A large slab or pavement placement is scheduled on a hot, dry, windy day. Using the ACI 305 hot-weather evaporation nomograph, at approximately what surface evaporation rate should the crew add fogging, evaporation retarder, windbreaks, or other plastic-shrinkage protection for concrete with normal bleeding?
- A0.02 pound per square foot per hour
- B0.2 pound per square foot per hour
- C2.0 pounds per square foot per hour
- D20 pounds per square foot per hour