100+ Free CPCS A47/A48 Piling Rig — Bored Practice Questions
Pass your CPCS A47/A48 Piling Rig — Bored (NOCN/CPCS, UK) exam on the first try — instant access, no signup required.
Loading practice questions...
Explore More UK CPCS Plant Operator Theory
Continue into nearby exams from the same family. Each card keeps practice questions, study guides, flashcards, videos, and articles in one place.
Key Facts: CPCS A47/A48 Piling Rig — Bored Exam
100 MCQ
Study Adaptation Questions
OpenExamPrep Practice Bank
75 Mins
Recommended Practice Duration
NOCN CPCS Theory Assessment Standard
80%
Pass Benchmark
NOCN CPCS Standard Criteria
FPS WPC
Mandatory Platform Sign-Off
Federation of Piling Specialists
HSG47
Underground Service Guidance
UK Health & Safety Executive
PUWER & LOLER
Statutory Safety Regulations
UK Statutory Instruments 1998
This is an English-language MCQ study adaptation for the official assessment; it does not replace required practical, oral, written, or hands-on performance. The CPCS A47/A48 Piling Rig Bored exam tests essential operator knowledge covering Kelly bar systems, CFA boring, FPS working platform certificates, pre-start checks, underground utility risks, and PUWER/LOLER statutory compliance.
Sample CPCS A47/A48 Piling Rig — Bored Practice Questions
Try these sample questions to test your CPCS A47/A48 Piling Rig — Bored exam readiness. Each question includes a detailed explanation. Start the interactive quiz above for the full 100+ question experience with AI tutoring.
1What is the primary function of a telescopic Kelly bar on a rotary bored piling rig?
2How does a mechanical locking Kelly bar differ from a friction Kelly bar during drilling operations?
3What component on a piling rig mast guides and supports the upper end of a telescopic Kelly bar?
4In Continuous Flight Auger (CFA) piling, what is the purpose of the hollow stem inside the auger flight?
5Why must the bottom cap (bung or flap) of a CFA auger open cleanly when concrete pumping commences?
6What is the primary document required under Federation of Piling Specialists (FPS) rules before a piling rig enters a site working area?
7Under FPS guidance, who holds primary responsibility for inspecting and maintaining the piling working platform in safe condition throughout the project?
8What pre-start check must be performed on the piling rig tracks before tracking across a working platform?
9Why is mast verticality alignment critical prior to commencing drilling of a bored pile?
10According to UK Health and Safety Executive guidance HSG47, what tool should be used first to locate buried electric cables before boring?
About the CPCS A47/A48 Piling Rig — Bored Exam
This is an English-language MCQ study adaptation for the official assessment; it does not replace required practical, oral, written, or hands-on performance. The UK CPCS A47/A48 Piling Rig Bored Theory Test assesses knowledge required for safe operation of rotary and Continuous Flight Auger (CFA) bored piling rigs under UK construction site rules.
Questions
100 scored questions
Time Limit
75 minutes
Passing Score
80%
Exam Fee
£280 - £450 (NOCN Job Cards / Construction Plant Competence Scheme (CPCS))
CPCS A47/A48 Piling Rig — Bored Exam Content Outline
Piling Rig Components and Kelly Bars
Telescopic Kelly bar locking mechanisms, rotary drives, auger cleaners, mast elevation, winch drums, and hydraulic interlocks.
Bored Piling Techniques (CFA & Rotary)
Continuous Flight Auger (CFA) boring, flight auger extraction, concrete pumping, rotary drilling, support fluids (bentonite/polymer), and casing installation.
Working Platforms (FPS Guidance)
Federation of Piling Specialists (FPS) Working Platform Certificate (WPC), ground bearing capacity, track ground pressure, and platform maintenance.
Pre-Start Checks and Stability
Daily pre-use inspections, track tension, counterweight configuration, mast verticality/inclination, centre of gravity, and slope travel.
Underground Services and Ground Conditions
HSG47 underground service avoidance, CAT and Genny detection, trial holes, soft ground hazards, unexploded ordnance (UXO), and soil collapse risks.
Concrete Placing and Casing Handling
Tremie pipe concrete placement, over-supply pressure monitoring, casing oscillator/twister operation, temporary vs permanent casings, and reinforcement cage insertion.
Winching and Rig Erection Safety
Auxiliary winch operation, rope spooling, mast rigging/derigging procedures, overhead obstruction clearances, and exclusion zones.
Plant Safety and LOLER / PUWER Regulations
Provision and Use of Work Equipment Regulations 1998 (PUWER), Lifting Operations and Lifting Equipment Regulations 1998 (LOLER), Thorough Examinations, and operator legal duties.
How to Pass the CPCS A47/A48 Piling Rig — Bored Exam
What You Need to Know
- Passing score: 80%
- Exam length: 100 questions
- Time limit: 75 minutes
- Exam fee: £280 - £450
Keys to Passing
- Complete 500+ practice questions
- Score 80%+ consistently before scheduling
- Focus on highest-weighted sections
- Use our AI tutor for tough concepts
CPCS A47/A48 Piling Rig — Bored Study Tips from Top Performers
Frequently Asked Questions
What is the difference between CPCS A47 and A48 Piling Rig categories?
CPCS A47 covers Piling Rig Bored above 20 tonnes or general bored piling rigs, while A48 covers Piling Rig Driven / smaller categories depending on capacity; both share core bored piling operational and safety principles under NOCN CPCS standards.
What is a Working Platform Certificate (WPC) and why is it mandatory for piling operations?
The FPS Working Platform Certificate (WPC) is a written declaration signed by the Principal Contractor confirming that the piling working platform has been designed, constructed, and maintained to support the heavy track ground bearing pressures of piling rigs and auxiliary equipment without risk of collapse.
How does Continuous Flight Auger (CFA) piling differ from standard rotary bored piling?
CFA piling drills a hollow-stem auger to design depth in a single continuous process and pumps concrete through the hollow stem under pressure as the auger is extracted, followed by placing reinforcement. Rotary piling uses telescopic Kelly bars and interchangeable tools (buckets/augers), often requiring temporary casings or support fluids like bentonite to keep the borehole open before placing concrete via tremie pipe.
What are the key legal duties of a piling rig operator under PUWER 98 and LOLER 98?
Under PUWER 98, operators must conduct daily pre-use safety checks, operate equipment safely, and report defects immediately. Under LOLER 98, any lifting operation (e.g., handling casings, augers, reinforcement cages, or tremie pipes with auxiliary winches) must be properly planned, supervised, carried out safely using certified equipment with valid Thorough Examination certificates.
What steps must be taken if underground services are suspected near the piling location?
Operators and site teams must reference utility drawings, conduct cable avoidance tool (CAT and Genny) scans, dig hand-dug trial holes to expose utilities, maintain safe clearance distances according to HSG47, and obtain written authorization before boring.