2.3 Space Missions, Emerging Tech & Information Technology Security
Key Takeaways
PSLV alternates solid, liquid, solid and liquid stages. Standard LVM3 uses twin S200 solid boosters, an L110 liquid core and a C25 cryogenic upper stage.
Chandrayaan-3 landed in the Moon’s south polar region. Aditya-L1 studies the Sun from a halo orbit around Sun–Earth L1. Gaganyaan is a human spaceflight programme.
India’s green hydrogen standard includes renewable-powered electrolysis and biomass conversion, with a defined emissions limit.
Aadhaar supports identity verification, UPI handles payments, DigiLocker supplies issuer-backed documents and ONDC connects participants in digital commerce.
HTTPS protects and authenticates the connection to the web origin. Confirm the Commission’s address independently before responding to a recruitment message.
Launch Vehicles and Target Orbits
Solid stages carry solid propellant. Liquid stages feed liquid propellants to their engines. A cryogenic stage uses propellants stored at very low temperatures. ISRO’s C25 uses liquid hydrogen and liquid oxygen. It is a liquid-propellant stage with a distinct thermal and storage requirement.
| Vehicle | Main propulsion stages | Example role |
|---|---|---|
| PSLV, Polar Satellite Launch Vehicle | Four stages, solid → liquid → solid → liquid. The last stage, PS4, has two liquid engines. Configurations differ in their strap-on boosters. | ISRO publishes a capability of up to 1,750 kg to a 600 km sun-synchronous polar orbit. PSLV-C57 launched Aditya-L1 on its way to the Sun–Earth L1 region. |
| GSLV Mk II, Geosynchronous Satellite Launch Vehicle Mark II | Three stages, solid → liquid → cryogenic. The first stage has four liquid strap-ons. The third stage is cryogenic, with an indigenous stage inducted from GSLV-D5. | ISRO lists 2,250 kg to geosynchronous transfer orbit (GTO), used as an intermediate orbit for some communication satellites. |
| LVM3, Launch Vehicle Mark-3 | In the standard configuration, two S200 solid boosters, L110 liquid core, and C25 cryogenic upper stage. | ISRO lists 4,000 kg to GTO and 8,000 kg to low Earth orbit for this configuration. LVM3-M4 launched Chandrayaan-3. |
Worked comparison. The published 1,750 kg figure for PSLV and 4,000 kg for LVM3 refer to different destination orbits. For a question about stages, the clues are simpler. A final pair of liquid engines in PS4 points to PSLV. Twin S200 boosters and a C25 upper stage point to standard LVM3.
Missions, Navigation and Programme Milestones
- Chandrayaan-3. LVM3-M4 launched the mission on 14 July 2023. Vikram touched down in the Moon’s south polar region on 23 August 2023, and deployed the Pragyan rover. The landing site is at about 69.37° south. The rover’s LIBS instrument confirmed sulfur in material at the landing site.
- Aditya-L1. ISRO’s first dedicated space observatory for solar studies launched on PSLV-C57 on 2 September 2023. It entered a halo orbit around Sun–Earth L1 on 6 January 2024. L1 is about 1.5 million km from Earth in the direction of the Sun. This orbit offers a largely unobstructed view of the Sun, supporting sustained solar observations.
- Gaganyaan. ISRO plans to demonstrate India’s crewed orbital capability using human-rated LVM3, a Crew Escape System, and a crew module recovered after a sea splashdown. The mission profile envisages an orbit at about 400 km. ISRO reported a successful main-parachute drop test on 7 July 2026. The test demonstrated part of the recovery system.
- NavIC. Navigation with Indian Constellation provides regional positioning, navigation and timing. Its primary service area extends across India and about 1,500 km beyond the Indian landmass. ISRO specifies a positioning design accuracy better than 20 m at two sigma for the standard positioning service. The original constellation design uses geostationary and inclined geosynchronous satellites. The NVS series adds a civil L1-band signal. ISRO’s February 2026 report records that NVS-02 could not complete orbit raising to its intended circular orbit. Keep the service design, satellite launch and satellite commissioning distinct.
Biotechnology and Energy
CRISPR-Cas9 is a genome-editing tool. An RNA guide provides sequence recognition and Cas9 can cut DNA at the recognized site. Editing outcomes depend on how the cell responds to the cut. In an mRNA vaccine, the supplied RNA gives cells temporary instructions to make an antigen that prompts an immune response. The mRNA instructions are read outside the nucleus and do not change the recipient’s DNA. The first example describes a tool that can edit DNA. The vaccine example uses the cell’s protein-making machinery.
Green hydrogen in India. The Ministry of New and Renewable Energy standard defines the term using renewable energy, including production by electrolysis or conversion of biomass. For each of these routes it sets a non-biogenic emissions ceiling of 2 kg carbon-dioxide equivalent per kg of hydrogen, averaged over the preceding 12 months, with the production boundary specified for the route. For an exam question about India’s standard, remember the renewable source and the emissions criterion. Electrolysis describes one production route.
