Floodplain Mapping
15–20%of exam
NFIP Regulatory Standards & Regulatory Administrative Procedures
35–45%of exam
Flood Insurance
8–12%of exam
Flood Hazard Mitigation
8–12%of exam
Emergency Preparedness, Response & Recovery
8–12%of exam
Natural and Beneficial Functions
4–8%of exam
Overall Context of Floodplain Management
4–8%of exam
Quick Facts
- Credential
- Certified Floodplain Manager
- Exam owner
- Association of State Floodplain Managers
- Format
- 120 multiple-choice questions
- Time
- 3 hours
- Passing score
- 84 of 120 correct (70%)
- Materials
- Closed book
- Exam scope
- National NFIP minimum standards
- Current outline
- January 2026 update
Locate, Then Measure
Map the site, profile the height.
FIRM vs FIS
FIRM
- Shows effective flood zones
- Locates cross sections and floodways
FIS
- Explains methods and flood hazards
- Supplies profiles and data tables
Map location, then read profile
Choose the Map Product
- Need parcel zone or floodway→Check effective FIRM and amendments
- Need a detailed riverine BFE→Read 1% FIS flood profile(Locate river station)
- Survey and map datums differ→Convert to a common datum
- Natural ground meets removal criteria→Request LOMA(FEMA determines eligibility)
- Fill meets map removal criteria→Request LOMR-F(FEMA determines eligibility)
- Completed project changes mapped hydraulics→Request LOMR(Submit as-built evidence)
- Proposed project would change hydraulics→Seek CLOMR when applicable(Conditional FEMA review)
Flood Zones
- Base flood
- 1% annual chance of exceedanceIncludes equality
- SFHA
- Special Flood Hazard Area≥1% annual flood chance
- Zone A
- No mapped base flood elevations
- Zone AE
- Mapped base flood elevations
- Zone AH
- Shallow ponding with mapped elevations
- Zone AO
- Shallow sheet flowMapped depths where available
- Zone VE
- Coastal wave hazard with elevations
- Shaded Zone X
- Moderate mapped flood hazard
- Unshaded Zone X
- Minimal mapped flood hazard
- Zone D
- Undetermined flood hazard
Maps and Studies
- FIRM
- Flood Insurance Rate MapZones and boundaries
- FIS
- Flood Insurance StudyAnalyses and supporting data
- BFE
- Base Flood ElevationBase flood water surface
- Riverine flood profile
- Elevation versus stream distance
- Floodway data table
- Cross-section elevations and surcharge
- Vertical datum
- Common reference for elevation comparisons
- Hydrology
- Estimates flood discharge
- Hydraulics
- Estimates flood levels and velocities
Map Change Letters
- LOMC
- Letter of Map ChangeUmbrella term
- LOMA
- Amendment based on natural ground
- LOMR-F
- Revision based on placed fill
- LOMR
- Revision of effective flood mapping
- CLOMR
- Conditional review of proposed changesFollow with as-built revision
Floor or Frame
AE floors, VE frames.
AE vs VE Elevation
AE residential
- Measure lowest floor including basement
- Elevate at least to BFE
VE construction
- Lowest horizontal structural member bottom
- Use pilings or columns
Match the elevation reference point
Screen the Permit
- Proposed development in mapped SFHA→Require floodplain development permit
- Zone A lacks mapped BFE→Review and use available data
- New or substantially improved AE home→Elevate lowest floor to ≥ BFE
- AE nonresidential substantial improvement→Elevate or certify dry floodproofing(Target at least BFE)
- AO home lacks mapped depth→Elevate lowest floor ≥2 ft(Above highest adjacent grade)
- VE new building with BFE→Use piles or columns(Lowest horizontal member bottom ≥ BFE)
- Fill proposed within adopted floodway→Require no-rise analysis
- Floodway encroachment causes rise→Seek FEMA approval before permitting(Conditional revision under §65.12)
- Restoration ratio reaches 50%→Apply substantial improvement standards(Use full restoration cost)
Permit Desk
- Permit trigger
- Development includes grading and fill
- Unnumbered Zone A
- Use reasonably available hazard dataReview BFE and floodway data
- Larger Zone A developments
- Require base flood elevation dataOver 50 lots or 5 acres
- Zone A size threshold
- Apply whichever threshold is smaller
- Riverine watercourse alteration
- Notify state and adjacent communitiesBefore alteration or relocation
- Altered watercourse
- Preserve flood-carrying capacity
- Elevation Certificate
- Documents building and site elevations
- Variance
- Exceptional hardship plus minimum reliefApply all §60.6 tests
Value Before
Improvement before work, damage before loss.
