PracticeVideosBlogFlashcards

3.3 Tripping Operations & Trip Tank Monitoring

Key Takeaways

  • The trip tank is a small-volume (20–50 bbl), high-resolution vessel designed to measure small fluid volume changes (0.1–0.5 bbl) during tripping operations.

  • Trip sheets track theoretical metal displacement against actual measured hole fill stand-by-stand; taking less mud indicates an influx, while taking more indicates lost circulation.

  • Pulling wet pipe removes the closed-end volume (steel displacement plus pipe capacity), about three times or more the fill needed for dry pipe (3.4 times in the 5-inch example).

  • Slugging the drill string with heavy mud creates a U-tube imbalance that drops the fluid level inside the drill pipe below the rotary table, allowing pipe to be pulled dry and producing an initial predictable surface pit gain.

  • Typical flow-check points are on bottom before tripping, at the casing shoe, before the BHA enters the BOP, and whenever the trip sheet shows an unexplained deviation; if a static well has swabbed, run back to bottom and circulate the influx out.

Last updated: October 2026

Important

A large proportion of kicks are taken while tripping, mainly through swabbing and failure to keep the hole full. Rigorous volumetric tracking using a dedicated trip tank and an accurate stand-by-stand trip sheet represents the driller's primary line of defense against undetected influxes.

The Tripping Process

Tripping means pulling the drill string out of the hole and running it back in, usually to change the bit or BHA:

  • Pulling out of hole (POOH): stands are pulled, broken out and racked in the derrick. Steel leaves the well, so the hole must be filled with mud to replace it. The main risk is swabbing.
  • Running in hole (RIH): stands are picked up and run back in. The pipe pushes mud out of the well into the trip tank. The main risk is surging, and a string with a float must be filled at intervals.
  • A round trip is a complete trip out and back in. The well must be monitored on the trip tank throughout, including while the bit is out of the hole.

The Trip Tank: Engineering Design and Principles

Active mud pits are poorly suited for monitoring tripping operations. A typical active mud pit holds between 200200 and 500 bbl500 \text{ bbl} of fluid across a wide surface area; a volume change of 11 to 2 bbl2 \text{ bbl} represents a liquid level variation of less than a tenth of an inch, making precise detection virtually impossible.

The trip tank is an engineered monitoring vessel specifically designed to solve this limitation:

  • Capacity and Dimensions: Small total volume (typically 2020 to 50 bbl50 \text{ bbl}), constructed as a tall, narrow rectangular or cylindrical tank.
  • High Measurement Resolution: Because the cross-sectional area is small, a 1 bbl1 \text{ bbl} volume change causes a prominent liquid level shift of several inches. Calibrated digital transducers and mechanical float pointers provide resolution to within 0.10.1 to 0.5 bbl0.5 \text{ bbl}.
  • Continuous vs. Batch Filling:
    • Continuous Filling: A low-rate centrifugal pump continuously circulates mud from the trip tank to the bell nipple, with an overflow line returning excess fluid back to the tank. As pipe is pulled, fluid fills the wellbore automatically, and the trip tank level drops continuously in direct proportion to displaced steel.
    • Batch Filling: The well is filled periodically after pulling a fixed number of stands (e.g., every 3 to 5 stands of drill pipe, or after every single stand of drill collars), recording the exact volume required to refill the hole to the overflow line.

Trip Sheets: Stand-by-Stand Displacement Tracking

A trip sheet is an active accounting ledger maintained by the driller, mud logger, and derrickman throughout every tripping operation. It records cumulative theoretical metal displacement against actual measured mud fill from the trip tank.

Discrepancy=Vactual fill−Vtheoretical displacement\text{Discrepancy} = V_{\text{actual fill}} - V_{\text{theoretical displacement}}

Interpreting Trip Sheet Discrepancies

  • Case 1: Actual Fill < Theoretical Displacement: The well took less mud than calculated metal displacement. Formation fluid has entered the wellbore (swabbed influx) and is displacing mud volume. Tripping must stop immediately to conduct a formal flow check!
  • Case 2: Actual Fill > Theoretical Displacement: The well took more mud than calculated metal displacement. Drilling fluid is leaking into the formation (lost circulation), risking a drop in annular hydrostatic level. Tripping must halt to monitor the well and prepare remedial action.

Any deviation from the expected trip-sheet value that cannot be explained is treated as a warning: stop the trip and flow check. Many operators also set a numeric tolerance in their procedures, but a Level 2 crew member's duty is simply to report any difference to the Driller at once.


