Under the NESC, overhead supply-line clearances to ground, roads, and buildings generally:
- AStay the same at every voltage so one number can be memorized for all lines
- BIncrease as voltage increases and are selected from NESC tables for the crossing involved
- CAre taken from the NEC dwelling-service tables and applied unchanged to 230 kV lines
- DApply only inside a fenced supply station