Free Practice Questions for Iran Nezam Civil Execution Exam
Exam-style questions and explanations by OpenExamPrep.
Loading practice questions...
Explore More Iran Construction Engineering Org (IRCEO / Nezam Mohandesi)
Continue into nearby exams from the same family. Each card keeps practice questions, study guides, flashcards, videos, and articles in one place.
Key Facts: Iran Nezam Civil Execution Exam Exam
Total Questions (Official Exam)
Exam Duration
Exam Format
Passing Score
Licensure Grade
Administering Authority
Pass the Iran Nezam Civil Execution licensure exam with our 100-question practice bank. Features 60-question 150-minute exam simulation, open-book reference tips, 1/3 negative marking penalties, and rigorous coverage of INBR Topics 7, 9, 10, 12, and Nashriyeh 4311. Independent English adaptation.
Sample Iran Nezam Civil Execution Exam Practice Questions
Try these sample questions to review concepts for the Iran Nezam Civil Execution Exam exam. Each question includes a detailed explanation. Start the interactive quiz above for the full 100+ question experience with AI tutoring.
1According to INBR Topic 12 (Safety and Work Protection During Execution), what is the mandatory minimum height for the top guardrail of standard perimeter edge protection on elevated construction work platforms?
2Under INBR Topic 12, what is the minimum required vertical height of a toe-board (قرقره or تخته پنجه) installed along the open sides of scaffolding and work platforms to prevent tools and materials from falling?
3When setting up portable straight or extension ladders on a jobsite in accordance with INBR Topic 12, what is the correct slope ratio (horizontal distance from the wall to vertical working height)?
4According to INBR Topic 12, how far must the side rails of an access ladder extend above the landing platform or floor level being accessed when no alternate hand-grab is provided?
5Under INBR Topic 12, what is the minimum safe horizontal clearance distance that mobile cranes, hoists, and scaffolding must maintain from overhead electrical power lines carrying a voltage of up to 20 kV?
6According to INBR Topic 12, what is the minimum nominal width of a working platform (تخته یا سکوی کار) on tubular steel scaffolding intended for general masonry and bricklaying work?
7What is the maximum allowable thickness of timber planks (تختههای زیرپایی) used on scaffolding platforms according to INBR Topic 12, and what is their minimum thickness when supported on transoms spaced 1.5 m apart?
8Under INBR Topic 12, scaffold planks resting on supports must overlap each other by at least how much distance, unless they are firmly secured or locked in place to prevent tipping?
9At what working height above the ground or floor level does INBR Topic 12 make the use of personal fall arrest systems (safety harnesses, lifelines, or safety nets) mandatory for workers exposed to open fall hazards?
10In construction excavation works under INBR Topic 12, what is the minimum clearance distance that excavated spoil (خاک حاصل از گودبرداری) and heavy machinery must maintain from the edge of the excavation crest?
About the Iran Nezam Civil Execution Exam Exam
The Iran Construction Engineering Organization (IRCEO / Nezam Mohandesi) Civil Execution Licensure Examination (آزمون ورود به حرفه مهندسان عمران - صلاحیت اجرا) is the official statutory licensing exam required for civil engineers to obtain the Grade 3 practicing license (پروانه اشتغال به کار مهندسی پایه ۳) in construction execution. Administered under the auspices of the Office of National Building Regulations and Building Control (دفتر مقررات ملی و کنترل ساختمان) within the Ministry of Roads and Urban Development, the exam tests real-world jobsite management, scaffolding safety, trench shoring, concrete mix batching and placement, rebar fabrication, formwork stripping, structural steel welding and bolting tolerances, and Iranian public works contract administration (نشریه ۴۳۱۱). This question bank provides an independent English-language practice adaptation.
Exam sponsor: Office of National Building Regulations and Building Control (inbr.ir), Ministry of Roads and Urban Development; delivered nationwide by the National Organization for Educational Testing (Sazman-e Sanjesh) educational services company. The requirements and fees below concern the certification or admission exam, separate from our free practice resources.
Assessment
60 four-option multiple-choice questions covering site safety (Topic 12), concrete and steel construction execution (Topics 9, 10), excavation/shoring (Topic 7), and Iranian Conditions of Contract
Time Limit
150 minutes
Passing Score
50 out of 100 (50%) — clause 6-4 of the official 1405 registration instruction, calculated after the negative-marking deduction
Exam / Certification Fees
Set per sitting and shown in the inbr.ir registration cart; the official 1405 registration instruction does not publish a fixed amount
Exam sponsor websiteFees, eligibility, and exam policies can change. Confirm them with the exam sponsor before applying or paying.
Our practice resources: topics covered
We aim to reflect publicly available exam outlines and topic information in our study resources. Coverage, format, and difficulty may differ from the actual exam, and we cannot guarantee that every detail is accurate or current. Confirm exam requirements, fees, and policies with the official exam sponsor.
