In the AIA family of documents, which standard form is the Agreement between Owner and Contractor where the basis of payment is a stipulated sum?
Contracts Agreements
Question · Easy
AIA Document A201 is best described as which of the following?
Under AIA A201, which three parties' relationships and responsibilities are primarily defined by the General Conditions?
Trades Exam Prep Podcast
Listen on Spotify
Podcast
The EJCDC C-700 document corresponds most closely to which AIA document in function?
Question · Medium
Under AIA A201, when the Contract Documents are silent on responsibility but the work is reasonably inferable as necessary, which document principle generally applies?
Question · Hard
Which AIA document is the Contractor's Qualification Statement used to evaluate a contractor's experience and financial capacity?
In a design-bid-build delivery method, with whom does the Owner hold a direct contract for design services?
Under AIA A201, the Architect is described as the Owner's representative who will perform which role during construction?
What term describes the total amount payable by the Owner to the Contractor for performance of the Work under the Contract?
Which payment basis sets a maximum price the Owner will pay, with the Contractor's costs reimbursed up to that ceiling and savings often shared?
AIA A101-2017 is designed to be used together with which document for general conditions?
Under AIA A201, which party retains responsibility for construction means, methods, techniques, sequences, and procedures?
In the AIA documents, the term 'Work' as defined in A201 includes which of the following?
Which delivery method combines design and construction responsibility under a single contract with the Owner?
Under AIA A201, the Contract Documents are described as 'complementary.' What does this mean for the Contractor?
The collection of written documents bound together that includes bidding requirements, contract forms, conditions of the contract, and specifications is known as the:
Contract Documents
CSI MasterFormat is best described as the standard for organizing which of the following?
In the CSI three-part SectionFormat, which part contains products, materials, and acceptable manufacturers?
Which MasterFormat division contains the General Requirements, including administrative and procedural specifications such as submittals and closeout?
When a conflict exists between the drawings and the specifications and the contract is silent on precedence, what is the generally recommended first action?
Which document in the Project Manual modifies the standard General Conditions to suit a specific project's legal or local requirements?
Under the CSI documents, where in a specification section would 'submittal' requirements typically be located?
How many divisions are in the current CSI MasterFormat?
In MasterFormat, Division 00 (Procurement and Contracting Requirements) typically includes which of the following?
What is the primary purpose of the Instructions to Bidders in the Project Manual?
Which statement about the relationship between drawings and specifications is most accurate under CSI practice?
A document issued during the bidding period that adds to, deletes from, or changes the bidding documents is a(n):
Bidding Negotiating
When should addenda be issued relative to the bid opening to give bidders adequate time to respond?
In competitive bidding, what is the purpose of a bid bond?
A bidder discovers a product they wish to use that differs from the specified product before the bid date. Under typical Instructions to Bidders, how is this handled?
What is an 'or-equal' provision in a specification?
In public procurement, what is the typical basis for awarding a competitively bid construction contract?
What distinguishes a negotiated contract from a competitively bid contract?
Bid security is most commonly provided in which two forms?
If a bidder discovers an apparent error in their bid after the bid opening but before award, what is the customary remedy under typical instructions to bidders?
What is the purpose of an alternate in a bid?
A unit price in a bid is best described as:
During bidding, who has authority to issue addenda that change the contract documents?
What does it mean for a bid to be 'non-responsive'?
During the preconstruction phase after award, which meeting is typically held to establish lines of communication and review project procedures?
Preconstruction Award
A performance bond primarily protects the Owner against which risk?
A payment bond on a construction project protects which parties?
In a surety bond arrangement, who are the three parties involved?
How does a surety bond differ fundamentally from an insurance policy?
Under typical AIA documents, builder's risk insurance (property insurance during construction) is most commonly required to be provided by which party?
A notice to proceed (NTP) issued to the Contractor primarily establishes which of the following?
What is the purpose of the contractor furnishing certificates of insurance before starting work?
Loading more…