ISMS Principles and Concepts
18.75%of exam
ISMS Requirements
15%of exam
Planning an ISMS Implementation
22.5%of exam
Implementing an ISMS
17.5%of exam
ISMS Monitoring and Measurement
12.5%of exam
Continual Improvement of the ISMS
7.5%of exam
Preparing for an ISMS Certification Audit
6.25%of exam
Quick Facts
- Exam owner
- PECB
- Exam scope
- English multiple-choice exam
- Question count
- 80 questions
- Time limit
- 3 hours
- Passing score
- 70%
- Reference policy
- Open book
- Question styles
- Stand-alone and scenario-based
- Choices per question
- Three, one correct
- Exam blueprint
- PECB handbook v1.5 (2026)
- ISMS standard
- ISO/IEC 27001:2022
- Current amendment
- 2024 climate action amendment
CIA Triad
Who sees it, is it right, can they use it?
Threat vs Vulnerability
Threat
- Potential cause of harm
- Example: malicious insider
Vulnerability
- Weakness a threat can exploit
- Example: excessive permissions
Assess the resulting risk scenario
Information Security Basics
- ISMS
- Information security management system
- Information asset
- Information valuable to the organization
- Confidentiality
- Access limited to authorized parties
- Integrity
- Accuracy and completeness
- Availability
- Usable on authorized demand
- Impact
- Consequence if risk materializes
- Information security control
- Measure that modifies risk
- Security incident
- Events likely to compromise security
Standards by Purpose
- ISO/IEC 27000:2026
- ISMS standards overview
- ISO/IEC 27001:2022
- ISMS requirements
- ISO/IEC 27002:2022
- Information security control guidance
- ISO/IEC 27003
- ISMS implementation guidance
- ISO/IEC 27004
- ISMS measurement and evaluation guidance
- ISO/IEC 27005:2022
- Information security risk guidance
- ISO/IEC 27006-1:2024
- ISMS certification body requirements
Clause Order
Context Leads Plans, Supports Operations, Evaluates, Improves
Requirements vs Control Guidance
ISO/IEC 27001
- Requirements for an ISMS
- Basis for organizational certification
ISO/IEC 27002
- Guidance for implementing controls
- Reference for control selection
Use 27001 as conformity criteria
Clauses 4–10
- 4 Context
- Issues, interested parties, scope
- 5 Leadership
- Commitment, policy, roles
- 6 Planning
- Risks, objectives, planned changes
- 7 Support
- Resources, competence, communication, documentation
- 8 Operation
- Run processes and implement treatment
- 9 Performance evaluation
- Measure, audit, review
- 10 Improvement
- Improve and address nonconformities
- Conformity claim
- All requirements in clauses 4–10
Annex A Themes
- A.5 Organizational
- 37 controls
- A.6 People
- 8 controls
- A.7 Physical
- 14 controls
- A.8 Technological
- 34 controls
- Annex A total
- 93 reference controls
- Annex A comparison
- Check for missing necessary controls
- Additional controls
- Design or source as needed
Security Services
- Authentication
- Verify a claimed identity
- Authorization
- Determine permitted actions
- Boundary controls
- Restrict traffic between security zones
- Encryption
- Protect confidentiality of information
- Integrity checks
- Detect unauthorized changes
- Audit logging
- Record events for traceability
SoA vs Risk Treatment Plan
Statement of Applicability
- Necessary controls and inclusion rationale
- Actual implementation status
- Justified Annex A exclusions
Risk treatment plan
- Actions to implement treatment
- Track who does what when
- Risk owners approve plan
SoA records selection and status
Choose a Risk Treatment
- Risky activity can be stopped→Avoid risk(Stop or omit the activity)
- Controls can lower risk→Modify risk(Reduce likelihood or consequences)
- Another party can share exposure→Share risk(Insurance or contract)
- Remaining risk meets criteria→Retain risk(Obtain risk owner acceptance)
- Selecting treatment for prioritized risks→Consider combined treatment options(Example: modify and share)
- Ready to authorize treatment→Get risk owner approval(Cover plan and residual risks)
Scope and Project Planning
- 4.1 Context
- Identify relevant internal, external issues
- 4.1 Climate change
- Determine relevance of climate change
- 4.2 Interested parties
- Identify relevant parties and requirements
- 4.2 Climate note
- Parties may have climate-related requirements
- 4.3 Scope
- Document boundaries, interfaces and dependencies
- Gap analysis
- Compare current state with requirements
- 5.1 Top management
- Set direction and provide resources
- 5.2 Security policy
- Frame objectives, commitments and improvement
- 6.2 Security objectives
- Set, document and monitor objectives
