100+ Free WV Utilities Sewer and Water Practice Questions
Prepare for the West Virginia Utilities (Sewer and Water) Contractor Examination exam with instant access — no signup required.
Loading practice questions...
Explore More West Virginia Contractor Licensing Board Examinations
Continue into nearby exams from the same family. Each card keeps practice questions, study guides, flashcards, videos, and articles in one place.
Key Facts: WV Utilities Sewer and Water Exam
50 Q
Official Exam Questions
Prov WVCLB CIB 2026.05.07
70%
Passing Score
Prov WVCLB CIB 2026.05.07
3 hr
Time Allowed
Prov WVCLB CIB 2026.05.07
USD 59.95
Prov Exam Fee
Prov WVCLB CIB 2026.05.07
Open Book
Book Policy
Prov WVCLB CIB 2026.05.07
West Virginia Utilities (Sewer and Water) Contractor Examination is the official Board/Prov open-book exam: 50 questions, 70%, 3 hours, USD 59.95 (bulletin dated 2026.05.07). Official delivery is English.
Sample WV Utilities Sewer and Water Practice Questions
Try these sample questions to test your WV Utilities Sewer and Water exam readiness. Each question includes a detailed explanation. Start the interactive quiz above for the full 100+ question experience with AI tutoring.
1Before breaking ground for a private water or sewer trench in West Virginia, an excavator must notify the statewide one-call system (WV 811 / 811) at least how far in advance?
2Under IBC 2018 Section 1804.4, the ground immediately adjacent to a building foundation must be sloped away from the wall at not less than which rate for a minimum distance of 10 feet, unless an exception applies?
3IBC 2018 Section 1804.3 requires excavation backfill placed outside a foundation to be which of the following?
4On a new private utility corridor, clearing and grubbing is performed primarily to:
5Where silt fence is used for temporary sediment control along a utility trench corridor, standard practice is to install it:
6A sewer trench will pass beside an existing building footing. IBC 2018 Section 1804.1 requires which action before the excavation reduces vertical or lateral support for that foundation?
7Under the IBC 2018 Section 1804.6 exception, compacted fill 12 inches in depth or less that will support a shallow foundation may omit a project-specific geotechnical report only if the in-place dry density is at least:
8Before placing engineered fill or beginning trench excavation on a vegetated site, standard sitework practice is to:
9After a private water-service trench is restored next to a building, finished grade should be set so that:
10IBC 2018 Section 1803.5.4 requires a subsurface investigation to locate the groundwater table when the lowest floor is below adjacent finished ground and the water table may be:
About the WV Utilities Sewer and Water Exam
The West Virginia Utilities (Sewer and Water) Contractor Examination is the official Board trade examination administered by Prov. The official exam has 50 questions. Passing is 70% in 3 hours. The examination is open book. Prov lists USD 59.95 per attempt (West Virginia Contractor Licensing Board Candidate Information Bulletin dated 2026.05.07). The classification covers installation of water and sewer lines on private projects, including commercial and residential properties, plus work incidental to the installation. Candidates must also pass the Contractor Licensing Act examination. This bank is an English-language MCQ study adaptation. It does not replace required trade experience, Board approval, or the official examination.
Assessment
Open-book computer-based or paper-and-pencil multiple-choice. Official references: International Building Code 2018 and Study Guide for Utilities Contractors, 3rd edition (2024). Remote Examroom testing is available.
Time Limit
3 hours
Passing Score
70%
Exam Fee
USD 59.95 (Prov, Inc. (for the West Virginia Contractor Licensing Board))
WV Utilities Sewer and Water Exam Content Outline
Utilities Sitework
Utilities Sitework (8 official items)
Excavation
Excavation (9 official items)
Water Piping
Water Piping (9 official items)
Sewer Piping
Sewer Piping (8 official items)
Estimating and Plan Reading
Estimating and Plan Reading (9 official items)
Safety
Safety (7 official items)
How to Pass the WV Utilities Sewer and Water Exam
What You Need to Know
- Passing score: 70%
- Assessment: Open-book computer-based or paper-and-pencil multiple-choice. Official references: International Building Code 2018 and Study Guide for Utilities Contractors, 3rd edition (2024). Remote Examroom testing is available.
- Time limit: 3 hours
- Exam fee: USD 59.95
Keys to Passing
- Work through all 100 available questions
- Review every answer and explanation
- Track weak areas and revisit them
- Use our AI tutor for tough concepts
WV Utilities Sewer and Water Study Tips from Top Performers
Frequently Asked Questions
How many questions are on the West Virginia Utilities (Sewer and Water) Contractor Examination?
The official Prov examination has 50 questions. Passing is 70% within 3 hours (West Virginia Contractor Licensing Board Candidate Information Bulletin dated 2026.05.07).
How much does the West Virginia utilities contractor exam cost?
Prov lists USD 59.95 per attempt, including retakes. The Board charges a separate USD 90 annual contractor license fee under 28CSR2 §28-2-5.5 (effective May 4, 2026).
What work does a West Virginia Utilities (Sewer and Water) license cover?
The Board defines the classification as installation of water and sewer lines on private projects, including commercial and residential properties, plus work incidental to the installation.
Do I also need the Contractor Licensing Act exam?
Yes. The Board requires every contractor license applicant to pass the Contractor Licensing Act examination in addition to any applicable trade classification examination.