TermClick to flip

With a constant, independent 1% annual flood chance, what is the chance of at least one base flood in 20 years?

Tap to reveal definition
Card 1 of 50Floodplain Mapping

Filter by Topic

Jump to Card

About These ASFPM CFM Flashcards

These 50 flashcards are designed to help you memorize key terms and definitions for the ASFPM Certified Floodplain Manager (CFM). Each card shows a term on the front and its definition on the back—the classic flashcard format for vocabulary memorization. Use these alongside our practice questions to build both recall and comprehension.

Topics Covered

Floodplain Mapping9 cards
NFIP Standards & Administration20 cards
Flood Insurance5 cards
Flood Hazard Mitigation5 cards
Emergency Preparedness, Response & Recovery5 cards
Natural & Beneficial Functions3 cards
Overall Floodplain Management3 cards

Complete Flashcard Reference

Review every term in this set. Open any term to reveal its definition.

With a constant, independent 1% annual flood chance, what is the chance of at least one base flood in 20 years?

About 18.2%. Multiply the annual chances of avoiding the flood, then subtract from 1. The calculation is 1 − 0.99²⁰.

Which FEMA study exhibit helps estimate a riverine base flood elevation between mapped cross sections?

Use the flood profile in the Flood Insurance Study (FIS). Locate the site along the stream and read the modeled 1%-annual-chance water-surface elevation from the profile.

What difference in published elevation data does Zone AE signal compared with Zone A?

Both are Special Flood Hazard Areas. Zone AE has published base flood elevations (BFEs). Zone A is mapped without published BFEs.

What does the depth number on a Zone AO map label describe?

It is the mapped base flood depth in feet above ground in a shallow flooding area. Read it as a depth, with the ground as the reference.

What hazard distinguishes Zone VE on a Flood Insurance Rate Map?

Zone VE is a coastal high hazard area with base flood elevations and additional hazards from storm-driven waves. Those wave loads account for special foundation and enclosure rules.

Which part of the riverine base floodplain is the flood fringe?

It is the part of the base floodplain outside the regulatory floodway. The floodway reserves the channel and nearby land needed to carry the base flood.

Which FEMA service should you use to locate the effective flood map panel and its map changes?

Use the Flood Map Service Center. Check the effective Flood Insurance Rate Map (FIRM) and any later effective Letters of Map Change affecting the site.

Which FEMA map-change route fits naturally high ground versus ground raised by fill?

A Letter of Map Amendment (LOMA) addresses naturally high ground. A Letter of Map Revision Based on Fill (LOMR-F) addresses a property or structure elevated by qualifying fill.

What does a Conditional Letter of Map Revision establish before work begins?

A CLOMR records FEMA’s review of the proposed project and its modeled effects. An effective map change requires a later Letter of Map Revision (LOMR) based on the completed work.

A contractor wants to use an empty floodplain lot to store equipment. Can that count as development?

Yes. The NFIP definition includes storage of equipment or materials. An activity can require local floodplain review even if it adds no building.

Who issues a floodplain development permit for a proposed project in a participating community’s mapped Special Flood Hazard Area?

The community administers the permit under its adopted floodplain rules. Its review applies to proposed development, including work that does not involve a building.

What should a community check about other government permits during local floodplain review?

Confirm that legally required federal and state permits have been obtained. A single project may need approvals from multiple authorities.

How should a community handle available flood elevations for development in Zone A when FEMA has supplied no BFE?

Obtain, review and reasonably use available base flood elevation and floodway data from federal, state or other sources to apply the applicable NFIP standards.

Under the standard NFIP rule, where must the lowest floor of a new house in Zone AE be?

At or above the base flood elevation (BFE). The lowest-floor rule includes a basement and also applies to substantially improved homes.

What can a new nonresidential building in Zone AE use in place of elevating its lowest floor?

Dry floodproofing to at least the base flood elevation. A registered engineer or architect certifies the design, including resistance to water loads and buoyancy.

Which part of a new Zone VE building must reach the base flood elevation?

The underside of the lowest horizontal structural member of the lowest floor must be at or above BFE. Measure to the framing above the piles or columns.

A proposed wall below a new Zone VE house supports the floor framing. Can it serve as a breakaway wall?

