Key Facts: Iran Nezam Mechanical Supervision Exam Exam
60 Questions
Total Questions
INBR / MRUD
150 minutes
Time Limit
INBR
50 / 100
Passing Threshold (clause 6-4, 1405 instruction)
INBR
3 wrong = 1 right
Negative Marking Rule
INBR
Open-Book
Exam Delivery Mode
INBR
Grade 3
Initial License Grade Awarded
IRCEO
The Iran Nezam Mechanical Supervision examination is a 150-minute open-book paper of 60 four-option multiple-choice questions, held nationwide under the Office of National Building Regulations. It assesses a mechanical engineer's supervisory duties, plumbing and gas piping pressure testing, HVAC equipment installation inspections, and jobsite safety. Negative marking applies and the pass threshold is 50 out of 100. The official paper is in Persian; OpenExamPrep provides independent English-language practice questions for the same topics.
Sample Iran Nezam Mechanical Supervision Exam Practice Questions
Try these sample questions to review concepts for the Iran Nezam Mechanical Supervision Exam exam. Each question includes a detailed explanation. Start the interactive quiz above for the full 100+ question experience with AI tutoring.
1Under INBR Topic 17, newly installed low-pressure (1/4 psi) building gas piping must pass a leak-tightness test (آزمایش نشتی) after the strength test. What test pressure and minimum holding duration must the supervising engineer witness for that leak test?
2When inspecting the calibrated pressure gauge used for the 10 psi pneumatic strength test of building gas piping under INBR Topic 17, which gauge specification is mandatory?
3Under INBR Topic 17, which medium is strictly prohibited for use in the pneumatic pressure testing of building natural gas piping?
4During the final leak detection check of all accessible gas pipe joints under test pressure, which method must the supervising engineer insist upon according to INBR Topic 17?
5When performing visual inspection of circumferential butt welds on black steel natural gas piping under INBR Topic 17, which defect requires immediate rejection of the weld?
6Which material and application rule is mandatory for threaded joint sealants on low-pressure natural gas piping under INBR Topic 17?
7For underground steel gas piping or gas pipe embedded in floor masonry, what external corrosion protection system must the supervising mechanical engineer verify under INBR Topic 17?
8Prior to backfilling an underground steel gas pipe wrapped with anti-corrosion tape, which testing method is used by the supervisor to detect microscopic pinholes or voids (holidays) in the coating?
9What is the mandatory surface identification requirement for exposed indoor natural gas piping under INBR Topic 17?
10When a gas pipe penetrates an interior concrete foundation wall or concrete floor slab, what sleeve specification must the supervising engineer enforce under INBR Topic 17?
About the Iran Nezam Mechanical Supervision Exam Exam
The Iran Nezam Mechanical Supervision exam is the official licensure assessment administered by the Ministry of Roads and Urban Development for mechanical engineers seeking the supervision (Nezarat) practicing grade in the Construction Engineering Organization of Iran. Supervising mechanical engineers verify that building HVAC installations, plumbing and drainage systems, natural gas distribution networks, fire suppression systems, and mechanical safety mechanisms strictly comply with approved engineering drawings and the Iranian National Building Regulations (INBR).
Exam sponsor: Office of National Building Regulations and Building Control (inbr.ir), Ministry of Roads and Urban Development; delivered nationwide by the National Organization for Educational Testing (Sazman-e Sanjesh) educational services company. The requirements and fees below concern the certification or admission exam, separate from our free practice resources.
Assessment
60 four-option multiple-choice questions covering natural gas supervision (Topic 17), plumbing testing (Topic 16), HVAC inspection (Topic 14), supervisory procedures (Topic 2), and fire protection/safety (Topics 3, 12)
Time Limit
150 minutes
Passing Score
50 out of 100 (50%) — clause 6-4 of the official 1405 registration instruction, calculated after the negative-marking deduction
Exam / Certification Fees
Set per sitting and shown in the inbr.ir registration cart; the official 1405 registration instruction does not publish a fixed amount
Exam sponsor websiteFees, eligibility, and exam policies can change. Confirm them with the exam sponsor before applying or paying.
Our practice resources: topics covered
We aim to reflect publicly available exam outlines and topic information in our study resources. Coverage, format, and difficulty may differ from the actual exam, and we cannot guarantee that every detail is accurate or current. Confirm exam requirements, fees, and policies with the official exam sponsor.