India’s three-stage nuclear power programme. The Indira Gandhi Centre for Atomic Research describes pressurised heavy water reactors in the first stage, fast breeder reactors in the second and advanced systems using thorium in the third. The Department of Atomic Energy announced that the Prototype Fast Breeder Reactor at Kalpakkam attained first criticality on 6 April 2026. This means that a controlled fission chain reaction was achieved. The announcement records that reactor milestone, which is distinct from the start of commercial electricity supply.
Digital Public Infrastructure
| Service | What it provides |
|---|---|
| Aadhaar | A 12-digit identifier issued by the Unique Identification Authority of India. It can be used for authentication where applicable. Section 9 of the Aadhaar Act provides that the number or its authentication does not by itself confer or prove citizenship or domicile. |
| UPI | The Unified Payments Interface, developed by the National Payments Corporation of India, supports instant payments. A payment address is one way to route an eligible transaction. AePS, the Aadhaar Enabled Payment System, separately allows Aadhaar-authenticated access to eligible bank accounts for basic banking transactions. |
| DigiLocker | The Ministry of Electronics and Information Technology’s initiative for digital documents. Rule 9A permits requesters to accept digitally or electronically signed documents shared from DigiLocker at par with the physical documents. When an issuer provides the document and a requester accesses it through its URI, the rule treats it as shared directly by the issuer. An individual’s uploaded scan is a different category. |
| ONDC | The Open Network for Digital Commerce, an initiative of the Department for Promotion of Industry and Internal Trade based on open-network principles. Buyer and seller apps can participate separately and exchange transactions across the network. |
Worked example. A student retrieves an issuer-backed marksheet in DigiLocker, pays a merchant through UPI, and checks an application update on the Commission’s own website. The document, payment and recruitment record come from different systems.
Secure Connections and Fake Notices
Phishing uses messages that impersonate a trusted sender. An unsolicited SMS demanding an OTP to release a hall ticket is a reason to stop and verify the request independently. Two-factor authentication uses two different kinds of evidence, such as a memorised password and possession of a registered security key. Two passwords are both knowledge factors. An OTP can still be stolen if the recipient submits it to a fraudulent site.
A valid HTTPS connection uses TLS to protect the confidentiality and integrity of traffic and authenticate the website’s origin. This applies to the hostname actually reached. The browser’s connection indicator gives separate information from any claim about who operates the website. Some browsers display a padlock and others use a different control.
For Notification 23/2026, the notice gives psc.ap.gov.in as the Commission’s website and says instructions on hall tickets will be provided through the website. The Commission also publishes announcements on portal-psc.ap.gov.in. Open the Commission’s website from a known address or trusted bookmark and find the notice there. Compare the expected hostname and heed certificate warnings. Keep OTPs and credentials out of an unverified message or form.
Sources checked 21 November 2026. ISRO PSLV, ISRO GSLV Mk II, ISRO LVM3, Chandrayaan-3, ISRO’s launch and touchdown chronology, Chandrayaan-3 landing report, Aditya-L1 orbital insertion, Gaganyaan mission profile, Gaganyaan parachute test, ISRO satellite navigation services, NVS design, NVS-02 report, Jinek and colleagues’ 2012 Cas9 study, CDC on mRNA vaccines, MNRE green hydrogen standard, IGCAR three-stage programme, DAE first criticality announcement, Aadhaar Act, NPCI on UPI, NPCI AePS booklet, MeitY’s DigiLocker initiative, Rule 9A as inserted by the 2017 amendment, DigiLocker Rule 9A circular, ONDC, TLS and service identity, Chromium connection indicators, NIST authentication guidelines, CERT-In Digital Safety Compass, APPSC Notification 23/2026 facsimile and Commission announcements.
Which comparison correctly describes PSLV and standard LVM3 propulsion?
PSLV uses four solid stages. LVM3 consists of three cryogenic stages.
PSLV uses a cryogenic PS4. LVM3 has no solid boosters.
PSLV alternates liquid and cryogenic stages. LVM3 ends in a solid stage.
PSLV has solid, liquid, solid and liquid stages. LVM3 has two S200 solid boosters, an L110 liquid core and a C25 cryogenic upper stage.
Which statement correctly identifies a mission or programme and its outcome or purpose?
Chandrayaan-3 placed the Pragyan rover in a solar halo orbit.
Aditya-L1 entered a halo orbit around Sun–Earth L1, about 1.5 million km from Earth, for solar observations.
NavIC uses satellites as a space-based optical telescope to observe the Sun.
The July 2026 Gaganyaan parachute drop test put astronauts in orbit.
In a hypothetical example, an unsolicited SMS links to https://hall-ticket.example with a valid HTTPS connection and asks for an Aadhaar OTP. Which conclusion and action are appropriate?
The connection identifies the website as an APPSC service, so submit the OTP there.
The connection proves the form uses UIDAI-approved two-factor authentication, so reply with the OTP.
HTTPS secures the connection to the hostname reached. Leave the link and check the notice through a known APPSC address.
HTTPS prevents phishing on that page, so the message sender has been verified.
Sections you finish are checked off in the contents.