10.1 Standard Hand Signals, Voice & Radio Signals and Signal Person Qualification

Key Takeaways

  • 1A and 1B applicants must know the crane operator ASME hand signals, and OPSI says crane and excavator applicants must know the national standard signals in 230 CMR 6.00 to pass.

  • Appendix A of 230 CMR 6.00 reproduces the ASME B30.5 crane hand signals, and Appendix B reproduces the SAE excavator and backhoe hand signals.

  • Operators respond only to signals from the signal person except in emergencies, and must obey a stop or emergency stop signal no matter who gives it (230 CMR 6.08(2)(c)9; OSHA 1926.1417(y)).

  • If signal transmission between the operator and signal person is interrupted, the operator must safely stop operations until it is restored (OSHA 29 CFR 1926.1419(f)).

  • A signal person qualifies through a third-party or employer qualified evaluator, using an oral or written test plus a practical test (OSHA 29 CFR 1926.1428).

Last updated: October 2026

Why signals carry so much weight

230 CMR 6.10 makes knowledge of the crane operator ASME hand signals a prerequisite for 1A and 1B, and knowledge of excavator hand signals a prerequisite for 2A. OPSI's application warns that crane and excavator operators shall know the national standard hand signals found in 230 CMR 6.00 in order to pass. The regulation defines a signal person as a trained individual qualified to direct the operator and warn of hazards using hand signals, audible signals or flashing lights, and points to Appendices A and B.

Appendix A: crane hand signals (ASME B30.5)

SignalHow it is given
HoistForearm vertical, forefinger pointing up, move the hand in a small horizontal circle
LowerArm extended downward, forefinger pointing down, move the hand in a small horizontal circle
Use main hoistTap fist on head, then use regular signals
Use whipline (auxiliary hoist)Tap elbow with one hand, then use regular signals
Raise boomArm extended, fingers closed, thumb pointing upward
Lower boomArm extended, fingers closed, thumb pointing downward
Move slowlyOne hand gives any motion signal; the other hand is held motionless in front of the hand giving the signal (hoist slowly is the example shown)
Raise the boom and lower the loadArm extended, thumb pointing up, flex fingers in and out as long as load movement is desired
Lower the boom and raise the loadArm extended, thumb pointing down, flex fingers in and out as long as load movement is desired
SwingArm extended, point with finger in the direction of boom swing
StopArm extended, palm down, move the arm back and forth horizontally
Emergency stopBoth arms extended, palms down, move both arms back and forth horizontally
TravelArm extended forward, hand open and slightly raised, make a pushing motion in the direction of travel
Dog everythingClasp hands in front of the body
Travel (both tracks)Both fists in front of the body, making a circular motion about each other, showing forward or backward (land cranes only)
Travel (one track)Lock the track on the side shown by a raised fist; travel the opposite track in the direction shown by the other fist rotated vertically in front of the body (land cranes only)
Extend boom (telescoping)Both fists in front of the body, thumbs pointing outward
Retract boom (telescoping)Both fists in front of the body, thumbs pointing toward each other
Extend boom, one handOne fist in front of the chest, thumb tapping the chest
Retract boom, one handOne fist in front of the chest, thumb pointing outward and the heel of the fist tapping the chest

Pairs that are easy to confuse:

  • Stop uses one arm; emergency stop uses both.
  • Main hoist is a tap on the head; whipline is a tap on the elbow.
  • Raise boom is a still thumb up; raise boom and lower load is thumb up with the fingers flexing.
  • Extend has thumbs out; retract has thumbs pointing toward each other.