Substantial Improvement vs Damage
Substantial improvement
- Use cost of proposed work
- Use structure value before work
Substantial damage
- Use full restoration cost
- Use structure value before damage
Both trigger at ≥50%
Elevation and Foundations
- AE residential lowest floor
- At or above BFEIncludes basement
- AE nonresidential structure
- Elevate or certify dry floodproofingAt least to BFE
- AO residential lowest floor
- Mapped depth above highest adjacent gradeDefault 2 ft without depth
- AE enclosure openings
- Automatically admit and release floodwaterParking, access, storage only
- Prescriptive flood openings
- ≥2 openings and ≥1 in²/ft²Opening bottoms ≤1 ft above grade
- VE elevation reference
- Lowest horizontal structural member bottomAt or above BFE
- VE enclosures
- Breakaway walls, lattice, or screeningParking, access, storage only
- V-zone building support fill
- Prohibited for supporting buildings
- Service equipment
- Protect against floodwater entry
- Freeboard
- Safety margin above flood elevation
Floodway Designation vs Encroachment
Floodway designation
- Reserve channel and adjoining land
- ≤1 ft base flood surcharge
Encroachment in adopted floodway
- Test proposed development
- Default is no base flood rise
Separate mapping from permit review
Floodway Limits
- Regulatory floodway
- Channel plus reserved adjoining land
- Floodway selection
- ≤1 ft base flood surchargeFederal designation ceiling
- AE before floodway designation
- ≤1 ft cumulative base flood riseExisting and anticipated development
- Adopted floodway encroachment
- Demonstrate zero base flood riseHydrologic and hydraulic analyses
- Increase beyond applicable limit
- Seek prior FEMA conditional approvalFollow 44 CFR §65.12
Substantial Damage Math
- Substantial improvement (SI)
- Improvement cost ÷ pre-work structure value≥50% triggers SI
- Substantial damage (SD)
- Restoration cost ÷ pre-damage structure value≥50% triggers SD
- SD damage cause
- Damage can have any origin
- SD restoration estimate
- Estimate full restoration to pre-damage condition
- Land value
- Exclude from structure market value
- SD classification
- Counts as substantial improvementRegardless of repairs performed
- Substantial damage example
- $60,000 ÷ $120,000 = 50%Restoration ÷ pre-damage structure value
Building vs Contents Coverage
Building coverage
- Structure and covered fixtures
- Single-family limit $250,000
Contents coverage
- Covered belongings inside
- Single-family limit $100,000
Coverage types have separate limits
Policy and Purchase Rules
- SFIP
- Standard Flood Insurance Policy
- Mandatory purchase
- Covered loans on SFHA buildingsParticipating NFIP community
- Standard NFIP waiting period
- 30 days with exceptions
- NFIP single-family building limit
- $250,000Regular Program
- NFIP single-family contents limit
- $100,000Regular Program
- ICC
- Increased Cost of ComplianceUp to $30,000 if eligible
- ICC eligible work
- Elevation, floodproofing, relocation, demolition
- CRS
- Community Rating SystemVoluntary premium discount program
- NFIP pricing
- Property-specific flood risk and characteristics
Stay, Move, Remove
Raise it, move it, or clear the site.
