All Practice Exams

100+ Free Ruankao Information System Supervisor (Intermediate) Practice Questions

Prepare for the Computer Technology and Software Professional Qualification (Level) Examination — Intermediate Information System Supervisor (计算机技术与软件专业技术资格(水平)考试 — 中级 信息系统监理师) exam with instant access — no signup required.

✓ No registration✓ No credit card✓ No hidden fees✓ Start practicing immediately
100+ Questions
100% Free

Loading practice questions...

2026 Statistics

Key Facts: Ruankao Information System Supervisor (Intermediate) Exam

45/75

Passing score required on each of the two subjects in the same sitting

National 软考 fixed passing standard (60% of 75) cited in 深人考发〔2026〕7号

240 minutes

Combined CBT time for 基础知识 then 应用技术

软考 computer-based sitting rules for intermediate qualifications; 2026 upper-half batch notice

23–26 May 2026

Upper-half-year 2026 sitting window; 监理师 is not in the October 2026 list

计考办〔2026〕1号 / 深人考发〔2026〕7号

RMB 73/subject

Guangdong/Shenzhen fee example

粤发改价格函〔2024〕1073 via 深人考发〔2026〕7号

No score rollover

Both subjects must be passed together; a single subject is not retained

软考 intermediate two-subject sitting rule

Two subjects

信息系统工程监理基础知识 (choice) plus 信息系统工程监理应用技术 (short-answer)

Official 考试说明 https://www.ruankao.org.cn/article/content/ksjs/02_44.html

软考 Intermediate Information System Supervisor is a Chinese CBT qualification: knowledge MCQs plus a 监理 case paper in one 240-minute sitting, 45/75 on each subject, no score rollover. In 2026 it is offered only in the 23–26 May upper window. This 100-question English MCQ bank adapts 监理 controls, bidding/contract judgment, and network/software/data-center practice; it is not an official paper or a 监理日记.

Sample Ruankao Information System Supervisor (Intermediate) Practice Questions

Try these sample questions to test your Ruankao Information System Supervisor (Intermediate) exam readiness. Each question includes a detailed explanation. Start the interactive quiz above for the full 100+ question experience with AI tutoring.

