Free CDCP Exam Flashcards
Memorize 50 essential terms and definitions for the EXIN Certified Data Centre Professional (CDCP). See the term, recall the definition, then flip to check yourself.
Uptime Institute Tier I
Basic capacity with a single non-redundant power/cooling distribution path. Maintenance of critical infrastructure may require IT shutdown. Uptime removed predicted downtime percentages from its Tier Standard in 2009; a Tier is not an uptime SLA.
Filter by Topic
Jump to Card
About These CDCP Flashcards
These 50 flashcards are designed to help you memorize key terms and definitions for the EXIN Certified Data Centre Professional (CDCP). Each card shows a term on the front and its definition on the back—the classic flashcard format for vocabulary memorization. Use these alongside our practice questions to build both recall and comprehension.
Topics Covered
Complete Flashcard Reference
Review every term in this set. Open any term to reveal its definition.
Uptime Institute Tier I
Basic capacity with a single non-redundant power/cooling distribution path. Maintenance of critical infrastructure may require IT shutdown. Uptime removed predicted downtime percentages from its Tier Standard in 2009; a Tier is not an uptime SLA.
Uptime Institute Tier II
Adds redundant power and cooling capacity components while retaining a single distribution path. Component redundancy improves resilience, but a shared distribution failure can interrupt IT. It carries no predicted annual availability percentage.
Uptime Tier III — Concurrently Maintainable
Concurrent maintainability: required capacity components and distribution-path elements can be isolated for planned maintenance without affecting IT. This capability does not itself guarantee survival of every unplanned fault.
Uptime Tier IV — Fault Tolerant
Adds fault tolerance to Tier III: a single capacity-component or distribution-path failure must not interrupt IT. Physical isolation and continuous cooling matter. Uptime specifies outcomes rather than requiring a universal 2N schematic.
ANSI/TIA-942 Rated-1 to Rated-4
TIA-942 uses 'Rated' (not 'Tier' — a Uptime Institute trademark) for facility robustness. Rated-1 Basic, Rated-2 Redundant Components, Rated-3 Concurrently Maintainable, Rated-4 Fault Tolerant. They map conceptually to Uptime Tiers but are assessed against TIA's own criteria, so they are not interchangeable certifications.
EN 50600 / ISO/IEC 22237
European/global multi-part data centre standard covering design and operations. It classifies on Availability (1-4), Physical Security (1-4), and Energy Efficiency Enablement, plus KPIs (PUE, WUE, CUE per ISO 30134). EN 50600 is the EN version; ISO/IEC 22237 is its international counterpart.
N vs N+1 redundancy
N is baseline capacity sized exactly to the load — no spare, so any failure causes downtime. N+1 adds one redundant unit (e.g. one extra UPS module or chiller) so a single component failure is absorbed, but a single shared distribution path is still a single point of failure.
2N vs 2(N+1) redundancy
2N provides two independent systems each capable of the full load. 2(N+1) adds one spare unit within each of those systems. 2N+1 means two N complements plus one extra unit and is not algebraically or architecturally equivalent to 2(N+1).
Man-made hazard standoff in site selection
Refineries, chemical plants, railways and flight paths are examples of man-made site risks. Evaluate likelihood, consequence, distance, mitigation and applicable requirements; no single distance automatically disqualifies every site.
Raised access floor load capacity
Assess the slab, access-floor panels, pedestals and the whole transport route against actual cabinet loads. Uniform, concentrated and rolling ratings describe different tests; a uniform kg/m2 value alone does not establish safe wheel or foot loading.
Suspended ceiling (T-bar) in data centres
A suspended ceiling can form a return-air plenum, including a ducted hot-aisle return. Cable trays, lights and fire systems need independently designed supports, clearances and access; ceiling panels are not structural supports for heavy services.
EMF shielding for site selection
Strong electromagnetic fields from high-voltage transmission lines, transformers, or rail systems can disrupt IT equipment and corrupt storage media. Site surveys measure DC and AC field strength; mitigation is shielding (mu-metal, ferromagnetic enclosures) or relocating the white space away from the source.