A breakaway wall must be non-load-bearing. It is designed to give way under wind and water loads without damaging the elevated building or its foundation.

What net opening area does the prescriptive NFIP rule require for a 360-square-foot Zone AE parking enclosure below an elevated home?

At least 360 square inches total, based on one square inch per square foot. Use at least two openings, with their bottoms no higher than one foot above grade, to let water flow automatically.

What foundation standard applies to a newly placed Zone AE manufactured home outside a manufactured home park or subdivision?

Use a permanent foundation that puts the lowest floor at or above BFE. Securely anchor the home to resist flotation, collapse and sideways movement.

What must ordinary permit review show for fill in an adopted regulatory floodway?

Hydrologic and hydraulic analyses must show zero increase in base-flood levels anywhere in the community. A project that raises levels requires prior FEMA approval of a conditional revision.

Before a floodway is designated, what cumulative rise does the ordinary NFIP rule allow for development in Zone AE?

At most one foot at any point in the community during the base flood. The analysis combines the proposal’s effects with existing and anticipated development.

How high must a new Zone AO home’s lowest floor be when the FIRM shows a depth of 3 feet?

At least 3 feet above the highest adjacent grade. If the FIRM gives no depth number, the residential minimum is 2 feet above that grade.

A proposed addition costs $102,000 and the structure alone was worth $200,000 before work. Does it meet the federal substantial improvement threshold?

Yes. $102,000 ÷ $200,000 = 51%, above the 50% threshold. Compare the work cost with the pre-improvement market value of the structure alone.

Which repair estimate controls a substantial damage determination if the owner plans to make only partial repairs?

Use the cost to restore the structure to its condition before the damage. If that cost reaches 50% of its pre-damage market value, damage from any cause qualifies as substantial damage.

A room is below ground on all sides. How does the NFIP classify it for floodplain regulation?

It is a basement because its floor is below ground on every side. A compliant parking, access or storage enclosure below an elevated floor must be outside the basement category.

How much relief may a community grant through an NFIP variance?

Only the minimum needed given the flood hazard. For an ordinary variance, document good cause, exceptional hardship and findings that granting it meets the public-safety and flood-impact criteria.

Which elevation belongs in the local certification record for a dry-floodproofed nonresidential building?

Record the elevation to which the building is certified as floodproofed. Retain the certification with the community’s designated official.

Before relocating a river channel, which neighbors and state office must the community notify?

Notify adjacent communities and the State Coordinating Office before the work. Submit copies of the notices to FEMA.

What starts the six-month deadline for submitting technical data about physical changes affecting base flood elevations?

The clock starts when information about the changes becomes available. The community must submit the data to FEMA as soon as practicable and within six months.

Does renewing a regulated lender’s mortgage on a home in an SFHA trigger the federal flood insurance purchase rule?

Yes, where NFIP coverage is available. The rule applies when a covered lender makes, increases, extends or renews a loan secured by a building or mobile home in a Special Flood Hazard Area (SFHA).

What is the maximum NFIP Regular Program building coverage for a single-family home?

$250,000 for the building. Household contents coverage is purchased separately and has its own limit.

What is the usual waiting period for a new Standard Flood Insurance Policy?

30 calendar days after application and premium payment. One exception is initial coverage bought in connection with making, increasing, extending or renewing a loan.

Which NFIP coverage can help elevate a flood-damaged home to comply with a local floodplain ordinance?

Increased Cost of Compliance (ICC). It pays up to $30,000 for eligible work such as elevation, eligible floodproofing, demolition or relocation, subject to the policy’s combined limit.

Whose floodplain management activities determine a Community Rating System (CRS) discount?

The participating community earns the rating. CRS is voluntary and credits work beyond minimum NFIP standards. Its class can lower premiums for eligible NFIP policyholders.

What happens to land after a FEMA-funded floodplain acquisition and demolition?

The acquired lot is deed-restricted as open space in perpetuity. Taking the structure out of the flood hazard and preserving open space reduces exposure to future losses.

When a house is raised above expected flood levels, why raise its furnace and electrical equipment as well?

Utilities left below flood level can still fail when the house itself stays dry. Elevating vulnerable equipment as part of the retrofit helps preserve service and avoid repeat damage.

What is the benefit-cost ratio for a mitigation project with $360,000 in present-value benefits and $240,000 in present-value costs?