Natural Gas Piping & Flue Inspection (INBR Topic 17)
Pneumatic strength and tightness testing of gas piping, pipe joint welding and threading inspection, primer and anti-corrosion wrap, yellow identification paint, pipe sleeve penetration details, combustion air openings, and chimney flue clearances and draft tests
Plumbing & Drainage Testing (INBR Topic 16)
Hydrostatic testing of potable water supply piping (minimum 10 bar or 1.5 times working pressure), gravity drainage water testing (3 m head) and air/smoke testing, drain pipe slope verification, cleanout locations and access clearances, trap seal depths, backflow prevention assemblies, and sanitary fixture mounting
HVAC Equipment & Duct Inspection (INBR Topic 14)
Mounting of chillers, boilers, and cooling towers, vibration isolation springs and pads, expansion tank connection and relief piping, sheet metal duct gauges and support hanger spacing, flexible duct connectors, fire and smoke dampers, fusible link ratings, duct inspection doors, and air and hydronic water balancing
Supervisory Procedures & Legal Duties (INBR Topics 1 & 2)
Statutory duties under INBR Topic 2 and Article 34 of the Construction Engineering Law, mandatory stage inspection reports, defect notifications, formal municipal stop-work notices, technical coordination with civil and electrical supervisors, and civil and criminal liability of the supervising engineer
Fire Suppression & Jobsite Safety (INBR Topics 3 & 12)
Automatic fire sprinkler installation inspection, sprinkler head clearance from ceilings and obstacles, hydrostatic testing of fire piping (200 psi / 14 bar for 2 hours), Siamese fire department connection checks, standpipe hose valves, boiler room explosion venting, pressure relief valve discharge piping, and confined space safety
Preparing for the Iran Nezam Mechanical Supervision Exam Exam
What You Need to Know
- Passing score: 50 out of 100 (50%) — clause 6-4 of the official 1405 registration instruction, calculated after the negative-marking deduction
- Assessment: 60 four-option multiple-choice questions covering natural gas supervision (Topic 17), plumbing testing (Topic 16), HVAC inspection (Topic 14), supervisory procedures (Topic 2), and fire protection/safety (Topics 3, 12)
- Time limit: 150 minutes
- Exam / certification fees: Set per sitting and shown in the inbr.ir registration cart; the official 1405 registration instruction does not publish a fixed amount Official sources
Using Our Practice Resources
- Work through all 100 available questions
- Review every answer and explanation
- Track weak areas and revisit them
- Use our AI tutor for tough concepts
Iran Nezam Mechanical Supervision Exam: Suggested Study Strategy
Frequently Asked Questions
What is the format of the Iran Nezam Mechanical Supervision exam?
The examination consists of 60 four-option multiple-choice questions to be completed in 150 minutes. Under clause 6-2 of the official registration instruction, the test is held open book (کتابباز), allowing candidates to consult INBR volumes, technical charts, and personal reference binders. Negative marking applies: three incorrect answers cancel one correct answer. The official paper is in Persian.
What passing score is required for the Mechanical Supervision exam?
Clause 6-4 of the official registration instruction establishes the passing threshold at 50 out of 100 (50%). Because of the negative marking rule (1/3 point deducted per wrong answer), candidates must achieve a net score of at least 50%. A passing score remains valid for up to 3 years toward obtaining the Grade 3 (Payeh 3) practicing license from the provincial Construction Engineering Organization.
What are the eligibility requirements for this exam?
Candidates must hold an accredited Bachelor's, Master's, or Ph.D. degree in Mechanical Engineering recognized by the Ministry of Science, Research and Technology. A mandatory minimum post-graduation practical experience period is required: 3 years for Bachelor's holders, 2 years for Master's holders, and 1 year for Ph.D. graduates, along with provincial Nezam membership and military completion or exemption for males.
Which National Building Regulations (INBR) are covered in the mechanical supervision syllabus?
The core topics include Topic 14 (Mechanical Installations / HVAC), Topic 16 (Sanitary and Plumbing Installations), Topic 17 (Natural Gas Piping for Buildings), Topic 3 (Fire Protection and Life Safety), Topic 12 (Jobsite Safety and Worker Health), Topic 19 (Energy Conservation in Buildings), Topic 2 (Administrative Systems and Supervisory Duties), Topic 22 (Care and Maintenance of Building Systems), and Publication 128 (General Technical Specifications for Mechanical Installations).
What are the key inspection stages for a supervising mechanical engineer on a building project?
The supervising mechanical engineer must inspect and file mandatory reports at key milestones: underground drainage piping before backfilling; rough-in plumbing and gas piping prior to concealment/wall closing (including pneumatic and hydrostatic pressure tests); HVAC ductwork and damper installation before ceiling closure; boiler room and central plant equipment mounting and venting; fire protection system hydrostatic testing; and final commissioning, balancing, and fixture testing before occupancy certification.