1In 信息系统工程监理, which three parties form the basic contractual triangle of an information-system project?
A.MIIT, MOHRSS, and the provincial testing authority only
B.The end-user department, the advertising agency, and the cloud reseller
C.The 测评机构, the antivirus vendor, and the hardware distributor only
D.建设单位 (owner), 承建单位 (contractor), and 监理单位 (supervision unit)
Explanation: 信息系统工程监理 is organized around three parties: the owner (建设单位/业主单位) who pays for the system, the contractor (承建单位) who implements it, and the independent 监理单位 engaged by the owner. Official 考试说明 treats 监理 as a professional service that supervises implementation rather than replacing the owner or the contractor. The exam body and vendors are not the project triangle.
2A 监理单位 is also hired as the software 承建单位 on the same e-government project and will write the application code it is supposed to supervise. What principle is primarily violated?
A.The rule that 软考 must be taken in English
B.The requirement that every project use waterfall only
C.Independence and impartiality of 监理
D.The owner's right to change the project name
Explanation: 监理 is a third-party supervisory service. If the same organization implements the system it is engaged to supervise, it cannot impartially control quality, progress, investment, or change. Official 考试说明 expects 监理师 to apply 监理 methods and ethics, which include not acting as the contractor on the same assignment.
3The official 信息系统监理师考试说明 lists 掌握 methods that include quality, progress, and investment control plus change control, contract management, information management, security management, and which additional heading?
A.Issuing 等保 certificates as the 测评机构
B.组织协调 (organization and coordination)
C.Writing the contractor's source code in place of developers
D.Setting the national 软考 passing score each sitting
Explanation: The official 考试说明 requires mastering 质量控制, 进度控制, 投资控制, 变更控制, 合同管理, 信息管理, 安全管理, and 组织协调, and applying them on information-network and information-application systems. Coordination among owner, contractor, and specialists is part of that 掌握 list. 监理 does not replace developers, the exam office, or the 等级测评 institution.
4After the 监理合同 is signed, who typically hosts compilation of the project's 监理规划 (supervision plan)?
A.总监理工程师 (chief supervision engineer)
B.A junior 监理员 acting alone without 总监 involvement
C.The contractor's coding team lead
D.The provincial 软考 office
Explanation: 监理规划 is the job-level plan prepared after the 监理 assignment is awarded. Teaching and GB/T 19668-style document practice place 监理规划 under the 总监理工程师, who organizes the 监理机构 to write it for the owner's project. A 监理员 or the contractor cannot own that plan, and 软考 administration is unrelated.
5A 专业监理工程师 drafts a 监理实施细则 for the data-center electrical package. Whose approval is required before that 细则 is used on site?
A.Any technician from a competing 监理 firm
B.The antivirus product manager
C.A social-media influencer covering 软考
D.总监理工程师
Explanation: 监理实施细则 are specialty-level working instructions under the 监理规划. They are prepared by professional 监理工程师 for a defined work package and are approved by the 总监理工程师 before implementation. Outside firms, vendors, and media have no approval role on the project's 细则.
6The 监理合同 is typically signed between which two parties?
A.Two competing 承建单位 as a coding joint venture
B.The candidate and ruankao.org.cn for the practice bank
C.建设单位 and 监理单位
D.承建单位 and the 测评机构 only
Explanation: 监理 is a service the owner buys. The 监理合同 is between 建设单位 and 监理单位. The implementation contract is a separate owner–contractor agreement. Mixing those two contracts is a common 应用技术 trap.
7The software implementation contract on the same project is typically signed between which two parties?
A.The help-desk vendor and the advertising agency only
B.建设单位 and 承建单位
C.监理单位 and the 软考 office
D.Two 专业监理工程师 as private individuals
Explanation: The owner contracts with the 承建单位 for implementation. 监理 supervises that contract; it is not itself the implementation contractor. Keeping the two contracts distinct is core 监理 judgment.
8Which statement best describes the relationship between 信息系统工程监理 and the contractor's project manager?
A.监理 supervises performance against contract and standards; it does not replace the contractor's project manager
B.监理 becomes the contractor's only project manager and fires the 承建单位 staff
C.监理 must write all application source code so the PM can leave site
D.监理 has no role once a PM is named
Explanation: Official 考试说明 expects 监理师 to organize and implement 监理, not to absorb the contractor's management. The 承建单位 still plans, codes, and delivers; 监理 controls, records, and coordinates. Replacing the PM or writing the product is outside 监理.
9On an information-network cutover, 旁站 (witnessing) is the 监理 method that best matches which action?
A.Only reading last month's invoice without visiting the equipment room
B.Posting the owner's password on a public wiki
C.Rewriting the routing protocol source in a vendor OS
D.Remaining at the critical process and witnessing it in real time
Explanation: 旁站 means the 监理人员 are present for a defined critical activity (for example a cutover, a hidden cabling close-up, or a factory witness test) and record what actually happened. It is not desktop invoice review, a confidentiality breach, or becoming the product engineer.
10Which 监理 quality method is a scheduled or random patrol of the site or work products rather than continuous witnessing of one process?
A.Deleting the 监理日志 so findings disappear
B.Letting the contractor mark its own hidden works without records
C.巡视
D.平行检验 only, with no site presence ever
Explanation: 巡视 is patrol-style inspection of progress, methods, and site conditions. 平行检验 is independent sampling or testing; it is a different method. Destroying records or skipping hidden-work evidence is malpractice, not a method.

About the Ruankao Information System Supervisor (Intermediate) Exam

The Ruankao Intermediate Information System Supervisor exam (软考中级信息系统监理师) is a national computer-technology qualification under MIIT and MOHRSS. Official 考试说明 (https://www.ruankao.org.cn/article/content/ksjs/02_44.html) requires 信息系统工程监理 knowledge: quality, progress, investment, and change control; contract, information, and security management; organization and coordination; testing methods; laws and standards; and application to information-network and information-application systems. Qualified candidates can write 监理大纲, 监理规划, and 监理细则 and organize 监理 projects at engineer level. In 2026 the qualification is offered in the upper-half window 23–26 May (计考办〔2026〕1号; 深人考发〔2026〕7号); it is not in the October 2026 lower-half list. Delivery is computer-based in Chinese: 基础知识 then 应用技术 in one 240-minute sitting. Both papers must reach 45/75; scores do not roll. There is no education or experience restriction. Fees are set provincially. This OpenExamPrep bank is an English-language MCQ study adaptation of 监理 judgment, not an official translation or a substitute for the written case paper or a site diary.

Assessment

Computer-based combined sitting of 240 minutes. 基础知识: maximum 120 minutes and minimum 90 minutes. Remaining time is 应用技术. Candidates who will not sit 应用技术 may leave after 120 minutes; those continuing may leave 60 minutes before the end. Both subjects must reach 45/75 in the same sitting; scores do not roll.