Construction Site Safety & Protection (Topic 12)
Safety responsibilities of the site supervisor and execution engineer, scaffolding types and inspection, ladder slope and anchoring, perimeter guardrails and toe boards, safety nets and personal fall arrest systems (PFAS), excavation and trench safety, crane hoisting protocols, jobsite electrical grounding and temporary power boards.
Concrete Construction Execution (Topic 9)
Batching tolerances, transit mixer transit and agitation limits, slump and workability testing, concrete placement and compaction, construction joints, hot and cold weather concreting protocols, curing methods and minimum curing durations, formwork removal times and reshoring, rebar bending, spacing, concrete cover, mechanical couplers, and compressive strength acceptance criteria.
Steel Construction Execution (Topic 10)
Structural steel fabrication and erection, column base plate levelling and non-shrink grouting, anchor bolt tolerances, welding processes (SMAW, GMAW, FCAW, SAW), preheat and interpass temperatures, weld visual and non-destructive testing (VT, PT, MT, UT, RT), high-strength bolt pre-tensioning methods (calibrated wrench, turn-of-nut, twist-off bolts), and erection plumbness tolerances.
Deep Excavation & Shoring (Topic 7)
Geotechnical investigation requirements, hazard classification of excavations, shoring systems (soldier piles with lagging, Berlin wall, soil nailing, prestressed ground anchors, internal strutting, diaphragm walls), adjacent building settlement monitoring and instrumentation, ground dewatering, and daily safety checklist compliance.
Contract Administration & Site Operations (Conditions of Contract)
General Conditions of Construction Contracts (نشریه ۴۳۱۱ - شرایط عمومی پیمان), roles and obligations of Employer, Consultant, Contractor, and Workshop Head (سرپرست کارگاه), master work schedules, interim payment certificates (صورتوضعیت موقت), price escalation adjustments (تعدیل آحاد بها), variation orders (تغییر مقادیر کار), temporary and final acceptance (تحویل موقت و قطعی), defect liability, and contract termination vs. cancellation (Articles 46 and 48).
Preparing for the Iran Nezam Civil Execution Exam Exam
What You Need to Know
- Passing score: 50 out of 100 (50%) — clause 6-4 of the official 1405 registration instruction, calculated after the negative-marking deduction
- Assessment: 60 four-option multiple-choice questions covering site safety (Topic 12), concrete and steel construction execution (Topics 9, 10), excavation/shoring (Topic 7), and Iranian Conditions of Contract
- Time limit: 150 minutes
- Exam / certification fees: Set per sitting and shown in the inbr.ir registration cart; the official 1405 registration instruction does not publish a fixed amount Official sources
Using Our Practice Resources
- Work through all 100 available questions
- Review every answer and explanation
- Track weak areas and revisit them
- Use our AI tutor for tough concepts
Iran Nezam Civil Execution Exam: Suggested Study Strategy
Frequently Asked Questions
What is the structure and duration of the Iran Nezam Civil Execution exam?
The official exam consists of 60 four-option multiple-choice questions administered over 150 minutes (2.5 minutes per question). The examination is conducted in an open-book (کتابباز) format, allowing candidates to bring physical copies of the Iranian National Building Regulations (مباحث مقررات ملی ساختمان), standard publications such as Nashriyeh 4311, and approved reference handbooks into the examination hall.
How does negative marking work in the Nezam Mohandesi licensure exam?
The exam applies a 1/3 negative marking rule (نمره منفی): each correct answer awards 1 full mark (+1.00), while each incorrect answer deducts 1/3 of a mark (-0.333). Unanswered questions receive 0 marks. To achieve the 50% passing threshold (30 net points out of 60), candidates must manage risk carefully and avoid random guessing.
What are the eligibility requirements for the Civil Execution licensure exam?
Candidates must hold an accredited Bachelor's degree (B.Sc.), Master's degree (M.Sc.), or Doctorate (Ph.D.) in Civil Engineering. Candidates must have accumulated at least 3 years of verified post-graduation practical work experience for a Bachelor's degree, 2 years for a Master's degree, or 1 year for a Ph.D. In addition, candidates must complete mandatory technical preparation courses and obtain a workshop safety (HSE) certificate.
What is the difference between Civil Supervision (نظارت) and Civil Execution (اجرا)?
Civil Supervision focuses on code compliance oversight, inspection, verification of structural drawings, and reporting defects to the municipal building authority on behalf of the engineering organization. Civil Execution licenses the engineer to act as a legally recognized Constructor/Contractor (مجری ذیصلاح) or Head of Workshop (سرپرست کارگاه), carrying direct legal, technical, and safety liability for all on-site construction operations, workers, equipment, and structural execution quality.
Is this practice bank an official test or translation?
No. This question bank is an independent English-language educational adaptation designed by experienced civil engineers. It faithfully mirrors the technical rigor, code references, calculation standards, and conceptual balance of the official exam, but is not an official release or authorized translation by the Ministry of Roads and Urban Development or IRCEO.