Appendix B: excavator and backhoe signals (SAE J1307)

230 CMR 6.09(5)(c) requires SAE hand signals for excavating machinery. Several look like the crane signals (raise and lower load vertically with circling forefingers, boom up and down with thumbs, swing by pointing, move slowly with a still hand). There are also excavator-only signals:

SignalHow it is given
Arm/dipperstick in / outBoth hands clenched, thumbs pointing inward / outward
Close bucketOne hand closed and still, the other rotating in a small vertical circle with forefinger pointing at the closed hand
Open bucketOne hand open and still, the other rotating in a small vertical circle with forefinger pointing at the open hand
Retract / extend telescopic armArm outstretched horizontally, fingers closed, thumb pointing in the direction of movement
This far to goHands raised and open inward, moved laterally to show the distance
Stop / emergency stopOne arm, or both arms, extended laterally, hand open downward, moved back and forth
Stop engineDraw thumb or forefinger across the throat

OSHA rules for signals (29 CFR 1926.1419–1422)

When a signal person is required (1926.1419(a))

  1. The point of operation (load travel or the area at load placement) is not in full view of the operator.
  2. When traveling, the view in the direction of travel is obstructed.
  3. Site-specific safety concerns lead either the operator or the person handling the load to decide one is needed.

Types and rules

  • Signals may be hand, voice, audible or "new" signals. Hand signals must use the Standard Method (OSHA Appendix A) unless that is infeasible or the operation isn't covered. Then non-standard signals may be used only if the signal person, operator and lift director (if any) contact each other before the operation and agree on them (1926.1419(c)).
  • The signals and the way they are transmitted (line of sight, video, radio) must be appropriate for site conditions. If the ability to transmit signals is interrupted, the operator must safely stop operations requiring signals until signals are re-established and understood (1926.1419(e)–(f)).
  • The operator must obey a stop or emergency stop signal no matter who gives it (1926.1417(y)). 230 CMR 6.08(2)(c)9 states the Massachusetts version: respond only to signals from a signal person, except in emergencies.
  • Radio and electronic signals (1926.1420): test the device on site before operations begin, use a dedicated channel (multiple cranes and signal persons may share one channel to coordinate), and give the operator hands-free reception.
  • Voice signals (1926.1421): operator, signal person and lift director agree on them in advance. Each voice signal contains function, direction, distance and/or speed, then stop, for example "Hoist, up, 20 feet, 10 feet, 5 feet, 2 feet, stop."
  • Audible travel warning: in Massachusetts, if the machine has a warning signal, it is sounded before traveling and intermittently while traveling, especially near people (230 CMR 6.08(2)(c)10). Horn codes for other purposes must be agreed on site.

Signal person qualification (29 CFR 1926.1428)

RequirementDetail
Who evaluatesOption 1: a third-party qualified evaluator, whose documentation is portable. Option 2: the employer's qualified evaluator, whose documentation is not portable to other employers
What the signal person must knowThe signals used (the Standard Method if hand signals are used); competence in applying them; a basic understanding of equipment operation and limitations, including crane dynamics in swinging and stopping loads and boom deflection from hoisting loads; and the requirements of 1926.1419–1422 and 1926.1428
How it is shownAn oral or written test, plus a practical test
DocumentationAvailable at the site while the signal person is employed, listing each type of signaling qualified for

Practice

  1. A rigger taps an elbow, then circles a raised forefinger. That means hoist on the whipline.
  2. A carpenter who is not the signal person waves both arms, palms down. That is an emergency stop, and the operator stops.
  3. The signal person's radio goes silent during a blind pick. The operator stops until communication is restored (1926.1419(f)).
Test Your Knowledge

Under Appendix A of 230 CMR 6.00 (ASME B30.5), how does a signal person call for the main hoist?

A

Tap elbow with one hand, then use regular signals

B

Clasp hands in front of the body

C

Tap fist on head, then use regular signals

D

Point with a finger in the direction of the load

Test Your Knowledge

A radio-directed blind lift is underway when the signal person's transmissions stop. What does OSHA 29 CFR 1926.1419(f) require?

A

Continue at reduced speed until the load is set

B

Switch to hand signals from any available worker

C

Finish the current motion, then wait

D

Safely stop operations requiring signals until transmission is re-established and a proper signal is given and understood

Test Your Knowledge

How must a signal person demonstrate qualification under OSHA 29 CFR 1926.1428?

A

By an oral or written test and a practical test, documented by a third-party or employer qualified evaluator

B

By holding a Massachusetts 1B hoisting license

C

By completing 40 hours of on-the-job signaling

D

By passing a medical examination only

Sections you finish are checked off in the contents.