100+ Free NV C-21G Industrial Piping Practice Questions
Prepare for the Nevada C-21G Industrial Piping Contractor Examination exam with instant access — no signup required.
Loading practice questions...
Explore More Nevada NSCB Contractor Examinations
Continue into nearby exams from the same family. Each card keeps practice questions, study guides, flashcards, videos, and articles in one place.
Key Facts: NV C-21G Industrial Piping Exam
50 Q
Official Exam Questions
PSI Nevada Contractor CIB updated 3/25/2026
37 of 50 points
Passing Score
PSI Nevada Contractor CIB updated 3/25/2026
2 hours
Time Allowed
PSI Nevada Contractor CIB updated 3/25/2026
USD 95
PSI Exam Fee (one portion)
PSI Nevada Contractor CIB updated 3/25/2026
Open Book
Book Policy
PSI Nevada Contractor CIB updated 3/25/2026
Nevada C-21G Industrial Piping Contractor Examination is the official NSCB/PSI open book exam: 50 questions, 37 of 50 points, 2 hours, USD 95 (bulletin 270, updated 3/25/2026). Official delivery: English.
Sample NV C-21G Industrial Piping Practice Questions
Try these sample questions to test your NV C-21G Industrial Piping exam readiness. Each question includes a detailed explanation. Start the interactive quiz above for the full 100+ question experience with AI tutoring.
1Threaded steel joints on C-21G industrial water, steam, and fuel-gas piping under the 2018 UPC/UMC shall be made with:
2A C-21G crew finds a pair of 4-inch raised-face flanges 3/8 inch out of parallel. The correct way to close the joint is to:
3A roll-grooved or cut-grooved mechanical coupling on C-21G industrial water or process pipe is acceptable only when:
4A 45-degree offset on a C-21G industrial chilled-water line must rise 18 inches center-to-center. The travel (center-to-center length of the offset piece) is closest to:
5A 4-inch Schedule 40 C-21G process-water spool uses two long-radius 90-degree elbows. The required center-to-center distance between elbow centers is 60 inches. Using a long-radius takeout of 6 inches per 4-inch 90 (1.5 × NPS), the cut length of the straight pipe between the two welds is:
6Two 2-inch long-radius 45-degree elbows make a C-21G offset whose travel is 24 inches center-to-center. Using a 45-degree takeout of 1-1/4 inches (5/8 × NPS), the cut length of the offset nipple between weld bevels is:
7A grooved coupling on a C-21G food-process water line will see hot caustic CIP at about 180°F. The gasket shall be:
8A 3-inch C-21G industrial water header needs a 1-inch branch. The preferred fitting, rather than a bushing screwed into a 3-inch tee, is:
9A C-21G rolling offset must clear a duct: 12 inches of rise and 9 inches of roll, made with two 45-degree elbows. The travel of the offset piece is closest to:
10A 5-inch long-radius 90 has a 7-1/2 inch takeout (1.5 × NPS). Two of those 90s are to be welded to a C-21G steam jumper whose finished center-to-center is 80 inches. The cut length of the jumper pipe is:
About the NV C-21G Industrial Piping Exam
The Nevada C-21G Industrial Piping Contractor Examination is the official Nevada State Contractors Board trade examination administered by PSI Services LLC. The official exam has 50 scored questions. Passing is 37 of 50 points in 2 hours. The examination is open book. Uniform Plumbing Code, 2018 and Uniform Mechanical Code, 2018 (allowed in center). PSI lists USD 95 for one examination portion and USD 140 if taken with CMS; otherwise USD 95 per trade exam (Candidate Information Bulletin 270, updated 3/25/2026). NSCB requires a separate CMS examination for most new applicants, plus a USD 300 application fee and a USD 600 biennial license fee. This English-language MCQ bank is a study aid, not an official PSI form. It does not replace required trade experience, board approval, fingerprints, bonding, or the official examination.
Assessment
Open Book computer-based multiple-choice. Uniform Plumbing Code, 2018 and Uniform Mechanical Code, 2018 (allowed in center)
Time Limit
2 hours
Passing Score
37 of 50 points
Exam Fee
USD 95 (PSI Services LLC (for the Nevada State Contractors Board))
NV C-21G Industrial Piping Exam Content Outline
Pipe Fitting
Pipe Fitting (5 items)
Piping Materials
Piping Materials (7 items)
Process Piping
Process Piping (6 items)
Gas Piping
Gas Piping (6 items)
Water and Steam Piping
Water and Steam Piping (5 items)
Refrigerant Piping
Refrigerant Piping (5 items)
Hangers and Supports
Hangers and Supports (6 items)
Estimating and Plan Reading
Estimating and Plan Reading (3 items)
Welding
Welding (3 items)
Safety
Safety (4 items)
How to Pass the NV C-21G Industrial Piping Exam
What You Need to Know
- Passing score: 37 of 50 points
- Assessment: Open Book computer-based multiple-choice. Uniform Plumbing Code, 2018 and Uniform Mechanical Code, 2018 (allowed in center)
- Time limit: 2 hours
- Exam fee: USD 95
Keys to Passing
- Work through all 100 available questions
- Review every answer and explanation
- Track weak areas and revisit them
- Use our AI tutor for tough concepts
NV C-21G Industrial Piping Study Tips from Top Performers
Frequently Asked Questions
How many questions are on the Nevada C-21G Industrial Piping Contractor Examination?
The official PSI examination has 50 scored questions. Passing is 37 of 50 points within 2 hours (Candidate Information Bulletin 270, updated 3/25/2026).
How much does the NV C-21G exam cost?
PSI lists USD 95 for one examination portion. Two portions cost USD 140 only if the second portion is CMS. NSCB charges a separate USD 300 application fee and USD 600 biennial license fee.
Is the NV C-21G exam open book?
Yes. PSI lists this examination as open book. Uniform Plumbing Code, 2018 and Uniform Mechanical Code, 2018 (allowed in center)
Do I still need the CMS examination?
CMS is the required Nevada business-and-law examination. Most new applicants must pass CMS and a trade examination for the requested classification. In most cases you will not retake an exam if you have actively served as a qualified employee in the same classification within the last four years.