Dry vs Wet Floodproofing
Dry floodproofing
- Keep floodwater out
- Design for water loads
Wet floodproofing
- Let floodwater enter and exit
- Use flood damage-resistant materials
Match method to permitted use
Choose a Mitigation Measure
- Keep flood-prone home on site→Consider elevation
- Move usable building away→Consider relocation
- Permanently clear flood-prone parcel→Consider voluntary acquisition(Maintain open space)
- Seal eligible nonresidential building→Evaluate certified dry floodproofing(Check zone and loads)
- Compare avoided losses with costs→Run benefit-cost analysis
Mitigation Tools
- Hazard mitigation
- Long-term reduction of future losses
- Elevation
- Raise occupied floors and utilities
- Relocation
- Move structure to safer site
- FEMA open-space acquisition
- Voluntary buyout with perpetual open space
- Dry floodproofing
- Seal structure against floodwater entry
- Wet floodproofing
- Admit water to equalize pressure
- Benefit-cost ratio
- Present-value benefits ÷ present-value costs≥1.0 is cost-effective
- Mitigation plan
- Assess hazards and prioritize projects
Flood Watch vs Flash Flood Warning
Flood Watch
- Flooding is possible
- Prepare and monitor alerts
Flash Flood Warning
- Flash flooding imminent or occurring
- Move immediately to higher ground
Watch prepares, warning prompts action
Choose the Emergency Action
- Flood Watch issued→Get ready and monitor updates
- Flash Flood Warning in flood-prone area→Move immediately to higher ground
- Multiple agencies responding on scene→Coordinate through ICS
- Need federal declaration evidence→Conduct preliminary damage assessment
- Damaged building seeks repair permit→Screen for substantial damage
Emergency Operations and Recovery
- EOP
- Emergency Operations PlanRoles and coordinated actions
- NIMS
- National Incident Management SystemCommon incident management framework
- ICS
- Incident Command SystemOn-scene management structure
- StormReady
- National Weather Service readiness recognition
- Flood Watch
- Flooding is possible
- Flash Flood Warning
- Flash flooding imminent or occurring
- Preliminary damage assessment
- Supports disaster declaration decisions
- Local substantial damage determination
- Triggers floodplain compliance review
- Individual Assistance
- Support for eligible disaster survivors
- Public Assistance
- Aid for eligible public/nonprofit applicants
- DRRA Section 1206
- Reimburses eligible post-disaster enforcement costsBuilding codes and floodplain ordinances
Natural Floodplain Functions
- Floodwater storage
- Temporarily holds overflow
- Conveyance
- Carries floodwater downstream
- Groundwater recharge
- Infiltration replenishes aquifers
- Wetland filtration
- Retains sediment and some pollutants
- Riparian vegetation
- Stabilizes banks and limits erosion
- Habitat corridors
- Connect aquatic and terrestrial habitats
Federal Minimums vs Local Standards
Federal NFIP minimum
- National exam baseline
- Standards for participating communities
State or local standard
- May require added freeboard
- Apply stricter enacted requirements locally
Identify jurisdiction before choosing
Floodplain Management Roles
- NFIP
- National Flood Insurance Program
- FEMA
- Administers NFIP and issues maps
- State NFIP coordinator
- Supports communities with technical assistance
- Participating community
- Adopts and enforces local ordinance
- Community ordinance
- Implements applicable floodplain development standards
- No Adverse Impact
- Avoid shifting risk to others
Common Traps
Flood Recurrence
1% chance each year ≠ One flood every 100 years
Map Status
CLOMR conditional findings ≠ Effective map revision
AE Floodway Permit
Zero rise in adopted floodway ≠ One-foot floodway designation limit
Residential Floodproofing
AE residential lowest-floor elevation ≠ AE nonresidential dry floodproofing option
Substantial Damage Denominator
Pre-damage structure market value ≠ Combined land and building value
Disaster Assessments
Preliminary damage assessment for declaration ≠ Substantial damage determination for compliance
Insurance vs Permit
Flood insurance coverage ≠ Local development permit approval
Last Minute
- 1.Base flood has 1% annual chance
- 2.Use effective maps and amendments
- 3.Match datums before comparing elevations
- 4.AE residential elevation uses lowest floor
- 5.VE measures lowest horizontal member underside
- 6.Adopted floodway defaults to no-rise
- 7.Substantial damage includes exactly 50%
- 8.Damage ratio uses pre-damage structure value
- 9.NFIP waiting period usually 30 days
- 10.A Flood Watch means prepare
- 11.Flash Flood Warning means act immediately
- 12.Floodplains store and convey floodwater