Water leak detection under raised floor
Conductive cable sensors snaked under the raised floor and around CRAC units, chillers, and pipe runs alarm before pooled water reaches live power or subfloors. Zoned detection tells operators which row or CRAC area is wet, enabling fast isolation and limiting water damage.
Offline (standby) UPS
Standby UPS normally supplies the load from utility and transfers to its inverter when needed. Transfer time and surge/voltage protection depend on the model. Check equipment ride-through requirements rather than assuming every standby unit suits every load.
Line-interactive UPS
Adds an autotransformer/buck-boost to offline topology for voltage regulation without switching to battery, trimming minor sags and swells. The load still sees utility power quality during normal operation, so it is mid-tier protection — better than offline but not isolation-grade.
Double-conversion (online) UPS
Online UPS normally rectifies AC to DC and supplies the load through an inverter. Battery takeover can have no output break in this mode. It does not imply galvanic isolation or immunity to every transient; bypass-mode behaviour and efficiency are product-dependent.
UPS battery autonomy
Size stored energy to bridge source detection, generator start, stabilization, transfer, retries and the chosen shutdown margin. Check end-of-life capacity and vendor runtime curves at the actual load; runtime is not exactly proportional to battery size or inverse load.
Automatic Transfer Switch (ATS)
An ATS transfers a load between sources, often utility and generator. Open transition breaks before making; closed transition briefly parallels acceptable synchronized sources. Total outage-to-restoration time includes generator readiness and programmed delays, not just contact movement.
Static Transfer Switch (STS)
A solid-state STS rapidly transfers a load between acceptable AC sources. A common use is supplying single-cord equipment from redundant sources. Transfer time and phase limits must match the load; dual-cord equipment can instead connect directly to independent A/B feeds.
Standby diesel generator role
Standby generation supports the required IT, cooling and other critical loads during extended utility loss. Verify step-load acceptance, start/transfer timing, fuel quality, storage, replenishment and local requirements. NFPA 110 Type denotes restoration time; Class denotes duration.
Signal Reference Grid (SRG)
A bonded copper mesh installed under the raised floor ties all racks, cabinets, and equipment chassis to a common reference potential, shunting high-frequency noise and equalising ground voltage. It complements (does not replace) the life-safety electrical bonding network.
Harmonic distortion (THD) in power
Nonlinear loads create harmonic currents that can heat neutrals and transformers. Voltage THD and current distortion are different measurements. Applicable IEEE 519 limits depend on voltage level and system characteristics at the point of common coupling; there is no universal 5% limit for everything.
Emergency Power Off (EPO)
Emergency Power Off disconnects the designed electrical loads for an emergency. Its required scope, location, exceptions and interlocks depend on adopted electrical/fire codes and the room design. Guard against accidental activation; do not assume every IT room requires the same EPO arrangement.
CRAC vs CRAH
A CRAC (Computer Room Air Conditioner) contains a compressor and direct-expansion (DX) refrigerant coil — self-contained refrigeration. A CRAH (Computer Room Air Handler) has no compressor; it uses a chilled-water coil fed by a central chiller plant. CRAHs scale better in large facilities served by efficient chiller plants.
Hot aisle / cold aisle layout
Arrange cabinet intakes face-to-face across cold aisles and exhausts face-to-face across hot aisles. This reduces mixing; panels, seals and appropriate containment further control bypass and recirculation.
Hot-aisle vs cold-aisle containment
Cold-aisle containment encloses supply air, leaving the wider room as a warmer return zone. Hot-aisle containment encloses exhaust, leaving the open room cooler. Actual comfort, heat stress, energy use and fire-system compatibility depend on the design.
ASHRAE TC 9.9 recommended envelope
For A1-A4, the ASHRAE 2021/2024 reference card recommends 18-27 C at IT inlets, with -9 to 15 C dew point and a 70% or 50% RH ceiling depending on pollutant/corrosion conditions. The recommended envelope is not a simple 20-80% RH rectangle.
ASHRAE classes A1-A4 allowable envelopes
Allowable dry-bulb ranges at reference conditions: A1 15-32 C, A2 10-35 C, A3 5-40 C, A4 5-45 C. Apply the accompanying dew-point, humidity, altitude and rate-of-change limits and equipment specifications. Allowable operation is not a reliability recommendation.
