14.1 Must-Know Numbers, Times & Thresholds

Key Takeaways

  • Drill high-yield numbers for open-book speed—30 mA RCD shock protection; RCD trip performance classically linked to ESR reg 24 unsafe criteria (300 ms at 1× IΔn, 40 ms at 5×); IR 500 V DC with min 1 MΩ; disconnection times 0.4 s / 5 s—then confirm in permitted texts under time pressure.
  • Exam logistics anchors: Aspeq fee NZ$149.50 + GST; results ~24 hours; three fails in three months → three-month stand-down; ESC within 20 working days after connection; keep certification records 7 years.
  • Certification map: CoC reg 65, RoI reg 72, ESC reg 74A family—pair risk category to the document chain (low ESC; general CoC+ESC; high CoC+RoI+ESC).
  • MEN link only at the main switchboard; verification follows Section 8 order (visual → continuity → IR → polarity → connections → EFLI → RCD) with live tests only after dead tests pass.
  • Flag physical standards books for these thresholds, reg numbers, and sequence headings so lookup is seconds, not minutes.
Last updated: August 2026

14.1 Must-Know Numbers, Times & Thresholds

Quick Answer: For open-book speed, pre-load a short list of NZ-practice anchors—30 mA shock-protection RCD class; 300 ms @ 1× IΔn / 40 ms @ 5× trip performance classically linked to ESR reg 24 unsafe criteria; IR 500 V DC, min 1 MΩ; 0.4 s / 5 s disconnection applications; Aspeq NZ$149.50 + GST; results ~24 hours; 3 fails in 3 months → 3-month stand-down; CoC copy within 20 days of completing the work and ESC within 20 working days of connection; records 7 years; CoC reg 65 / RoI reg 72 / ESC reg 74A; AS/NZS 3000:2018 cited since 13 Nov 2025; MEN only at main switchboard; Section 8 verification order; risk category → document chain. Then confirm every figure in permitted texts—do not certify from memory alone.

Why a Number Bank Still Matters on an Open-Book Exam

Open-reference does not reward candidates who “will look everything up from cold.” Every minute spent hunting for a residual-current rating or a certification regulation is a minute stolen from scenario stems, calculation extracts, and trap options. The strategy is dual: know the high-yield set cold, and know where it lives so verification is a 20-second flag flip, not a full index search.

Treat the tables below as a speed layer. They are curated for this study guide’s NZ EWRB electrician regulations pathway and align with earlier chapters. Editions and exact clause wording can differ—always confirm in the ESR 2010 and AS/NZS 3000 (and any other materials Aspeq permits for your sitting).

High-Yield Technical Numbers

TopicAnchor numberExam use
RCD shock protection (residual rating class)30 mAPersonal / additional protection on many final subcircuits; pair with Type/application stems
RCD trip at 1 × IΔn≤ 300 msClassic performance figure taught with ESR reg 24 electrically-unsafe RCD criteria
RCD trip at 5 × IΔn≤ 40 msFaster trip at higher residual current (e.g. 150 mA for a 30 mA device)
Insulation resistance test voltage (LV teaching)500 V DCSection 8 IR method baseline for typical LV installation work
Minimum IR (classic LV teaching)1 MΩFail IR → do not liven / do not certify until remediated and retested
Disconnection time (many final / socket-style applications)0.4 sADS / EFLI stems for final subcircuits
Disconnection time (distribution / submain-style applications)5 sLonger-time contexts in Wiring Rules tables

Scenario A — mixed units trap. A stem asks whether a 30 mA RCD that trips in 320 ms at IΔn is acceptable under unsafe-criteria teaching. Candidates who confuse 30 mA (sensitivity) with 300 ms (time) or answer from “it felt fine” lose the mark. Route: residual rating check → trip-time table → reg 24 / product performance path in your books.

Scenario B — IR before energisation. An addition returns 0.4 MΩ at 500 V DC between actives/neutral and earth. Correct path: fail the IR criterion (classic 1 MΩ minimum), remediate, retest—not “close enough for CoC” and not skip to live EFLI/RCD.

Exam Logistics Numbers (Aspeq / EWRB Pathway)

Logistics itemTeaching figure
Aspeq examination feeNZ$149.50 + GST per sitting (confirm at booking)
Results releaseAbout 24 hours typical
Retake control3 fails within 3 months → 3-month stand-down for further study
Official question count / time / pass markNot fixed in public—set by Aspeq for the sitting; confirm when you book

These are process numbers, not Wiring Rules numbers. Stems about “what happens after three fails” test retake policy, not RCD physics. Keep them in a separate mental drawer from 30 mA / 0.4 s.

