-year change formerly performed separately with AJRW is part of central G/L balance carryforward. At the end of 2025, run carryforward for all applicable representative ledgers to open 2026 for asset postings. You can continue to post permitted 2025 transactions while it is open. Two asset fiscal years can be open at once. Before you open 2027 in this example, close 2025.

Complete the closing checks

Review the depreciation list and Asset History Sheet. For the closing scope, check that all depreciation requiring posting has been posted and that relevant asset master records are complete and free of errors. If you correct master data or amounts, check the planned values and run the appropriate posting again. Reconcile the resulting asset and G/L balances as a close control. Fix financial entries while the appropriate posting periods are still open. Finish the subledger close in coordination with the G/L close.

Reconcile the Asset History Sheet to the G/L

Use posted values for a reconciliation to G/L accounts. Select the same company code, ledger, posting depreciation area, fiscal period and currency. Suppose a machine has opening APC of USD 100,000 and opening accumulated depreciation of USD 30,000. This year it has a USD 20,000 acquisition and USD 12,000 in posted depreciation, with no other movements. Use the movement categories to explain closing APC of USD 120,000, accumulated depreciation of USD 42,000 and net book value of USD 78,000. If the G/L shows a different amount for the comparable scope, check the selection and inspect the asset transactions and depreciation posting log. A planned amount can be useful for forecasting and requires a separate comparison from posted G/L balances.

In SAP S/4HANA, FAA_CMP replaced the earlier AJAB and OAAQ closing and undo controls. The cross-company-code and ledger closing program (FAA_CLOSE_FISCAL_YEARS, transaction FAA_CLOSE_FISC_YEARS) is available starting with the 2020 release. Close the next fiscal year after the last closed one. The standard year-end procedure closes a year that has ended. A closed asset fiscal year prevents changes and postings for the closed scope. An authorized accountant can undo the last close where applicable, including for selected depreciation areas. A year before the migration year cannot be reopened. The relevant FI posting period must also permit the correction. Re-run any affected depreciation posting and restore closing after the approved correction is complete.

Test Your Knowledge

Period 05 was the last period posted and remains open. A corrected useful life changes the planned amount that should have been posted through period 05. What posts the ordinary depreciation adjustment?

A

A new acquisition posting to the asset

B

Rerun AFAB for the eligible company code, fiscal year and period after verifying the updated planned values

C

Carry forward the asset’s balance to a new fiscal year

D

Enter a manual unplanned depreciation amount for the asset

Test Your Knowledge

Fiscal-year closing for 2025 in 0L reports unposted depreciation for a relevant asset. What must the closing team do?

A

Set a deactivation date on every asset

B

Record an inventory count as a substitute for the posting

C

Correct the underlying issue and complete depreciation posting for the affected year and scope before closing

D

Open 2025 again by executing legacy AJRW

Test Your Knowledge

In the current SAP S/4HANA Private Edition scenario, what opens the next asset fiscal year and which tool can undo the last close for an eligible depreciation area?

A

AJRW opens the new year and AFAB undoes the close

B

AFAB opens the next year and AIBU undoes the close

C

FAA_CMP carries forward G/L balances and AJAB reopens a prior year

D

Central G/L balance carryforward opens the next asset year and FAA_CMP can undo the last close for the area

Sections you finish are checked off in the contents.