16.4 Foundation Layout & Pipe Laying
Key Takeaways
Batter boards set outside the excavation hold string lines that mark building lines and can be restored after digging.
Corners are squared with the 3-4-5 method and checked by confirming that a rectangle's two diagonals are equal.
Gravity pipe is normally laid starting at the downstream end and working upgrade, with bell ends facing upstream.
Invert elevation changes by grade times distance: a 0.40 percent grade over 300 feet rises 1.20 feet.
Pipe is heavy (Caterpillar lists 60-inch reinforced concrete pipe at about 1,295 pounds per foot), so lifts must stay within the machine's rated capacity and no one may stand under the load.
Foundation Layout & Pipe Laying
Building Layout
A surveyor sets the control points and benchmarks for a building. The contractor then transfers those points to the excavation. Because excavation destroys corner stakes, crews build batter boards: horizontal boards nailed to stakes set far enough outside the excavation that the machine will not disturb them. String lines stretched between nails or saw kerfs on the batter boards mark the building lines. After digging, the strings are re-stretched, and a plumb bob drops each corner back to the bottom of the excavation.
Squaring Corners
- 3-4-5 method: measure 3 feet along one line and 4 feet along the other. The corner is square when the distance between the two marks is exactly 5 feet. For greater accuracy on larger layouts, use multiples such as 6-8-10, 9-12-15, or 12-16-20 feet.
- Equal diagonals: a rectangle is square only when both diagonals are equal. For a 40-foot by 60-foot building:
That is about 72 feet 1-5/16 inches. If one diagonal is longer, adjust the corners until both match.
Footing and Foundation Excavation
- Dig footings to the elevation shown on the plans. The bottom must be undisturbed native soil or compacted fill that meets the specification.
- Do not over-excavate below grade. If you dig too deep, never fill the over-dig with loose spoil. The engineer will usually require lean concrete or compacted structural fill.
- Excavate wide enough beyond the footing for formwork and workers, as the plans or foreman direct.
- Clean loose material from the footing bottom with a smooth-edged cleanup bucket, not a toothed digging bucket.
- If workers will enter an excavation 5 feet or deeper, Subpart P protection is required (Chapter 18).
Laying Gravity Pipe
Storm and sanitary sewers flow by gravity, so the pipe must be laid to an exact grade.
Direction of Laying
Pipe is normally laid starting at the downstream (lowest) end and working upgrade, with bell ends facing upstream. Each new spigot is pushed into the bell of the pipe already in place. This keeps the joints in line with the flow and lets water drain away from the work.
Grade Control
- Offset and cut stakes give line and grade at intervals along the trench (Section 16.2).
- A pipe laser set inside the pipe at the downstream manhole projects a beam at the design percent grade. A target placed in the end of each new joint shows when that joint is on line and grade.
- Grade rods or machine control check the trench bottom before bedding goes in.
Invert Calculations
The invert is the inside bottom of the pipe. Each invert elevation equals the downstream invert plus the grade times the distance:
For a pipe at 0.40 percent over 300 feet starting from an invert of 100.00 feet:
The trench subgrade must be lower than the invert by the pipe wall thickness plus the bedding. With a 0.25-foot wall and 0.50 feet of bedding, the subgrade at the upper end is ft.
Bedding, Haunching, and Backfill
| Zone | Purpose |
|---|---|
| Bedding | Uniform support under the pipe; shaped or loosely placed so bells do not bear on the subgrade |
| Haunch | Material worked under the lower sides of the pipe; critical for load support |
| Initial backfill | Placed and compacted in lifts to a specified depth over the pipe |
| Final backfill | Remainder of the trench, compacted to the specification for the surface above |
Avoid driving heavy rollers over the pipe until the cover the specification requires is in place.
Handling Heavy Pipe
Pipe is heavy. The Caterpillar Performance Handbook (from American Concrete Pipe Association data) lists approximate weights for round reinforced concrete pipe:
| Inside diameter | Weight per foot |
|---|---|
| 24 inches | 265 lb |
| 36 inches | 524 lb |
| 48 inches | 867 lb |
| 60 inches | 1,295 lb |
| 72 inches | 1,811 lb |
An 8-foot joint of 60-inch pipe therefore weighs about pounds.
Safe pipe-handling rules:
- Check the excavator's or backhoe's lift chart at the actual radius and height. Lift only from the manufacturer's designated lifting point, never from bucket teeth.
- Use rated rigging and tag lines, and follow Chapter 6 for excavator object handling.
- OSHA 1926.651(e) prohibits employees from being underneath loads handled by lifting or digging equipment. Workers in the trench or trench box stand clear until the pipe is lowered into place.
- Push joints home with a bar or come-along, or with the bucket against a timber block across the pipe end, as the manufacturer allows. Never strike the bell with steel.
- When a trench box is moved forward, make sure it does not drag the installed pipe or pull joints apart.
A crew lays out a rectangular building 40 feet by 60 feet. Which measurement confirms that the corners are square?
Both diagonals equal 100 feet, the sum of the two sides
Both diagonals measure about 72.11 feet (72 ft 1-5/16 in)
One diagonal measures 50 feet, matching the 3-4-5 rule
The diagonals differ by exactly 20 feet, the difference of the sides
A storm sewer has a downstream invert of 100.00 feet and is laid upgrade at 0.40 percent for 300 feet. What is the invert elevation at the upstream end?
100.40 feet
112.00 feet
98.80 feet
101.20 feet
How is bell-and-spigot gravity pipe normally laid?
Starting downstream and working upgrade, with bells facing upstream
Starting at the upstream end and working downgrade, with bells facing downstream
Starting at the upstream end and working downgrade, with bells facing upstream
Starting in the middle of the run and working both ways, with bells facing the center
Sections you finish are checked off in the contents.