- 6.3 ISMS changes
- Plan changes before carrying them out
Build the SoA
- Treatment option selected→Determine necessary controls(Start from treatment needs)
- Necessary controls identified→Compare against Annex A(Check omissions)
- Control is necessary→Record inclusion rationale(State why control is needed)
- Necessary control outside Annex A→Include in SoA(Justify inclusion)
- Annex A control is unnecessary→Document exclusion rationale(Explain why it is unnecessary)
- Necessary control is planned→Record actual implementation status(Track delivery in treatment plan)
- Scope or risks change→Recheck control selection(Update affected records)
Risk Assessment Artifacts
- 6.1.2 Assessment criteria
- Define assessment and acceptance criteria
- Repeatable assessment
- Seek consistent, valid, comparable results
- Identify risks
- Find CIA loss scenarios
- Risk owner
- Accountable for a specific risk
- Analyze risk
- Estimate consequences, likelihood and level
- Evaluate risk
- Compare criteria and prioritize treatment
- Residual risk
- Risk remaining after treatment
- 6.1.3 Risk owner approval
- Approve plan and accept residual risks
Competence vs Awareness
Competence
- Ability to perform assigned work
- Retain evidence of competence
Awareness
- Understand policy and personal contribution
- Know consequences of failing requirements
Test capability and reinforce responsibilities
Choose an Implementation Action
- Personnel lack role skills→Build or acquire competence(Evaluate effectiveness of actions)
- Personnel misunderstand policy→Run targeted awareness(Explain individual responsibilities)
- Multiple policy versions circulate→Control documented information(Identify approved version)
- Staff see a suspicious event→Use reporting channel A.6.8(Triage reported events)
- Incident response is needed→Apply response procedures A.5.26(Retain response records)
- Significant system change planned→Reassess affected risks(Clause 8.2)
- Plan calls for recovery evidence→Exercise recovery arrangements(Record restoration results)
Support and Operation
- 7.2 Competence
- Retain evidence of relevant competence
- 7.3 Awareness
- Explain policy, contribution and consequences
- 7.4 Communication
- Define what, when, whom, how
- 7.5 Documented information
- Control access, revisions and retention
- 8.1 Operational control
- Set process criteria and track changes
- External processes and services
- Control those relevant to ISMS
- 8.2 Risk reassessment
- Scheduled and significant-change triggers
- 8.3 Risk treatment
- Implement plan and retain results
Annex A Control Examples
- A.5.23 Cloud services
- Govern acquisition, use and exit
- A.5.26 Incident response
- Apply documented response procedures
- A.5.30 ICT readiness
- Test continuity of ICT services
- A.6.3 Security awareness
- Role-appropriate education and training
- A.6.8 Event reporting
- Provide timely reporting channels
- A.7.4 Physical monitoring
- Detect unauthorized physical access
- A.8.9 Configuration management
- Define and monitor secure configurations
- A.8.13 Backup
- Test recovery from maintained backups
- A.8.16 Monitoring activities
- Detect anomalous system activity
- A.8.28 Secure coding
- Apply secure development practices
Control Implementation Evidence
- Access rights
- Approvals and access review records
- Cloud supplier controls
- Contracts and responsibility assignments
- Incident handling
- Triage, decisions and response records
- Recovery exercise
- Restoration results against recovery objectives
- Awareness program
- Training records and knowledge checks
- Approved configurations
- Baselines and change approvals
Internal Audit vs Management Review
Internal audit
- Evaluate evidence against criteria
- Ensure impartial auditor selection
Management review
- Top management evaluates ISMS
- Decide on improvements and changes
Audit results inform management review
Choose an Evaluation Method
- Need to quantify control performance→Measure against defined criteria(9.1 monitoring and measurement)
- Need impartial conformity evaluation→Conduct an internal audit(9.2 internal audit)
- Leadership must review ISMS effectiveness→Hold management review(9.3 management review)
- Audit identifies unmet requirement→Start nonconformity response(10.2 corrective action process)
- Need to verify corrective action→Review effectiveness evidence(Check for repeat failures)
- Starting third-party certification audit→Prepare for Stage 1(Provide scope and documentation)
Performance Evidence
- 9.1 Measure definition
- What, method, timing and responsibilities
