Free Practice Questions for MS T&D Lines
Exam-style questions and explanations by OpenExamPrep.
Loading practice questions...
Explore More Mississippi Contractor Licensing Examinations
Continue into nearby exams from the same family. Each card keeps practice questions, study guides, flashcards, videos, and articles in one place.
Key Facts: MS T&D Lines Exam
70%
Passing Score
PSI MS Contractor Bulletin 4/23/2026
50 Q
Official Exam Questions
PSI MS Contractor Bulletin 4/23/2026
2 hours
Time Allowed
PSI MS Contractor Bulletin 4/23/2026
$120
PSI Exam Fee
PSI MS Contractor Bulletin 4/23/2026
Open book
Exam Format
PSI MS Contractor Bulletin 4/23/2026
MS Transmission/Distribution Lines PSI trade exam: 50 questions, 70% pass, 2 hours, fee $120. Open-book MSBOC classification (bulletin 4/23/2026).
Sample MS T&D Lines Practice Questions
Try these sample questions to review concepts for the MS T&D Lines exam. Each question includes a detailed explanation. Start the interactive quiz above for the full 100+ question experience with AI tutoring.
1A 25 kVA single-phase pole-mount transformer is fully loaded on a 240 V secondary. What is the approximate full-load secondary current?
2What is the defining feature of a completely self-protected (CSP) overhead distribution transformer?
3Compared with a pole-mount distribution transformer, a pad-mount transformer is typically selected when:
4The kVA rating on a distribution transformer nameplate is a rating of:
5Why is a wye-connected secondary preferred on a multi-grounded four-wire distribution system?
6A single-phase transformer is rated 7200 V primary and 240 V secondary. If the primary winding has 1,800 turns, how many secondary turns are required for the same volts-per-turn?
7On a conventional (non-CSP) pole-mount transformer, the primary fused cutout is installed mainly to:
8Before paralleling two single-phase distribution transformers on the same secondary, a line crew must verify that the units have matching:
9A no-load tap changer on a distribution transformer is intended to be operated:
10Three 25 kVA single-phase transformers are banked wye-wye to serve a 480 Y / 277 V three-phase load. What is the approximate full-load secondary line current of the bank?
About the MS T&D Lines Exam
Mississippi Transmission and Distribution Lines is an MSBOC specialty classification trade examination administered by PSI. Official scope is underground and overhead electrical transmission lines, including poles, guys, towers, street and outdoor lighting of all voltages, underground ducts, transformers, circuit breakers, capacitors, primary metering, and related equipment. The official open-book exam has 50 questions, a 70% passing standard, and 2 hours allowed. PSI fee is $120 per portion (Candidate Information Bulletin updated 4/23/2026). This English-language MCQ bank is a study aid for the official content outline; it is not an official PSI form, does not replace the required Law and Business Management exam, and is not a substitute for MSBOC application review or the official open-book examination.
Exam sponsor: PSI Services LLC (for Mississippi State Board of Contractors). The requirements and fees below concern the certification or admission exam, separate from our free practice resources.
Questions
50 questions
Time Limit
2 hours
Passing Score
70%
Fees, eligibility, and exam policies can change. Confirm them with the exam sponsor before applying or paying.
Our practice resources: topics covered
We aim to reflect publicly available exam outlines and topic information in our study resources. Coverage, format, and difficulty may differ from the actual exam, and we cannot guarantee that every detail is accurate or current. Confirm exam requirements, fees, and policies with the official exam sponsor.
Transformers
Pole-mount, pad-mount, and substation transformer application
Electrical Knowledge
Basic electrical theory used on supply systems
Conductors
Overhead and underground conductor selection and sag
Overhead Lines
Overhead construction, clearances, and hardware
Underground Lines
URD cable, ducts, and underground construction
Equipment and Safety
OSHA 1926 and line-work safety
Grounding Methods
NESC grounding of supply systems
Service Drops and Laterals
Overhead drops and underground laterals
Poles and Structures
Poles, towers, guys, and structures
Electric Supply Stations
NESC supply-station rules
Preparing for the MS T&D Lines Exam
What You Need to Know
- Passing score: 70%
- Exam length: 50 questions
- Time limit: 2 hours
- Exam / certification fees: $120 Official sources
Using Our Practice Resources
- Work through all 100 available questions
- Review every answer and explanation
- Track weak areas and revisit them
- Use our AI tutor for tough concepts
MS T&D Lines: Suggested Study Strategy
Frequently Asked Questions
How many questions are on the MS Transmission/Distribution Lines exam?
The official PSI examination has 50 scored questions (plus possible unscored experimental items). Passing is 70% within 2 hours.
How much does the MS T&D Lines exam cost?
PSI lists $120 per examination portion (Candidate Information Bulletin updated 4/23/2026). MSBOC application fees are separate: $400 commercial or $50 residential. Additional classifications are $100 each.
Is the Mississippi contractor exam open book?
Yes. PSI administers MSBOC classification exams as open book. Only bulletin-listed approved references are allowed; temporary tabs such as Post-it notes are prohibited.
Do I still need the Law and Business Management exam?
Yes. MSBOC requires the Mississippi Law and Business Management exam (50 questions, 70%, 2 hours) of all applicants. Reciprocity may waive a trade exam in some cases but does not waive Law and Business.