Time Limit

240 minutes combined

Passing Score

45/75 each subject

Exam Fee

Provincially set (e.g. Guangdong/Shenzhen RMB 73/subject per 粤发改价格函〔2024〕1073 and 深人考发〔2026〕7号) (MIIT & MOHRSS / ruankao.org.cn)

Ruankao Information System Supervisor (Intermediate) Exam Content Outline

15%

supervision-framework-and-roles

Owner–contractor–supervisor triangle, 总监负责制, 监理 independence, 旁站/巡视/平行检验, and official 掌握 methods (quality, progress, investment, change, contract, information, security, coordination)

25%

quality-progress-cost-change

Quality hold points and inspection methods, schedule networks and float, earned-value SPI/CPI, investment/payment review, and written change control

18%

bidding-contract-and-law

招标投标法 concepts (open vs invited bidding, bid opening, evaluation committee, collusion, below-cost bids, joint ventures) without invented article numbers, plus claims and contract administration

12%

security-and-standards

Information-security 监理, 等保 and three-admin separation, GB/T 19668 series, and the rule that 监理 is not the 等级测评 institution

20%

network-software-datacenter-supervision-practice

Staged 监理 of information-network, software-engineering, and data-center projects: testing evidence, cabling, power/cooling/fire, and acceptance judgment

10%

documentation-ethics-case

监理大纲 / 监理规划 / 监理实施细则, 监理 logs and reports, impartiality and confidentiality, and ethics case judgment

How to Pass the Ruankao Information System Supervisor (Intermediate) Exam

What You Need to Know

  • Passing score: 45/75 each subject
  • Assessment: Computer-based combined sitting of 240 minutes. 基础知识: maximum 120 minutes and minimum 90 minutes. Remaining time is 应用技术. Candidates who will not sit 应用技术 may leave after 120 minutes; those continuing may leave 60 minutes before the end. Both subjects must reach 45/75 in the same sitting; scores do not roll.
  • Time limit: 240 minutes combined
  • Exam fee: Provincially set (e.g. Guangdong/Shenzhen RMB 73/subject per 粤发改价格函〔2024〕1073 and 深人考发〔2026〕7号)

Keys to Passing

  • Work through all 100 available questions
  • Review every answer and explanation
  • Track weak areas and revisit them
  • Use our AI tutor for tough concepts

Ruankao Information System Supervisor (Intermediate) Study Tips from Top Performers

1Memorize the official 掌握 list: 质量控制, 进度控制, 投资控制, 变更控制, 合同管理, 信息管理, 安全管理, and 组织协调 — including change and security, not only classic 三控两管一协调.
2Keep 监理大纲 (bid-stage), 监理规划 (after 监理合同, hosted by 总监), and 监理实施细则 (specialty-level, approved by 总监) in a strict hierarchy; one document does not replace another.
3On quality items, distinguish 旁站 (witness a critical process), 巡视 (patrol), and 平行检验 (independent sampling by 监理).
4Drill SPI = EV/PV and CPI = EV/AC with small RMB numbers until you can classify ahead/behind and under/over budget without a calculator.
5For 招标投标法 items, use published concepts (open vs invited bidding, public bid opening at the deadline, evaluation by a 评标委员会, no collusion or below-cost bids) and do not invent statute article numbers.
6Treat 应用技术 cases as 监理 judgment: name the control, the evidence, who must approve, and what you refuse to sign if the facts are false.

Frequently Asked Questions

What is the Ruankao Intermediate Information System Supervisor qualification?

It is the Intermediate Information System Supervisor subject (中级 信息系统监理师) in the Computer Technology and Software Professional Qualification (Level) Examination (软考). Official 考试说明: https://www.ruankao.org.cn/article/content/ksjs/02_44.html. Passing confers the corresponding intermediate professional qualification (工程师 level).

How is the official exam structured and scored?

Two subjects are taken in one computer-based sitting totaling 240 minutes. 信息系统工程监理基础知识 is a choice paper (maximum 120 minutes, minimum 90 minutes). Remaining time is 信息系统工程监理应用技术 (short-answer/case). Each subject is scored out of 75; both must reach 45 in the same sitting. Scores do not roll.

Who may sit the exam, and what does it cost?

There is no education or experience restriction under 国人部发〔2003〕39号. Fees are set by each province. Shenzhen/Guangdong charge RMB 73 per subject (深人考发〔2026〕7号 citing 粤发改价格函〔2024〕1073).

When is the 2026 sitting?

Information System Supervisor is offered in the 2026 upper-half window only. Provincial notices implementing 计考办〔2026〕1号 (e.g. 深人考发〔2026〕7号) place that window on 23–26 May 2026; the qualification is not listed in the October 2026 lower-half table. Batches for 监理师 were 23 May and 24 May in the MIIT Education and Examination Center batch notice. Register through https://www.ruankao.org.cn/.

Why are these practice questions in English?

The official exam is in Chinese (officialLanguages: zh) and 应用技术 is a written case paper. This OpenExamPrep bank is an English-language MCQ study adaptation of syllabus knowledge and 监理 case judgment. It is not an official translation, not a CBT simulation, and not a substitute for practicing Chinese case write-ups or keeping a 监理日记.