Air-side economizer (free cooling)
Direct air-side economizers use filtered outdoor air when the full operating conditions allow. Partial economization can supplement mechanical cooling; full economization can switch compressors off. Check contamination, humidity, smoke events and inlet conditions.
Water-side economizer
A water-side economizer uses sufficiently cool water and a heat exchanger to reduce or bypass compressor cooling while keeping outdoor air out of the IT room. Climate, water temperatures, fan/pump energy and equipment design determine efficiency; it is not always less efficient than air-side.
Direct-to-chip (cold-plate) cooling
Cold plates attached to processors transfer heat to a liquid loop. The coolant distribution unit and facility loop reject that heat. Some components may still need air cooling; the proportion captured by liquid depends on the server design.
Immersion cooling (single vs two-phase)
Immersion places compatible electronics in a dielectric liquid. Single-phase systems keep the liquid liquid; two-phase systems boil and condense it. Check fluid compatibility, service access, facility heat rejection and safety; no particular PUE is guaranteed.
Rear-door heat exchanger (RDHx) and in-row cooling
A rear-door exchanger removes heat from rack exhaust using a liquid coil; designs can be passive or fan-assisted. In-row cooling places cooling units near racks. Both still require sufficient upstream heat-rejection capacity.
NFPA 75 vs NFPA 76
NFPA 75 is the Standard for the Fire Protection of Information Technology Equipment — covering construction, suppression, and emergency procedures for IT rooms and data centres. NFPA 76 covers telecommunications facilities (central offices, POPs). Both are referenced in CDCP fire protection; 75 is the primary IT-equipment standard.
VESDA / aspirating smoke detection
Aspirating detectors draw air through sampling pipes into a sensitive detector. Appropriate pipe design and alarm settings can provide very early warning, including in high-airflow or concealed zones. Response time depends on smoke transport and the installed system.
FM-200 (HFC-227ea)
FM-200 is HFC-227ea, a residue-free, electrically nonconductive halocarbon agent with high GWP. Use only within approved design and exposure limits, with evacuation controls. HFC phase-down rules and service availability vary by jurisdiction.
Novec 1230 (FK-5-1-12)
Novec 1230 was 3M's FK-5-1-12 fire-protection fluid brand. Low GWP does not settle all environmental or supply questions: 3M completed its PFAS manufacturing exit in 2025. Check approved alternatives, supply and local rules rather than treating the brand as a universal long-term recommendation.
IG-541 (Inergen) and IG-55 (Argonite)
IG-541 comprises 52% nitrogen, 40% argon and 8% carbon dioxide; IG-55 is 50% nitrogen and 50% argon. They reduce oxygen to extinguish fire. Occupant safety requires concentration/exposure limits, alarms and evacuation; reduced oxygen is not automatically safe.
Defense in depth (layered physical security)
Multiple independent physical controls — perimeter fence, building shell, mantrap, room door, cabinet lock — so defeating one layer still leaves others. EN 50600-2-5 and ISO 27001 Annex A.7 codify this for data centres; each layer must be independently auditable and tested.
Mantrap (interlocking doors)
An interlocked vestibule prevents both doors opening together. Occupancy sensing, authentication and operating procedures are needed for one-person control. An interlock alone cannot guarantee that tailgating is impossible; emergency egress must remain safe.
Biometric access and intrusion detection (IDS)
Biometric readers (fingerprint, iris, palm vein, facial) authenticate identity at the room or rack — harder to share or steal than badges. CCTV with analytics and EN 50131-classified intrusion detection record and alarm on perimeter or cabinet access, providing evidence and deterrence alongside the access-control decision.
TIA-942 topology: MDA / HDA / ZDA / EDA
MDA (Main Distribution Area) is the core cross-connect where external carriers meet the data centre backbone. HDA (Horizontal) feeds EDA (Equipment) cabinets via horizontal cabling. ZDA (Zone) is an optional consolidation point between HDA and EDA. The structured hierarchy keeps changes off the core and shortens MAC work.