1.50. Divide present-value benefits, such as avoided flood losses, by present-value project costs. A ratio of at least 1.0 generally meets FEMA’s benefit-cost test.

After assessing hazards, what must a local hazard mitigation strategy identify?

It sets priorities for actions that reduce future losses and explains how the community will carry them out. An approved mitigation plan is a condition for many FEMA mitigation grants.

What event can make FEMA’s Hazard Mitigation Grant Program (HMGP) available for long-term risk reduction?

A presidential major disaster declaration can make HMGP funding available. The program supports measures that reduce future losses, such as elevating or acquiring flood-prone buildings.

What does the National Weather Service’s StormReady program expect a community to do if its main warning channel fails?

Have multiple ways to receive and relay warnings. Redundant channels give emergency officials and residents another way to get the message.

Where should responders look to find which local agency is responsible for coordinating a flood evacuation?

Look in the emergency operations plan. It assigns roles and responsibilities and explains how organizations will work together on tasks such as warnings, evacuation and shelter.

How does the Incident Command System (ICS) fit within the National Incident Management System (NIMS)?

NIMS is the broader framework for working across organizations. ICS provides a standard structure for directing and coordinating operations at the incident scene.

What floodplain administration work can FEMA reimburse under DRRA Section 1206?

Eligible Public Assistance costs can include post-disaster substantial damage determinations, permit review, and other eligible work to administer and enforce floodplain rules and building codes.

Which FEMA assistance program can help an eligible household with temporary housing after a disaster?

Individual Assistance serves eligible people and households. Public Assistance supports eligible public or nonprofit applicants for work such as debris removal and infrastructure restoration.

How does reconnecting a river to an undeveloped floodplain affect the downstream flood peak?

The floodplain can store some overflow and release it more slowly, which can lower and delay the downstream peak.

How can floodplain wetlands improve stream water quality?

Slow-moving water lets suspended sediment settle. Wetland plants and soils also capture and process nutrients before water returns to the channel.

What habitat benefit can a connected strip of floodplain vegetation provide?

A connected riparian corridor gives wildlife cover, food and a route between habitats. Seasonal flooding also supports species adapted to wet conditions.

What is the basic exchange behind a community’s participation in the National Flood Insurance Program?

The community adopts and enforces floodplain management rules that meet federal minimums. In return, federally backed flood insurance is available to eligible property owners, renters and businesses.

What does a local freeboard rule add to the mapped base flood elevation?

It adds a vertical safety margin, usually expressed in feet. A community can use freeboard to account for uncertainty and set a higher local protection elevation.

A project raises floodwater velocity across the river. Why would ASFPM’s No Adverse Impact approach flag it?

The project can shift risk to other properties. The approach considers effects beyond the site, including higher flood levels, faster flows and increased erosion.

Frequently Asked Questions

What is the format of the ASFPM CFM exam?

ASFPM gives candidates three hours for 120 closed-book multiple-choice questions. A passing result requires at least 84 correct answers, or 70%.

What is the CFM exam pass rate?

The ASFPM Certification Board of Regents reported 155 passes in 338 exams, about 46%, in the first four months of 2026. For calendar year 2025, its report gives an overall pass rate of 58.4%.

How do I qualify and register for the CFM exam?

Submit the application and payment to ASFPM or your state’s accredited chapter. ASFPM recommends two years of full-time floodplain management experience, a degree in a related field, or completion of FEMA’s course 273 to prepare. Meazure Learning sends scheduling instructions after application approval.

How do I retake the CFM exam?

Register again through ASFPM’s retake application or portal, or contact your accredited chapter. ASFPM’s digital retake form places the retake fee within 12 months of the initial exam. ASFPM’s public instructions give no fixed minimum wait or separate three-failure interval.

What is the largest topic area on the current CFM exam?

ASFPM gives NFIP regulatory standards and administrative procedures 35–45% of the exam. Apply the national NFIP minimums when studying federal requirements. States and local governments can adopt stricter standards for their own communities.

Does the 2026 CFM exam cover emergency preparedness, response, and recovery?

Yes. ASFPM added this domain in January 2026 and lists it at 8–12%. Review weather warning programs, emergency operations planning, incident coordination, and post-disaster assistance and administration.