- 9.1 Evaluate results
- Assess performance and ISMS effectiveness
- Measurement evidence
- Retain results for evaluation
- 9.2 Audit program
- Consider process importance, previous results
- Audit scope and criteria
- Set for each internal audit
- Auditor selection
- Ensure objectivity and impartiality
- Audit records
- Retain program and audit results
- Audit finding
- Evidence evaluated against audit criteria
Management Review
- 9.3 Review owner
- Top management at planned intervals
- Previous actions
- Check status from earlier reviews
- Context changes
- Review issues and interested-party changes
- Performance trends
- Measurements, audits, nonconformities, corrective actions
- Interested-party feedback
- Review relevant stakeholder feedback
- Risk inputs
- Assessment results and treatment status
- Improvement opportunities
- Consider opportunities for ongoing improvement
- Review outputs
- Record decisions on improvements, changes
Corrective Action Sequence
Contain, find causes, act, check, record
Correction vs Corrective Action
Correction
- Fix the detected issue
- Example: revoke one stale account
Corrective action
- Address cause to prevent recurrence
- Example: fix offboarding workflow
Verify the corrective action worked
Nonconformity Response
- Nonconformity
- A requirement is unmet
- Major nonconformity
- Affects capability to achieve intended results
- Minor nonconformity
- ISMS can still achieve results
- 10.2 Immediate response
- Control issue and address consequences
- Evaluate need for action
- Review causes and similar failures
- Verify effectiveness
- Assess evidence after corrective action
- Retained records
- Issue, actions taken and results
Improvement Evidence
- 10.1 Continual improvement
- Improve suitability, adequacy and effectiveness
- Repeat findings
- Check for systemic weaknesses
- Corrective action owner
- Assign responsibility for delivery
- Closure evidence
- Record outcomes and effectiveness review
- ISMS changes
- Update affected processes when needed
Audit Evidence Sources
Read the record, ask the owner, watch the work
Stage 1 vs Stage 2
Stage 1
- Evaluate readiness for Stage 2
- Review scope and documentation
Stage 2
- Evaluate implementation and effectiveness
- Sample operations and records
Prepare evidence of controls operating
Certification Audit Cycle
- Certification body
- Audits the organization’s ISMS
- Stage 1 output
- Readiness findings and Stage 2 planning
- Stage 2 focus
- Conformity and effective implementation
- Audit follow-up
- Provide evidence addressing findings
- Surveillance
- Check ongoing conformity during cycle
- Recertification
- Reassess ISMS for certification renewal
Evidence for the Certification Audit
- Scope statement
- Defines the audit boundary
- SoA and treatment plan
- Trace control and treatment decisions
- Control operation
- Show records and actual practices
- Internal audit records
- Show coverage, findings and reporting
- Management review records
- Show decisions about ISMS changes
- Corrective action records
- Show responses and effectiveness checks
Common Traps
Annex A selection
Required Annex A comparison ≠ Universal implementation of every control
Control status
Selected and justified control ≠ Implemented and operating control
Risk ownership
Implements the control ≠ Accepts the residual risk
Climate amendment
Evaluate climate change relevance ≠ Assume climate change automatically relevant
Risk review trigger
Planned intervals and significant changes ≠ Calendar as the sole trigger
Audit severity
Single isolated issue ≠ Automatic minor classification
Credential scope
PECB certifies individual practitioners ≠ Certification body certifies organizational ISMS
Exam vs credential
Passing the PECB exam ≠ Meeting all credential requirements
Last Minute
- 1.Use the English multiple-choice blueprint
- 2.Clauses 4–10 apply to conformity
- 3.Determine climate relevance under 4.1
- 4.Document ISMS boundaries and dependencies
- 5.Analyze likelihood and consequences
- 6.Evaluate risk against predefined criteria
- 7.Cross-check necessary controls against Annex A
- 8.Justify exclusions and track implementation
- 9.Risk owners accept residual risks
- 10.Reassess when significant changes arise
- 11.Internal audit informs management review
- 12.Verify corrective action effectiveness
- 13.Stage 2 tests actual implementation
Explore More PECB Certifications
Continue into nearby exams from the same family. Each card keeps practice questions, study guides, flashcards, videos, and articles in one place.