Pulling Dry Pipe vs. Pulling Wet Pipe

Accurately calculating theoretical displacement requires distinguishing between dry and wet pipe:

1. Pulling Dry Pipe

When pulling dry pipe, fluid inside the drill string drains freely through the bit nozzles back into the well. Only the volume of the steel pipe wall leaves the borehole:

Vfill, dry=Lpulled×Steel Displacement Factor (bbl/ft)V_{\text{fill, dry}} = L_{\text{pulled}} \times \text{Steel Displacement Factor (bbl/ft)}

Example Calculation: Pulling 5 stands (465 ft465 \text{ ft}) of 5-inch, 19.5 lb/ft19.5 \text{ lb/ft} drill pipe with a steel displacement factor of 0.00753 bbl/ft0.00753 \text{ bbl/ft} requires:

Vfill=465 ft×0.00753 bbl/ft=3.50 bblV_{\text{fill}} = 465 \text{ ft} \times 0.00753 \text{ bbl/ft} = 3.50 \text{ bbl}

2. Pulling Wet Pipe

When the bit nozzles are plugged, or when no heavy slug is pumped and the mud cannot drain fast enough, drilling mud is pulled out inside the pipe. The pipe comes out full of mud and dumps onto the rig floor. Both the steel wall and the internal fluid capacity leave the well:

Vfill, wet=Lpulled×(Steel Displacement+Internal Capacity)=Lpulled×Closed-End DisplacementV_{\text{fill, wet}} = L_{\text{pulled}} \times (\text{Steel Displacement} + \text{Internal Capacity}) = L_{\text{pulled}} \times \text{Closed-End Displacement}

Example Calculation: The same 5-inch pipe has an internal capacity of 0.01776 bbl/ft0.01776 \text{ bbl/ft}. The closed-end displacement is:

Closed-End Factor=0.00753+0.01776=0.02529 bbl/ft\text{Closed-End Factor} = 0.00753 + 0.01776 = 0.02529 \text{ bbl/ft}

Vfill, wet=465 ft×0.02529 bbl/ft=11.76 bblV_{\text{fill, wet}} = 465 \text{ ft} \times 0.02529 \text{ bbl/ft} = 11.76 \text{ bbl}

Warning

Pulling wet pipe requires more than 3.3 times the fill volume of dry pipe! If a driller mistakenly calculates hole fill using dry displacement tables while pulling wet pipe, the hole will be under-filled by about 8.3 bbl8.3 \text{ bbl} every 5 stands. In 8.5-inch8.5\text{-inch} hole around 5-inch pipe (about 0.046 bbl/ft0.046 \text{ bbl/ft} of annulus) that is roughly 180 ft of lost fluid column each time, hundreds of feet within a few groups of stands, enough to trigger a severe kick.


Slugging the Drill String: Physics of U-Tubing

To avoid the hazards, mess, and volumetric confusion of pulling wet pipe, crews pump a heavy slug into the drill string prior to tripping out.

The U-Tube Slugging Procedure

  1. A high-density mud pill (typically 2.02.0 to 4.0 ppg4.0 \text{ ppg} heavier than active mud weight) with a volume of 1515 to 30 bbl30 \text{ bbl} is mixed in the slug pit.
  2. The slug is pumped into the top of the drill pipe and displaced down the string until it is positioned in the upper drill pipe, well above the bit.
  3. The mud pump is disengaged and the drill string is vented to atmosphere.
  4. Hydrostatic U-Tubing: Because the high-density slug column exerts greater hydrostatic pressure than the surrounding active mud in the annulus, the fluid inside the drill string falls, pushing annular fluid upward and out into the surface pits until hydrostatic balance is achieved at the bit nozzles:

HPstring=HPannulusHP_{\text{string}} = HP_{\text{annulus}}

As the fluid falls, the internal liquid level drops below the rotary table by a vertical distance Δhdrop\Delta h_{\text{drop}}:

Δhdrop=Vslug×(MWslug−MWmud)MWmud×DP Capacity (bbl/ft)\Delta h_{\text{drop}} = \frac{V_{\text{slug}} \times (\text{MW}_{\text{slug}} - \text{MW}_{\text{mud}})}{\text{MW}_{\text{mud}} \times \text{DP Capacity (bbl/ft)}}

This drop creates an empty interval of 150150 to 300 ft300 \text{ ft} inside the pipe below the rig floor, allowing stands to be disconnected and racked dry without spillage.

Surface Pit Gain Accounting

The mud displaced out of the drill string flows up the annulus and discharges into the active surface pits, generating a predictable pit gain:

Vpit gain=Δhdrop×DP Capacity (bbl/ft)=Vslug×(MWslugMWmud−1)V_{\text{pit gain}} = \Delta h_{\text{drop}} \times \text{DP Capacity (bbl/ft)} = V_{\text{slug}} \times \left(\frac{\text{MW}_{\text{slug}}}{\text{MW}_{\text{mud}}} - 1\right)

Crew pit discipline requires calculating this expected gain in advance. Any pit gain in excess of the theoretical U-tube volume indicates that an influx has entered during the slugging process!


