All Practice Exams

Free Practice Questions for Haryana BSEH Senior Secondary NSQF Construction

Exam-style questions and explanations by OpenExamPrep.

✓ No registration✓ No credit card
100+ Questions
100% Free

Loading practice questions...

Exam Review

Key Facts: Haryana BSEH Senior Secondary NSQF Construction Exam

2 h 30 min

Official theory duration for BSEH Class 12 NSQF Construction (CON 987)

BSEH Construction NSQF Question Paper Design 2025-26

30 + 50 + 20

Theory + Practical + Internal Assessment mark split (grand total 100)

BSEH Class 12 Construction (NSQF) Syllabus 2025-26

CON 987

Subject / date-sheet code for Haryana BSEH Senior Secondary NSQF Construction

BSEH Class 12 NSQF Construction syllabus PDF

~33%

Typical minimum pass threshold under standard BSEH Senior Secondary rules (confirm circular)

Standard BSEH Senior Secondary assessment practice

100 MCQs

Free English theory practice items on this OpenExamPrep page (study adaptation)

OpenExamPrep

BSEH Senior Secondary NSQF Construction (CON 987) is Haryana’s Class 12 construction skill subject: Theory 30 + Practical 50 + IA 20 = 100, theory 2.5 hours. Pass often ~33%. Fee is part of Senior Secondary form-fill-up. Free English MCQ theory practice—not a full written/practical simulation or mason licence.

Sample Haryana BSEH Senior Secondary NSQF Construction Practice Questions

Try these sample questions to review concepts for the Haryana BSEH Senior Secondary NSQF Construction exam. Each question includes a detailed explanation. Start the interactive quiz above for the full 100+ question experience with AI tutoring.

1Random rubble masonry is best described as masonry built with:
A.Precisely squared ashlar blocks with 3 mm joints only
B.Irregularly shaped stones of random sizes laid with mortar (or dry) without uniform dressing
C.Only factory-made concrete hollow blocks
D.Timber logs stacked without stone
Explanation: Random rubble uses stones of irregular shape and size, roughly as obtained from the quarry or with limited dressing, laid either in courses or without regular courses. It is distinct from fine ashlar work.
2Based on arrangement of stones, rubble masonry is commonly classified as:
A.Only dry and prestressed
B.Coursed rubble and uncoursed rubble
C.Only RCC and PSC
D.Only cavity and solid concrete
Explanation: Rubble masonry is classified by course arrangement into coursed rubble (stones roughly levelled into horizontal courses) and uncoursed rubble (stones laid without maintaining regular horizontal courses).
3Uncoursed random rubble masonry is typically preferred for compound walls and low godown walls because it is:
A.The highest-strength system for multi-storey seismic cores
B.Economical, using stones nearly as obtained without maintaining regular courses
C.Required by code for all high-rise lift shafts
D.Built only with polished marble facing
Explanation: Uncoursed random rubble is relatively cheap and quick for low walls because stones need little dressing and need not be set in regular level courses.
4Coursed random rubble masonry differs from uncoursed work mainly because in coursed work:
A.No mortar is ever used
B.Stones are arranged so that bed joints form roughly continuous horizontal courses of uniform height
C.Only brickbats are used as face stones
D.Courses must be of ashlar granite only
Explanation: In coursed rubble, stones are selected and packed so that each course has approximately the same height and bed joints run in roughly continuous horizontal lines.
5A stone suitable for load-bearing random rubble walls should primarily be:
A.Soft, highly porous, and easily powdered by hand
B.Hard, durable, free from cracks, soft patches, and excessive weathering
C.Only glass-like transparent quartz
D.Painted timber imitation stone
Explanation: Building stones for rubble walls must be hard and durable, without cracks, soft pockets, or advanced weathering that would reduce strength and durability in service.
6Which visual check helps reject poor building stone before laying in rubble masonry?
A.Ignoring laminations if the colour looks attractive
B.Accepting stones with wide open cracks if they are large
C.Rejecting stones showing deep weathering, soft veins, or continuous cracks on faces
D.Selecting only the lightest, hollow-sounding stones
Explanation: Visual inspection rejects stones with weathering, soft veins/patches, or continuous cracks that indicate weakness and poor durability in the wall.
7Hammer-dressed stones in rubble work are stones that have been:
A.Left completely undressed as taken from the quarry with no hammer work
B.Roughly dressed with a mason’s hammer so faces and edges are somewhat regular
C.Polished with a machine to a mirror finish
D.Cast in steel moulds as artificial stone
Explanation: Hammer dressing uses a mason’s hammer (and sometimes a chisel) to knock off projections so the stone has roughly even faces and edges suitable for coursed or better rubble work.
8Undressed stones used in rough rubble work are typically:
A.Stones used almost as obtained from the quarry with only minor knapping of weak corners
B.Stones fully squared on all six faces like fine ashlar
C.Only factory-ground marble tiles
D.Precast concrete lintels
Explanation: Undressed (or nearly undressed) rubble stones are used with little shaping beyond removing weak corners or sharp projections that would prevent seating.
9Which tool is most commonly used for rough dressing and knocking off projections on rubble stones?
A.Spirit level only
B.Mason’s hammer (walling hammer) and bolster/chisel set
C.Glass cutter
D.Paint roller
Explanation: Rough dressing of rubble stones is done mainly with a mason’s hammer and chisels/bolsters to remove projections and shape beds and sides.
10Cement mortar for random rubble masonry is prepared by mixing cement and sand with water to a workable consistency so that it:
A.Remains completely dry powder when laid
B.Binds stones, fills voids, and develops strength after setting and hardening
C.Acts only as a coloured paint on the face
D.Replaces the need for any foundation
Explanation: Mortar’s role is to bind stones, distribute load, and fill joints/voids. Proper cement–sand proportioning and water for workability are essential for strength and durability.

