7.3 Wind, Storms, Lightning, Ice & Cold: Weather Limits for Crane Work
Key Takeaways
Wind speed must not exceed the manufacturer's recommendations for continued work (230 CMR 6.09(1)(k)).
When a local storm warning is issued, a competent person must decide whether to implement the manufacturer's recommendations for securing the equipment (OSHA 29 CFR 1926.1417(h)).
A competent person must adjust the equipment or operations for the effect of wind, ice and snow on stability and rated capacity (OSHA 29 CFR 1926.1417(n)).
Wind pressure rises with the square of wind speed (P = 0.00256 × V² × Cd in psf and mph), so doubling the wind speed quadruples the force on the boom and load.
For personnel hoisting, wind above 20 mph at the platform requires a qualified person to decide whether the lift is safe (OSHA 29 CFR 1926.1431), and dangerous weather stops personnel hoisting (230 CMR 6.09(6)(h)).
The rules that apply
| Rule | Requirement |
|---|---|
| 230 CMR 6.09(1)(k) | Wind speed must not exceed the manufacturer's recommendations for continued work operations |
| 230 CMR 6.08(2)(c)11 | When there is any doubt about safety, the operator may stop and refuse to handle loads until safety is assured |
| OSHA 1926.1417(h) | When a local storm warning is issued, the competent person decides whether to implement the manufacturer's recommendations for securing the equipment |
| OSHA 1926.1417(n) | The competent person adjusts the equipment and/or operations for the effect of wind, ice and snow on stability and rated capacity |
| OSHA 1926.1431(k)(8) | Personnel hoisting: if wind (sustained or gusts) exceeds 20 mph at the platform, a qualified person decides whether it is safe. Any sign of dangerous weather requires the same determination |
| 230 CMR 6.09(6)(h) | Operators stop all personnel hoisting when there are indications of dangerous weather |
| OSHA 1926.1435 | Tower cranes need a wind speed indicator mounted above the upper rotating structure |
The manufacturer's manual is where the actual numbers come from: maximum operating wind speed for each configuration, the reference height for measuring it, out-of-service wind limits, cold-temperature limits and any capacity reductions.
Wind force: the square law
Dynamic wind pressure on a surface is commonly estimated as:
where is pressure in pounds per square foot, is wind speed in miles per hour and is the drag (shape) coefficient: about 1.2–2.0 for flat panels and forms, and lower for round shapes. The total lateral force is the pressure times the projected area:
Doubling the wind quadruples the force. With :
- At 15 mph: psf
- At 30 mph: psf
Worked example. A 10 ft × 40 ft precast wall panel (400 ft²) is flown broadside in a 25 mph gust with :
That is nearly half a ton of sideways force, applied at the hook and transferred to the boom as side load. Taglines cannot reliably hold it.
Wind speed also generally increases with height, so the wind at a long boom tip can be much stronger than a ground reading. That is why manufacturers specify where wind speed is measured, and why tower cranes carry a wind speed indicator at the top.
Sail area and the manufacturer's wind limit
A crane's published wind limit assumes a standard load, a compact object with a limited wind-exposed area per unit of weight. Many crane manuals state the assumed load wind area per ton (1.2 m² per metric ton is a common figure). Large, light loads such as wall panels, curtain-wall units, plywood bundles, empty containers and HVAC units present far more area per ton. Most manuals then require a lower permissible wind speed, often calculated as:
where is the standard area allowed for that load's weight and is the load's real projected area (including the drag factor if the manual says so). Example: the chart allows 30 mph for the configuration; the load's actual area is 4 times the standard area, so mph. Follow the formula and definitions in your own manual. They vary by manufacturer.
High-sail loads cause three problems:
- Side load on the boom tip that the boom is not built to resist (Section 5.1).
- Radius growth when the load is blown away from the crane, reducing capacity.
- Loss of tagline control and danger to the people holding the taglines.
Recognizing wind speed
The manufacturer's limits govern. This Beaufort-based guide only helps with judging wind:
| Beaufort force | Wind (mph) | What you see | Typical response |
|---|---|---|---|
| 0–3 | 0–12 | Smoke rises nearly vertically to light flags extended | Normal operations within chart limits |
| 4 | 13–18 | Dust and loose paper raised; small branches move | Watch large-area loads; check assembly/disassembly wind limits |
| 5 | 19–24 | Small trees in leaf sway | Expect high-sail loads to be beyond many manual limits; check the anemometer |
| 6 | 25–31 | Large branches move; wires whistle | Near or above many operating limits; land loads and secure if the limit is reached |
| 7 | 32–38 | Whole trees move; walking is difficult | Beyond most operating limits; secure per manual (lower boom or weathervane) |
| 8+ | 39+ | Twigs break off | Storm conditions; follow out-of-service procedures |
Storms and securing the crane
- Storm warning (OSHA 1926.1417(h)): a competent person decides whether to carry out the manufacturer's securing procedure. Typical steps for mobile cranes include landing the load, retracting and lowering the boom, or parking it at the manufacturer's recommended angle, and setting swing and drum brakes and locks.
- Tower cranes: manufacturers normally require the slewing brake to be released when out of service, so the jib can weathervane with the wind. Never lock a tower crane against the wind unless the manual allows it.
- Lightning: neither 230 CMR nor OSHA Subpart CC sets a lightning distance, but a crane boom is a tall conductor. Most contractors adopt a lightning policy, for example stopping lifts and moving people to shelter when thunder is heard or lightning is seen, and waiting 30 minutes after the last thunder before resuming. Lower the load and boom first if it can be done safely. Never shelter under the boom or next to outrigger pads.
Ice, snow and cold
- Ice and snow add weight. Ice on a lattice boom or snow on telescopic sections adds uncalculated dead weight at a long lever arm and can jam limit switches, A2B weights and sheaves. OSHA 1926.1417(n) makes the competent person responsible for adjusting operations for these effects. Clear the boom, or reduce loads as the manufacturer directs.
- Cold affects hydraulics and steel. Cold, thick hydraulic oil makes controls sluggish and can delay brake release. Warm up the hydraulics per the manual before working. Structural steels lose toughness at low temperature, so avoid shock loading. Crane manufacturers publish minimum operating temperatures and any cold-weather capacity reductions for their machines, and those figures govern.
- Slings and rope: synthetic web slings have temperature limits (Section 8.1), and frozen, wet fiber slings need the manufacturer's guidance.
Under 230 CMR 6.09(1)(k), what wind limit applies to continued crane operation in Massachusetts?
A fixed limit of 20 mph for all cranes
No limit, as long as taglines are used
A fixed limit of 30 mph for cranes on outriggers
Wind speed must not exceed the manufacturer's recommendations
Wind speed increases from 15 mph to 30 mph. By what factor does the wind pressure on a flat panel increase?
It doubles
It quadruples
It increases by 50%
It stays the same
A local storm warning is issued while a crane is working. What does OSHA 29 CFR 1926.1417(h) require?
The competent person must determine whether it is necessary to implement the manufacturer's recommendations for securing the equipment
Work must stop for exactly 30 minutes
The crane must be derated by 25%
The operator must call the OPSI incident hotline
Sections you finish are checked off in the contents.