Multimode (OM3/OM4/OM5) vs single-mode fibre
Fibre reach depends on the Ethernet application and optics. For 100GBASE-SR4, OM3 supports 70 m and OM4 100 m; those are not universal fibre limits. OM5 supports wideband multimode applications; single-mode supports longer links with compatible optics and a verified loss budget.
MTP/MPO connector
MPO is a multifibre connector; MTP is a US Conec MPO brand. 40GBASE-SR4 and 100GBASE-SR4 use eight active fibres total: four transmit and four receive, commonly in a 12-position MPO connector. One 12-fibre trunk corresponds to six duplex fibre pairs, not twelve.
SOP vs MOP vs EOP
SOP (Standard Operating Procedure) documents routine repeatable operations (start-up, daily checks). MOP (Method of Procedure) describes a specific change or maintenance task with step-by-step risk and rollback — required before non-routine work. EOP (Emergency Operating Procedure) defines response to fire, power loss, EPO activation, or flooding.
Commissioning (Cx) Levels 1-5
In a common five-level project scheme: 1 factory testing; 2 installation checks; 3 equipment startup; 4 functional performance testing; 5 integrated systems testing. Confirm the project's definitions. Ongoing/seasonal commissioning is a further lifecycle activity, not a substitute for Level 5 IST.
DCIM vs BMS vs EPMS
BMS monitors/controls building services; EPMS specializes in electrical monitoring; DCIM combines facility and IT asset/capacity information. Sampling speed and integrations depend on the deployed meters and software. Certified life-safety systems retain their required independent control functions.
RTO vs RPO (BCDR)
RTO is the target maximum service interruption; RPO is tolerated data loss measured in time. A one-hour RTO and 15-minute RPO set recovery requirements, but do not mandate continuous replication or automated failover. Demonstrate the selected design through recovery tests.
Power Usage Effectiveness (PUE)
PUE = total facility energy / IT equipment energy over the same period and boundary. It is at least 1 for a complete conventional boundary; DCiE = 100/PUE percent. PUE measures infrastructure overhead, not useful IT output or total sustainability.
WUE and CUE
WUE = site water / IT energy (L/kWh); CUE = operating CO2-equivalent emissions / IT energy (kg/kWh); REF = renewable energy / total energy. ISO/IEC 30134: WUE part 9, CUE part 8, REF part 3. Use consistent reporting periods and boundaries.
Frequently Asked Questions
What is the EXIN CDCP exam format?
The exam has 40 closed-book multiple-choice questions in 60 minutes. EPI specifies at least 27 correct; EXIN labels this 68% (27/40 is 67.5%). The published 201706 preparation guide weights facilities 85% and operations 15%; consult the current course syllabus as well.
Who accredits CDCP and who delivers the training?
EXIN accredits the credential and delivers the examination; EPI develops the course and offers instructor-led, virtual and on-demand delivery. EXIN lists training as mandatory. These flashcards supplement the required training.
Are there prerequisites for CDCP?
EPI lists no specific course-entry prerequisite and welcomes beginners; 1-2 years of data-centre or facilities experience is helpful. EXIN nevertheless requires training for certification. CDCP leads into the CDCS and CDCE design/build track.
How long is the CDCP certification valid?
CDCP is valid for 3 years. EPI offers a recertification package with current course e-books and an exam; renew the highest relevant certification under its program. Check EPI for eligibility, deadlines and any expired-certificate grace period.
How should I use these flashcards in CDCP prep?
Drill the distinctions between Tier capabilities, TIA ratings, CRAC/CRAH, ATS/STS, redundancy, recommended/allowable thermal limits and resource-efficiency metrics. Combine these cards with the practice bank and mandatory EPI course material.
What are the CDCP retake conditions?
EPI's current FAQ allows resits within six months of the first exam and directs candidates to purchase a voucher. Contact EPI if that window was missed. No fixed minimum waiting interval is stated there. The published 201706 preparation guide also requires retraining after three failures; confirm the applicable arrangements with EPI/EXIN.
Explore More EXIN Certifications
Continue into nearby exams from the same family. Each card keeps practice questions, study guides, flashcards, videos, and articles in one place.
More From This Family
Videos and articles for deeper review.