6.3 Power Removal, Evacuation & Incident Recovery

Key Takeaways

  • A request and a confirmation are separate steps. The scenario requires all specified protections and route clearance before a track-level evacuation.

  • When the question lists emergency milestones, pair each action with its stated prerequisite.

  • “Immediately after” links consecutive steps among the actions being ordered. “After” alone allows intervening steps.

  • In an emergency, MTA’s public rider guidance is to stay with the train and follow transit staff and emergency personnel.

Last updated: November 2026

Information Ordering asks you to apply given rules to actions or items. An incident scenario can place several prerequisites before a final action. Begin by locating the final action and reading what must already be true. The exercises here concern the order of fictional training milestones. Exam No. 7603 notice, The Test

Request, Confirm, and Clear the Route

A procedural word such as confirm describes a different milestone from request. A request means someone asked for a change. Confirmation means they received reliable notice of its status from the source required by the passage. Clearance identifies a permitted next action or route. In a question about a track-level evacuation, the passage may require multiple confirmations and a separate clearance.

Step named in the exerciseWhat it establishes
Report the location and conditionControl has the information stated in the report
Request traction power removalSomeone has asked for a shutdown
Receive control’s power-off confirmationThe given power condition is confirmed
Receive control’s adjacent-track protection confirmationThe given movement protection is confirmed
Receive route clearanceThe specified route is available under the model’s other conditions

If a radio message reports that a request was entered, one process has started, but the later milestones remain unsatisfied. If two confirmations are required and the question names no order between them, you cannot infer which confirmation came first. You can infer that both precede the final action. MTA’s public guidance says riders should follow staff and emergency personnel and avoid leaving a train on their own because power or train movements may still be present. MTA emergency preparedness

Worked Example: Organize a Training Report

A stopped train in a simulator can no longer move under its own power. The exercise gives this rule:

With the train already stopped, first record the train number, the track, and the nearest marker. Then notify the control center with those details. Request an assistance plan after notifying control. Write down the confirmed plan immediately after it is received. Announce the confirmed next step only after writing it down.

The ordered milestones are record location → notify control → request plan → receive plan → record plan → announce. The recording requirement is a precise adjacency after receiving the plan. It does not mean that the plan is received as soon as requested. There may be a wait before control responds.

Rejected sequence: “Record location → Notify control → Request plan → Announce → Receive plan → Record plan.” Announcing after requesting is too early. The wording requires announcement after recording the confirmed plan. If a distractor inserts an unrelated action after receiving the plan and before recording it, it breaks the different constraint of adjacency.

Worked Example: Conditions Before a Track-Level Route

A model incident checklist gives one possible controlled response during a stopped train exercise. It says that an announcement to use a designated route occurs only when the ordered steps below are complete:

  1. Report the train location and request protection from the control center.
  2. Receive confirmation that relevant traction power is off and that adjacent train movements are protected.
  3. Obtain clearance for the specified evacuation route.
  4. Give passengers the route instruction from the approved plan.

Step 2 requires two confirmations. The model permits them to arrive in either order. Step 3 follows both, and Step 4 follows Step 3. A multiple-choice sequence that reports both confirmations before clearance can be valid even if it lists adjacent-movement protection before the power confirmation. A sequence putting clearance between the two confirmations breaks the rule.

Test Whether the Prompt Fixes an Exact Position

Suppose Clear Route must occur after Confirm Power, and the announcement must occur after Clear Route. If one other required step also precedes Clear Route but has no ordering relationship to Confirm Power, neither of those two prerequisites is necessarily first. Draw both arrows to Clear Route. A valid option can put either of the prerequisites first. If the instructions instead say Confirm Power immediately precedes Clear Route, they fix those two as a pair.

You can apply the same check to the earlier pre-trip example. Receiving examiner approval and completing the movement check are distinct milestones. Recognizing when listed actions require confirmation makes the sequence testable even when the scenario is unfamiliar.

Test Your Knowledge

In a model incident, report a stopped train’s location before requesting protection. Receive confirmation of power-off and adjacent-track protection before obtaining route clearance. Announce the evacuation route only after clearance. Which sequence satisfies every requirement?

A

Request protection → Report location → Receive both confirmations → Obtain route clearance → Announce the route

B

Report location → Request protection → Confirm power off → Obtain route clearance → Confirm adjacent-track protection → Announce the route

C

Report location → Request protection → Confirm adjacent-track protection → Announce the route → Confirm power off → Obtain route clearance

D

Report location → Request protection → Confirm adjacent-track protection → Confirm power off → Obtain route clearance → Announce the route

Test Your Knowledge

A stopped-train simulator says to record the assistance plan immediately after receiving it and to announce the plan after recording it. Among those steps, what must immediately precede recording the plan?

A

Receiving the plan

B

Requesting the plan

C

Announcing the plan

D

Reporting the train location

Test Your Knowledge
Ordering

Arrange the milestones in the model. Start by recording the train location. Notify control after recording the location. Confirm protection after notifying control. Receive route clearance after protection is confirmed. Give riders the confirmed route instructions last.

Arrange the items in the correct order

1

Notify control

2

Record the train location

3

Give riders the confirmed route instructions

4

Receive route clearance

5

Confirm protection

Sections you finish are checked off in the contents.