About the Haryana BSEH Senior Secondary NSQF Construction Exam

Haryana BSEH Senior Secondary NSQF Construction is the Class 12 skill subject (code CON 987) under the Board of School Education Haryana. The 2025-26 syllabus assesses random rubble masonry (materials, dressing, coursed/uncoursed walls, pointing), IPS and Tremix flooring including vacuum dewatering concepts, environmental health and safety on construction sites, and employability skills. Full subject marks are Theory 30 + Practical 50 + Internal Assessment 20 = 100. The official exam is mixed written + practical, not pure MCQ and not a trade licence. The 100 questions on this page are a free English-language MCQ study adaptation with explanations.

Exam sponsor: Board of School Education Haryana (BSEH). The requirements and fees below concern the certification or admission exam, separate from our free practice resources.

Assessment

Official (BSEH 2025-26 Construction NSQF, code CON 987): Theory 30 + Practical 50 + IA 20 = 100. Theory 2 h 30 min. Vocational units: Random Rubble Masonry (~25/60); IPS and Tremix Flooring (~25/60); Environmental Health and Safety (~10/60); Employability (~10/60). Local bank: English MCQ study adaptation only.

Time Limit

2 hours 30 minutes theory + practical evaluation as scheduled by school/Board

Passing Score

Typically 33% minimum under standard BSEH Senior Secondary / NSQF subject rules (confirm the latest Board circular).

Exam / Certification Fees

Included in the annual BSEH Senior Secondary / NSQF examination fee notification.

Exam sponsor website

Reported exam pass rate: Overall Senior Secondary pass percentages are published with each BSEH result cycle; no fixed standing subject-wise NSQF Construction pass-rate figure is used here.. Exam sponsor website

Fees, eligibility, and exam policies can change. Confirm them with the exam sponsor before applying or paying.

Our practice resources: topics covered

We aim to reflect publicly available exam outlines and topic information in our study resources. Coverage, format, and difficulty may differ from the actual exam, and we cannot guarantee that every detail is accurate or current. Confirm exam requirements, fees, and policies with the official exam sponsor.

42%

Random Rubble Masonry

Stone properties, dressing, coursed and uncoursed random rubble walls, mortar, dry rubble courses, and pointing methods.

42%

IPS and Tremix Flooring

IPS preparation and laying; Tremix tools; vacuum dewatering stages; advantages and disadvantages.

16%

Environmental Health and Safety

Site and masonry hazards; emergency measures; fire extinguishers; PPE; material stacking and reporting.

17%

Employability Skills

Communication, self-management, ICT, entrepreneurship, and green jobs.

Preparing for the Haryana BSEH Senior Secondary NSQF Construction Exam

What You Need to Know

  • Passing score: Typically 33% minimum under standard BSEH Senior Secondary / NSQF subject rules (confirm the latest Board circular).
  • Assessment: Official (BSEH 2025-26 Construction NSQF, code CON 987): Theory 30 + Practical 50 + IA 20 = 100. Theory 2 h 30 min. Vocational units: Random Rubble Masonry (~25/60); IPS and Tremix Flooring (~25/60); Environmental Health and Safety (~10/60); Employability (~10/60). Local bank: English MCQ study adaptation only.
  • Time limit: 2 hours 30 minutes theory + practical evaluation as scheduled by school/Board
  • Exam / certification fees: Included in the annual BSEH Senior Secondary / NSQF examination fee notification. Official sources

Using Our Practice Resources

  • Work through all 100 available questions
  • Review every answer and explanation
  • Track weak areas and revisit them
  • Use our AI tutor for tough concepts

Haryana BSEH Senior Secondary NSQF Construction: Suggested Study Strategy

1Know coursed vs uncoursed random rubble masonry layout rules.
2Pointing requires joint raking and the correct pointing method for durability and appearance.
3IPS flooring needs proper base preparation before topping.
4Tremix vacuum dewatering aims to remove excess water for stronger, denser floors—know stages conceptually.
5Never skip PPE and material stacking rules on site.
6Balance MCQs with labelled sketches and short written answers.

Frequently Asked Questions

Is the official BSEH Senior Secondary NSQF Construction exam pure multiple-choice?

No. Official BSEH Senior Secondary NSQF theory is a mixed written paper (objective items including some MCQs, very short, short, and essay questions) plus practical and internal assessment. The 100 questions on this page are an English-language MCQ study adaptation for theory and employability knowledge—not a full simulation of the official constructed-response paper or practical skills.

What is the marks split and theory duration for BSEH Class 12 Construction (CON 987)?

Per BSEH 2025-26 Construction (NSQF) syllabus: Theory 30 marks (raw 60 ÷ 2), Practical 50 marks, Internal Assessment 20 marks (grand total 100). Theory time is 2 hours 30 minutes.

What is the passing score?

Under typical BSEH Senior Secondary / NSQF subject rules, candidates need about 33% (confirm the latest Board circular for your year).

Which units are covered in Class 12 Construction NSQF?

Vocational units: Random Rubble Masonry; IPS and Tremix Flooring; Environmental Health and Safety; plus Employability Skills.

Does this practice bank certify me as a mason?

No. BSEH Senior Secondary NSQF Construction is a Class 12 school skill-subject assessment. These free MCQs are theory study aids only and do not grant any occupational masonry licence.

How should I use this free bank?

Drill rubble masonry terms, Tremix vacuum stages, and site EHS scenarios daily. Maintain practical records and write short/essay answers. Confirm date sheets and fees on bseh.org.in.