Certification Timeframes, Retention & Regulation Anchors

ItemAnchor
Certificate of ComplianceReg 65 — required for all general and high-risk PEW
Record of InspectionReg 72 — Electrical Inspector; high-risk
Electrical Safety CertificateReg 74A — safe to use, after connection
CoC copy to clientReg 74E(2)20 days (calendar) after completing the work
RoI copy to clientReg 72A(1)(a)20 working days after it is issued
ESC issuedReg 74C — as soon as practicable, ≤ 20 working days after connection
ESC copy to clientReg 74G(1)(a)20 working days after it is issued
Retention of all threeAt least 7 years — regs 72A(1)(b), 74E(3), 74G(1)(b)
Copy on authorised request10 working days — regs 72A(2), 74E(4), 74G(2)
High-risk database lodgementReg 74F(1) — by the inspector, 20 working days after the date of the RoI
Good-faith reliance on earlier CoCsReg 65(5) — certificates issued in the previous 6 months
Record of assessment (reg 75) / warrant copy (reg 78)3 years, or send to WorkSafe — not 7
Warrant of electrical fitness life4 years from issue (1 year mobile medical facility) — reg 78(4)

Memory string: 65 complies · 72 inspects · 74A connects safely · CoC 20 days · everything else 20 working days · requests 10 working days · keep 7 years.

Standards edition anchors

ItemAnchor
AS/NZS 3000 cited edition2018, including Amendments 1, 2 and 3 (since 13 Nov 2025)
Transition period13 Nov 2025 – 12 Nov 2026
Other refreshed citationsAS/NZS 3017:2022, 3019:2022, 3012:2019, 3003:2018, 5033:2021, 4777.1:2024
NZECP 34 default approach4 m (mobile plant, cl 5.2.1; non-competent persons ≤110 kV, cl 9.2.1)
NZECP 54 default clearance500 mm where no manufacturer's instructions exist

Risk category → document chain (teach cold)

PEW risk categoryCore document chain (when connection applies)
Low-riskESC pathway
General-riskCoC (65) + ESC (74A)
High-riskCoC (65) + RoI (72) + ESC (74A) — pipeline teaching: work → test → CoC → RoI → connect → ESC

Scenario C — high-risk incomplete chain. Excellent installation, neat CoC, immediate energisation, no Inspector RoI. The compliance chain is incomplete. The number bank does not help if you cannot map high-risk → reg 72.

MEN Link Location (One-Line Rule)

MEN link only at the main switchboard / main earthing point of the consumer installation—bonding neutral bar to earth bar there. Downstream, neutral and protective earth stay separated. Extra N–E links on sub-boards or final circuits are a classic fail pattern.

Verification Sequence Order (Section 8 Teaching)

StepActivityLive/dead
1Visual inspectionDead
2Earth continuity & protective bondingDead
3Insulation resistanceDead
4PolarityDead (as method allows)
5Correct circuit connectionsDead
6Earth fault loop impedanceLive
7RCD operationLive

Pre-livening: MEN restored, dead tests satisfactory (including IR ≥ 1 MΩ at 500 V DC classic teaching), area controlled. Test-button-only is not full RCD verification for Section 8 competence—instrument trip-time tests at 1× / 5× complete the story.

Flagging List for Physical Standards Books

Before exam day, mark allowed flags/tabs (annotations only as Aspeq permits—no loose sheets that break rules):

  1. ESR — electrically safe/unsafe & reg 24 RCD unsafe criteria
  2. ESR — PEW definitions & risk categories
  3. ESRreg 65 CoC, reg 72 RoI, reg 74A ESC family; timeframes/retention
  4. AS/NZS 3000 — MEN / earthing arrangements
  5. AS/NZS 3000 — RCD additional protection & residual-current applications
  6. AS/NZS 3000 — disconnection times / ADS tables (0.4 s / 5 s contexts)
  7. AS/NZS 3000 Section 8 — visual + test sequence & IR criteria
  8. Companion standards index (3008 cable, 3012 construction, 3760 appliances, special installs)
  9. NZECP 34 (A-level safe distances) and other ECPs you are permitted
  10. Voltage-drop / maximum-demand worked examples or tables you may need under extract stems

Drill method: close the book, write the number bank from memory, open to each flag and confirm wording, re-close, re-write. On exam day, high-confidence items answer first then spot-check; low-confidence items open the flag before selecting.

Bottom Line for Section 14.1

Speed without honesty fails registration ethics; honesty without speed fails the clock. Internalise 30 mA · 300/40 ms · 500 V / 1 MΩ · 0.4/5 s · $149.50+GST · 24 h · 3-fail stand-down · 20 working days · 7 years · 65/72/74A · MEN at MSB only · Section 8 order · risk→docs, flag the homes of those facts, and still read the permitted text when the stem turns on a nuance.

Memory Aids (Quick Cards)

  • RCD: 30 mA protects people; 300 ms at one times; 40 ms at five.
  • IR: Five hundred volts, one megohm minimum—dead before live.
  • ADS times: Point-four finals; five for feeders (context tables).
  • Papers: Sixty-five complies, seventy-two inspects, seventy-four connects safe.
  • MEN: One link at the main board—never a necklace of links.
  • Sequence: See it, bond it, IR it, polarise it, connect-check it, then loop and RCD live.
Test Your Knowledge

Which set correctly pairs classic NZ teaching anchors for insulation resistance testing on typical LV installation PEW?

A
B
C
D
Test Your Knowledge

RCD trip performance classically linked to ESR reg 24 unsafe criteria teaching is often stated as which pair of limits?

A
B
C
D
Test Your Knowledge

For high-risk PEW that will be connected, which document chain best matches the teaching model in this guide?

A
B
C
D