Key Facts: CPCS Appointed Person Exam
50 questions
CPCS A61 Technical Theory Test Length
NOCN CPCS Scheme Rules
80%
Minimum Passing Score
CPCS A61 Syllabus
20% derate
Standard BS 7121 Tandem Lift Capacity Reduction
BS 7121-1 Code of Practice
5 years
CPCS Card Validity Period
NOCN Job Cards Scheme
9m / 15m
GS6 Overhead Power Line Exclusion Zones
HSE Guidance Note GS6
CPCS A61 Appointed Person for Lifting Operations is the mandatory UK qualification for planning and managing crane lifts under BS 7121 and LOLER 1998. Candidates must demonstrate total mastery over lift classification (basic, intermediate, complex), ground bearing capacity and outrigger mat sizing (P = Load / Area), tandem lifting derating (20% capacity reduction), proximity hazards (HSE GS6 overhead power line clearances), and supervisory delegation. This 100-question practice bank provides comprehensive preparation for NOCN/CPCS A61 candidates.
Sample CPCS Appointed Person Practice Questions
Try these sample questions to test your CPCS Appointed Person exam readiness. Each question includes a detailed explanation. Start the interactive quiz above for the full 100+ question experience with AI tutoring.
1Under BS 7121-1:2016, who holds overall technical responsibility for the safe planning, organization, and execution of a lifting operation?
2BS 7121 categorizes lifting operations into three complexity levels. Which category applies to a standard lift using a single mobile crane over clear ground with a known load weight?
3When an Appointed Person delegates the physical site supervision of a lifting operation to a Crane Supervisor, what legal/technical responsibility does the AP retain?
4According to BS 7121, what action MUST be taken if wind speeds on site reach the maximum operating limit specified by the crane manufacturer?
5Under BS 7121-3 for mobile cranes, what condition must be met regarding outrigger beams before a lift commences on outriggers?
6BS 7121-5 governs tower cranes. Which factor is critical when calculating foundation loadings for a free-standing tower crane under storm conditions?
7In the UK construction industry, what distinguishes a 'Contract Lift' from a standard 'CPA Crane Hire' agreement?
8Under BS 7121, what document must be compiled by the Appointed Person prior to any lifting operation taking place on site?
9What is the primary purpose of conducting a pre-lift briefing (Toolbox Talk) with the lifting team on site?
10For a long-term construction project with repetitive lifting operations, when MUST the Appointed Person re-evaluate and update the Lift Plan?
About the CPCS Appointed Person Exam
The CPCS A61 Appointed Person qualification is the premier UK credential for individuals tasked with planning, managing, and authorizing crane lifting operations on construction sites and industrial facilities. Under BS 7121 and the Lifting Operations and Lifting Equipment Regulations 1998 (LOLER), the Appointed Person holds full technical responsibility for producing risk assessments, method statements, crane selection, ground bearing capacity verification, outrigger pad sizing calculations, and team duty allocations.
Questions
50 scored questions
Time Limit
1 hour 15 minutes
Passing Score
80%
Exam Fee
£80 - £150 depending on test centre (NOCN Construction Plant Competence Scheme (CPCS))
CPCS Appointed Person Exam Content Outline
BS 7121 Code of Practice for Cranes
BS 7121 parts 1, 3, and 5 requirements, duties of the Appointed Person, categorisation of lifting operations, and statutory compliance.
LOLER 1998 Lifting Regulations
Lifting Operations and Lifting Equipment Regulations 1998, Regulation 8 planning, Regulation 9 thorough examination, and statutory documentation.
Lift Plan Preparation & Risk Assessment
Formulating method statements, risk assessments, load dimensions, center of gravity, environmental controls, and permit to lift issuing.
Crane Selection & Outrigger Loadings
Selecting mobile/crawler/tower cranes, analyzing duty charts, radius, boom length, counterweight configurations, and max outrigger loads.
Outrigger Mat Sizing Calculations
Ground bearing capacity assessment, calculating outrigger pressure (P = Force / Area), required mat surface area, and mat material selection.
Crane Supervisor & Slinger Roles
Supervisory duties on site, briefing lifting teams, slinger/signaller communication, standard hand signals, and stopping unsafe lifts.
Tandem & Complex Lifting Plans
Multi-crane lifting procedures, capacity derating (20% load reduction factor), load distribution calculations, and equalising beams.
Proximity Hazards & Derating Factors
Managing GS6 overhead power lines, underground services, excavations, wind speed limits, dynamic factors, and derating criteria.
How to Pass the CPCS Appointed Person Exam
What You Need to Know
- Passing score: 80%
- Exam length: 50 questions
- Time limit: 1 hour 15 minutes
- Exam fee: £80 - £150 depending on test centre
Keys to Passing
- Complete 500+ practice questions
- Score 80%+ consistently before scheduling
- Focus on highest-weighted sections
- Use our AI tutor for tough concepts
CPCS Appointed Person Study Tips from Top Performers
Frequently Asked Questions
What is the primary legal duty of the Appointed Person under LOLER 1998 Regulation 8?
Under LOLER 1998 Regulation 8, the Appointed Person is responsible for ensuring that every lifting operation is properly planned by a competent person, appropriately supervised, and carried out in a safe manner.
How is required outrigger mat area calculated for a mobile crane?
Required Mat Area (m²) = Maximum Outrigger Load (kN or tonnes) divided by the Allowable Ground Bearing Capacity (kN/m² or t/m²). For example, 300 kN outrigger load divided by 150 kN/m² ground capacity requires a minimum mat area of 2.0 m² (e.g. 1.42 m x 1.42 m mat).
What derating factor must be applied when planning a tandem lift with two mobile cranes?
According to BS 7121, a 20% capacity reduction (derating factor of 0.80) must be applied to the rated capacity of each crane involved in a tandem lift to account for load transfer, uneven sharing, and dynamic movement.
What is the minimum safe clearance distance from overhead power lines on wooden poles under HSE GS6 guidance?
Under HSE Guidance Note GS6, the minimum safe clearance distance from overhead power lines on wooden poles (up to 33kV) is 9 metres measured horizontally from the line position (or 15 metres for lines mounted on steel pylons/towers), unless isolated or protected by physical goalposts.
Can the Appointed Person delegate their duties to a Crane Supervisor?