Trip Margin

A trip margin is an intentional safety increment added to the drilling mud density prior to pulling out of hole, designed to offset the calculated swab pressure drop (PswabP_{\text{swab}}):

Trip Margin (ppg)=Pswab anticipated0.052×TVD\text{Trip Margin (ppg)} = \frac{P_{\text{swab anticipated}}}{0.052 \times \text{TVD}}

The trip margin is set in the well programme (a few tenths of a ppg is common), providing a hydrostatic buffer that prevents transient underbalance during pipe withdrawal.


Flow-Check Protocols During Tripping Operations

A flow check requires halting all pipe motion, lining the well up on the trip tank (or visual observation at the bell nipple), and verifying that the well is completely static.

Flow-Check Duration and Points

The observation period is set by company procedure (commonly 10 to 15 minutes, and longer in some conditions, for example with oil-based mud or in deep, hot wells). Typical flow-check points are:

  1. On Bottom Prior to Tripping Out: After circulating bottoms up and confirming mud properties are homogenous and gas-free.
  2. At the Casing Shoe: When the bit reaches the casing shoe, isolating the open-hole section from the surface casing.
  3. Before the BHA Enters the BOP Stack: Drill collars and stabilizers have minimal clearance in the BOP bore; checking flow before entering the stack ensures the well is static before rams are restricted.
  4. Whenever the Trip Sheet Shows a Discrepancy: any time the hole takes more or less mud than the calculated displacement and the difference cannot be explained.
  5. Whenever Overpull or Swabbing Indications Occur: Any tight hole drag encountered during hoisting.

Actions When the Trip Sheet Shows an Influx

The IWCF syllabus rates this outcome at the highest importance level. When the trip tank shows the hole has taken too little mud:

  1. Stop the trip and flow check: set the slips, install the open full-opening safety valve, and watch the trip tank.
  2. If the well is flowing: shut the well in immediately using the tripping shut-in procedure (Chapter 5).
  3. If the well is static: the swabbed influx is still in the hole. Run back to bottom, checking the trip tank displacement on every stand, and then circulate the influx out (bottoms up), taking returns through the choke and mud-gas separator if gas is expected. Only then is the trip restarted, often with a higher trip margin or by pumping out of the hole.

Running back to bottom matters because an influx can only be circulated out from below; circulating with the bit high in the hole would leave the influx beneath the bit.

Loading diagram...
Trip Tank Monitoring and Heavy Slug U-Tube Dynamics
Test Your Knowledge

While pulling 10 stands of drill collars out of the hole, the theoretical steel displacement is 12.0 barrels, but the trip tank shows that the hole took only 7.0 barrels of mud to fill. What does this 5.0-barrel discrepancy indicate?

A

The drilling mud has experienced thermal shrinkage, reducing the volume needed to fill the annulus.

B

The wellbore has experienced lost circulation into an unmapped natural fracture.

C

The drill collars were pulled wet and retained drilling fluid inside their bore.

D

An influx of 5.0 barrels has been swabbed into the wellbore and is displacing drilling fluid.

Test Your Knowledge

If a drill string is pulled wet (for example, with plugged bit nozzles) instead of dry, how does the required hole-fill volume compare to standard dry pipe displacement?

A

It is identical because steel wall displacement is unaffected by internal fluid contents.

B

It is substantially greater because the hole must be filled for both the steel volume and the internal capacity of the pipe (closed-end displacement).

C

It is substantially smaller because fluid draining from the pipe automatically fills the annular void.

D

It is zero because the surface mud pumps must remain engaged throughout the tripping process.

Test Your Knowledge

Prior to pulling out of the hole, the crew pumps a 25-barrel heavy mud slug into the top of the drill pipe. After pumping stops and the string is vented, the active pit level increases by 7.0 barrels. What is the physical explanation for this pit gain?

A

The well is kicking due to an immediate failure of the annular casing shoe.

B

The mud pumps experienced valve slippage and over-displaced the surface lines.

C

The heavy slug in the drill string has higher hydrostatic head than the annular mud, causing fluid to U-tube down the string and push 7.0 barrels of annular mud into the surface pits.

D

The heavy slug chemically reacted with the base mud and expanded in volume.

Test Your Knowledge

Which set of points is commonly specified for flow checks during a trip out of the hole?

A

On bottom before starting out of hole, at the casing shoe, before the BHA enters the BOP stack, and whenever trip tank readings deviate from theoretical displacement.

B

Only at total depth before tripping and upon laying down the drill bit on the catwalk.

C

Every 10 stands in casing, every 30 stands in open hole, and after washing down each joint.

D

Only when the mud logger reports a total gas reading exceeding 500 units on the chromatograph.

Sections you finish are checked off in the contents.