6.2 ISO/IEC 27001 ISMS Certification Lifecycle
Key Takeaways
ISO/IEC 27001:2022, with Amendment 1:2024, sets ISMS requirements. Document the scope, including relevant interfaces, dependencies, and context.
Use risk treatment to select necessary controls. Compare with Annex A and document necessity, justification, implementation status and exclusions in the Statement of Applicability.
Stage 1 assesses readiness. Stage 2 evaluates implementation and effectiveness. The certification body decides separately from the audit team.
The certification body verifies corrections and corrective actions for major findings before a positive decision. It reviews and accepts a plan for minor findings.
Plan surveillance and recertification from the certification decision, scope and risk. Verify corrective action and changes with evidence.
ISO/IEC 27001 ISMS Certification Lifecycle
An information security management system (ISMS) turns security objectives into repeatable decisions about scope, risk, controls, evidence and improvement. ISO/IEC 27001:2022 sets requirements for the ISMS. ISO/IEC 27002:2022 gives control guidance. Accredited third-party certification applies to a defined management system scope. Check what a supplier's certificate actually covers before relying on it for a particular service.
Clauses 4–10 and the scope decision
An organization claiming conformity with ISO/IEC 27001 cannot exclude requirements in Clauses 4–10. It determines and documents the scope of the ISMS. Within that scope, it evaluates relevant information security risks, selects controls and verifies their operation.
| Clause | Executive decision or evidence |
|---|---|
| 4 Context | Determine relevant internal and external issues, interested parties and requirements, and which requirements the ISMS will address. Define scope, including interfaces and dependencies. |
| 5 Leadership | Define policy, assign authority and demonstrate top management commitment through decisions and resources. |
| 6 Planning | Set risk assessment and treatment processes, security objectives and plans for changes to the ISMS. |
| 7 Support | Provide resources, competence, awareness, communications and controlled documented information. |
| 8 Operation | Carry out operational controls, assess risks at planned intervals and when significant changes are proposed or occur, and implement the treatment plan. |
| 9 Performance evaluation | Determine what to monitor and how, conduct internal audits at planned intervals, and have top management review the ISMS at planned intervals. |
| 10 Improvement | Improve the ISMS continually and address nonconformities, causes and corrective action effectiveness. |
Amendment 1:2024 adds a requirement in 4.1 to determine whether climate change is relevant and a note in 4.2 that relevant interested parties can have climate-related requirements. An ISMS team could determine that flood exposure or extended power interruptions affect the availability of an included service, then document the resulting dependencies and risk decisions. The amendment does not prescribe the same controls for all organizations.
For a supplier hosting an application, define the certified business activities, services, locations and technology boundaries. Evaluate identity, communications, managed services and other external interfaces and dependencies. An externally operated identity service can still matter to the ISMS. Document how the service is governed and evidence is obtained. Compare the scope statement and certification scope against how customers actually use and administer the product. ISO/IEC 27001:2022 · ISO/IEC 27001:2022/Amd 1:2024 · ISO and IAF climate amendment communiqué
Risk treatment and the Statement of Applicability
Under Clause 6.1.3, select treatment options and determine the controls needed to implement them. Compare those controls with Annex A to verify that no necessary controls have been omitted. A control may come from Annex A, other sources or the organization's design. The Statement of Applicability (SoA) identifies the necessary controls, justifies their inclusion, indicates whether they are implemented and justifies exclusions of Annex A controls. Maintain a treatment plan and obtain risk owners' approval of the plan and acceptance of residual risk.
Annex A of the 2022 edition references 93 controls in four themes. The related ISO/IEC 27002:2022 presents implementation guidance. The 2022 restructuring reduced the former 114-control arrangement and introduced 11 new controls. The table illustrates the Annex A numbering.
| Theme | Count | Examples |
|---|---|---|
| Organizational | 37 | A.5.7 threat intelligence, A.5.23 cloud services, A.5.30 ICT readiness for business continuity. |
| People | 8 | Screening, awareness, and remote working. |
| Physical | 14 | A.7.4 physical security monitoring. |
| Technological | 34 | A.8.9 configuration management, A.8.10 information deletion, A.8.11 data masking, A.8.12 data leakage prevention, A.8.16 monitoring, A.8.23 web filtering, and A.8.28 secure coding. |
Worked decision. A software provider handles sensitive data in a public cloud. Engineers propose omitting data leakage controls to reduce cost. Assess the plausible disclosure paths and contractual commitments, determine the necessary controls and compare them with Annex A. If a controlled pipeline and restricted data export address the risk better than a proposed product, document the actual controls and evidence, including any justified Annex A exclusion. If a necessary safeguard is unimplemented, record its status, treatment, owner and remaining risk. A cloud architecture alone neither proves that a physical or cloud control is unnecessary nor establishes that every Annex A control applies. ISO/IEC 27001:2022 §6.1.3 and Annex A · ISO/IEC 27002:2022 · IAF MD 26
Initial audit and certification decision
The organization owns conformity. A certification body audits the ISMS and makes the certification decision. An accreditation body evaluates the competence of the certification body. ISO/IEC 17021-1:2015 sets management system certification-body requirements, and ISO/IEC 27006-1:2024 adds ISMS-specific requirements. Check the issuing body's accreditation and scope where required. The IAF transition arrangements for certification bodies to use ISO/IEC 27006-1:2024 for all clients reached their deadline on March 31, 2026.
