7.1 Running & Pulling Casing and Liner: Swab, Surge, Returns & Shut-In
Key Takeaways
Casing and liners leave small annular clearance, so swab and surge pressures are much higher than with drill pipe; running speeds are limited and circulation is broken at planned depths.
IWCF lists three ways to monitor returns when running casing: the trip tank, fill-up monitoring and the casing running sheet, which compares expected and actual displacement joint by joint.
With conventional float equipment each joint displaces its closed-end volume (about 3.6 bbl per 40 ft joint of 9-5/8-inch casing); extra returns suggest an influx and fewer returns suggest losses.
If unfilled casing's float fails, annulus mud U-tubes into the casing; IWCF's formula gives a loss of about 142 psi for 400 ft unfilled 9-5/8-inch casing in 12-1/4-inch hole with 12.0 ppg mud.
Shut-in when running casing is stop operations, secure the string (crossover plus safety valve), and shut in the well, normally on the annular because pipe rams do not fit casing.
Running casing or a liner is one of the riskiest routine operations for well control. The IWCF Level 2 syllabus gives it its own topic area because the large-diameter pipe changes almost everything the crew relies on while tripping drill pipe: swab and surge pressures are higher, the trip tank behaves differently, and the equipment used to shut in the well must suit the casing in the slips.
Why Large-Diameter Tubulars Raise the Risk
Casing and liners have a much larger outside diameter than drill pipe, so the annular clearance between the pipe and the hole (or the previous casing) is small. For example, 5-inch drill pipe in 8-1/2-inch hole leaves 1.75 in of radial clearance, but 9-5/8-inch casing in 12-1/4-inch hole leaves about 1.3 in, and only about 0.8 in at the couplings.
Small clearance means the mud displaced by the moving pipe must flow through a narrow gap at high velocity, so:
- Surge while running in is much higher than with drill pipe. Running too fast can fracture the formation, especially at the previous shoe, and cause losses; losses lower the fluid level and can then let another zone kick.
- Swab while picking up or pulling casing or a liner is also higher. Pulling casing back out of the hole (for example after a failed run) needs slow, controlled speeds and close monitoring.
Most casing is run with float equipment (a float shoe and float collar) that stops mud entering from below. The string is then closed-ended: each joint pushes its whole closed-end volume of mud out of the well, which increases surge, and the casing must be filled from surface at intervals. Some float equipment is auto-fill: it lets mud enter while running to reduce surge, and is converted to a one-way float before cementing.
Typical controls are set in the casing programme: maximum running speeds (seconds per joint), breaking circulation at planned depths, and filling the casing on schedule.
Monitoring Returns When Running Casing
The IWCF syllabus names three tools for monitoring returns while running and pulling large-diameter tubulars:
| Tool | What it shows |
|---|---|
| Trip tank | The well is lined up on the trip tank so the volume pushed out by each joint, or taken while pulling, can be measured accurately |
| Fill-up monitoring | The mud used to fill the casing is measured against the calculated casing capacity, so a float failure or losses can be spotted |
| Casing running sheet | Lists each joint, cumulative length, expected displacement and fill-up volume, and the actual returns recorded as each joint is run |
Worked Example: Expected Returns per Joint
With conventional floats, 9-5/8-inch casing displaces its closed-end volume:
So each 40 ft joint should push about of mud out of the well. If the trip tank gains 4.5 bbl on a joint, the extra 0.9 bbl is unexplained and may be an influx. If it gains noticeably less than 3.6 bbl, mud is being lost to the formation, often because of surge. Either way, stop, tell the Driller, and flow check.
Float Failure and Hydrostatic Loss
If the casing is not filled and the float equipment then fails, mud from the annulus U-tubes into the empty part of the casing. The annulus level falls and bottom-hole pressure drops. IWCF's formula sheet gives the hydrostatic pressure loss as:
Example: 9-5/8-inch casing (capacity ) in 12-1/4-inch hole (annular capacity ), with 400 ft unfilled and 12.0 ppg mud:
The annulus level falls about 227 ft. If the overbalance was less than 142 psi, the well can kick. Filling on schedule keeps the unfilled height small.
Shut-In Procedure When Running Casing
IWCF's syllabus summarises the steps as stop operations, secure the string, shut in the well:
- Stop operations: stop running and set the casing in the slips or spider with a coupling at a safe working height.
- Secure the string: install a crossover from the casing thread to a full-opening safety valve (or a circulating head fitted with a valve) and close it. This crossover and valve must be made up and ready on the drill floor before casing running starts.
- Shut in the well: close the annular preventer (or casing rams, if the stack has been fitted with them for the job), then open the choke-line (HCR) valve against the closed choke.
- Notify the supervisor, record shut-in casing pressure and pit gain, and monitor the well.
Points specific to casing:
- Pipe rams do not fit casing. Unless casing rams are installed, the annular preventer is the only preventer that will seal around it.
- Annular closing pressure must follow the manufacturer's chart for casing, because excessive pressure can collapse the casing.
- Shear rams may not be able to cut casing, so the plan must say what happens if the annular does not seal.
- When a liner is run on drill pipe, the shut-in uses the annular on the liner while the liner is across the BOP, and the normal drill pipe shut-in (safety valve and pipe rams) once drill pipe is across the stack.
The Level 2 crew's part is the same as on any trip: watch the trip tank and running sheet, report any difference to the Driller at once, and be ready to stab and close the safety valve.
Why are swab and surge pressures usually much higher when running or pulling casing than when tripping drill pipe?
The large outside diameter of casing leaves a small annular clearance, so displaced mud must flow through a narrow gap at high velocity.
Casing is always run with oil-based mud, which has no gel strength.
Casing joints are shorter than drill pipe stands, so the pipe must be moved faster.
Casing is run with the BOP closed, which traps the displaced mud.
While running 9-5/8-inch casing with conventional floats, each 40 ft joint should displace about 3.6 bbl into the trip tank. Over the last joint the trip tank gained 4.5 bbl. What should the crew member watching the trip tank do?
Nothing, because casing returns are always irregular.
Pump a heavy slug down the casing to stop the extra flow.
Increase the running speed to reach the shoe before the gain grows.
Report the 0.9 bbl excess to the Driller immediately, because it may be an influx; the Driller stops and flow checks.
A well starts to flow while casing is being run. Which sequence matches the IWCF Level 2 shut-in procedure for running casing?
Close the pipe rams on the casing, then install the safety valve.
Keep running casing to bottom as fast as possible, then circulate.
Stop operations and set the casing in the slips, secure the string with a crossover and closed safety valve, then shut in the well on the annular (or casing rams) and open the HCR.
Open the choke and bleed the flow to the mud-gas separator without closing any preventer.
9-5/8-inch casing (capacity 0.0732 bbl/ft) is in 12-1/4-inch hole (annular capacity 0.0558 bbl/ft) with 12.0 ppg mud. The top 400 ft of casing has not been filled when the float fails. Using IWCF's formula, what is the approximate loss of bottom-hole hydrostatic pressure?
250 psi
142 psi
75 psi
312 psi