In UK radio signalling protocols, what must the Slinger/Signaller state at the beginning of every radio transmission to the crane operator?
- AThe specific crane identification call sign and clear directional instruction.
- BThe current time and weather forecast.
- CThe site manager's full name and phone number.
- DThe weight of the crane base anchor.