- Stage 1 reviews documented information, scope and preparedness, site-specific conditions and plans for Stage 2. The audit considers whether internal audits and management reviews are being planned and performed, and whether the ISMS is sufficiently implemented for Stage 2. The body informs the client of conclusions and areas of concern. The outcome can affect the timing or need to repeat work.
- Stage 2 evaluates implementation and effectiveness. Support interviews, observations and appropriately selected evidence of controls, operations, monitoring and governance. The team reports findings and recommendations. The certification decision is made by competent personnel different from those who conducted the audit.
What findings require before the decision
A major nonconformity affects the management system's ability to achieve intended results. Significant doubt about effective process control or related minor findings that indicate systemic failure can support a major finding. Before a positive certification decision the body must review, accept and verify correction and corrective action for major nonconformities. If it cannot verify implementation within six months after the last day of initial Stage 2, another Stage 2 is required before it recommends certification. The body or scheme may set earlier action dates.
A minor nonconformity does not affect that underlying capability. Before granting certification the body reviews and accepts the client's plan for correction and corrective action. Follow the body's requirements for subsequent evidence and verification. Findings may also identify opportunities for improvement, which do not replace reporting an actual nonconformity. For any nonconformity, identify the unmet requirement and affected processes, correct the specific issue, address the cause and verify effectiveness. ISO/IEC 17021-1:2015 §§3.12–3.13, 9.3 and 9.5 · ISO/IEC 27006-1:2024 · IAF MD 29 · ANAB certification client guidance
Surveillance and recertification
The standard initial three-year audit program begins with the certification decision. After initial certification, the first surveillance audit is due within 12 months of the certification decision. Surveillance is at least once per calendar year except in recertification years. The program reflects scope, changes and prior results, with sampling of representative areas. It addresses matters such as internal audits, management review, prior nonconformities, continuing operational control and effectiveness. A fixed percentage of Annex A is not the governing test.
Review risks, decisions, scope changes and evidence of corrective actions before surveillance. For example, an organization that corrected delayed contractor revocations should keep results from later departures and evidence that the new workflow covers all included systems. Before expiry, the recertification audit evaluates continued conformity and effectiveness of the management system as a whole. Significant changes may require Stage 1 work. Schedule time for the audit, corrective actions and decision. ISO/IEC 17021-1:2015 §§9.1.3 and 9.6 · ANAB accreditation FAQ
During initial Stage 2, a certification body classifies the absence of internal audit and management review processes across the scoped ISMS as major nonconformities. What must happen before a positive certification decision?
Submit a plan for the missing processes and have the auditor issue the certificate before checking implementation.
Treat the findings as advisory because internal reviews take place separately from certification.
Exclude Clauses 9.2 and 9.3 from the scope statement and request an immediate decision.
Implement correction and corrective action, and provide evidence for the certification body to accept and verify before it makes the decision.
A SaaS provider handling sensitive records is drafting its Statement of Applicability. Engineering wants to drop two Annex A controls to save licensing costs and proposes an alternative technical design. What should the CISO do under Clause 6.1.3?
Identify necessary controls from treatment and applicable requirements, compare them with Annex A, and document inclusions, status and justified exclusions, including evidence for the alternatives.
Exclude the controls once the savings appear in the budget, without evaluating their risk treatment role.
Require implementation of each of the 93 Annex A controls exactly as written before considering any alternatives.
Keep the proposed safeguards out of the ISMS documentation because an alternative design does not use Annex A numbering.
A company received its initial ISMS certification 10 months ago after the certification body accepted a plan for a minor nonconformity in contractor access revocation. Its first external follow-up visit is scheduled within 12 months of the certification decision. What should the company prepare?
A full initial Stage 1 application because surveillance starts only after expiration.
Evidence for the first surveillance audit, including implementation and effectiveness of the corrective action and the current treatment of affected systems.
Proof of exactly one-third of Annex A controls, with the prior finding omitted from the file.
A report for the accreditation body to recertify the company without involving the certification body.
Sections you finish are checked off in the contents.