Cheat sheet

ISO/IEC 27001 Lead Implementer Cheat Sheet

Quick Facts

Exam owner
PECB
Exam scope
English multiple-choice exam
Question count
80 questions
Time limit
3 hours
Passing score
70%
Reference policy
Open book
Question styles
Stand-alone and scenario-based
Choices per question
Three, one correct
Exam blueprint
PECB handbook v1.5 (2026)
ISMS standard
ISO/IEC 27001:2022
Current amendment
2024 climate action amendment

CIA Triad

Who sees it, is it right, can they use it?

Confidentiality: authorized accessIntegrity: accurate and completeAvailability: usable on demand

Threat vs Vulnerability

Threat

  • Potential cause of harm
  • Example: malicious insider

Vulnerability

  • Weakness a threat can exploit
  • Example: excessive permissions

Assess the resulting risk scenario

Information Security Basics

ISMS
Information security management system
Information asset
Information valuable to the organization
Confidentiality
Access limited to authorized parties
Integrity
Accuracy and completeness
Availability
Usable on authorized demand
Impact
Consequence if risk materializes
Information security control
Measure that modifies risk
Security incident
Events likely to compromise security

Standards by Purpose

ISO/IEC 27000:2026
ISMS standards overview
ISO/IEC 27001:2022
ISMS requirements
ISO/IEC 27002:2022
Information security control guidance
ISO/IEC 27003
ISMS implementation guidance
ISO/IEC 27004
ISMS measurement and evaluation guidance
ISO/IEC 27005:2022
Information security risk guidance
ISO/IEC 27006-1:2024
ISMS certification body requirements

Clause Order

Context Leads Plans, Supports Operations, Evaluates, Improves

4 Context5 Leadership6 Planning7 Support8 Operation9 Performance evaluation10 Improvement

Requirements vs Control Guidance

ISO/IEC 27001

  • Requirements for an ISMS
  • Basis for organizational certification

ISO/IEC 27002

  • Guidance for implementing controls
  • Reference for control selection

Use 27001 as conformity criteria

Clauses 4–10

4 Context
Issues, interested parties, scope
5 Leadership
Commitment, policy, roles
6 Planning
Risks, objectives, planned changes
7 Support
Resources, competence, communication, documentation
8 Operation
Run processes and implement treatment
9 Performance evaluation
Measure, audit, review
10 Improvement
Improve and address nonconformities
Conformity claim
All requirements in clauses 4–10

Annex A Themes

A.5 Organizational
37 controls
A.6 People
8 controls
A.7 Physical
14 controls
A.8 Technological
34 controls
Annex A total
93 reference controls
Annex A comparison
Check for missing necessary controls
Additional controls
Design or source as needed

Security Services

Authentication
Verify a claimed identity
Authorization
Determine permitted actions
Boundary controls
Restrict traffic between security zones
Encryption
Protect confidentiality of information
Integrity checks
Detect unauthorized changes
Audit logging
Record events for traceability

SoA vs Risk Treatment Plan

Statement of Applicability

  • Necessary controls and inclusion rationale
  • Actual implementation status
  • Justified Annex A exclusions

Risk treatment plan

  • Actions to implement treatment
  • Track who does what when
  • Risk owners approve plan

SoA records selection and status

Choose a Risk Treatment

  1. Risky activity can be stopped→Avoid risk(Stop or omit the activity)
  2. Controls can lower risk→Modify risk(Reduce likelihood or consequences)
  3. Another party can share exposure→Share risk(Insurance or contract)
  4. Remaining risk meets criteria→Retain risk(Obtain risk owner acceptance)
  5. Selecting treatment for prioritized risks→Consider combined treatment options(Example: modify and share)
  6. Ready to authorize treatment→Get risk owner approval(Cover plan and residual risks)

Scope and Project Planning

4.1 Context
Identify relevant internal, external issues
4.1 Climate change
Determine relevance of climate change
4.2 Interested parties
Identify relevant parties and requirements
4.2 Climate note
Parties may have climate-related requirements
4.3 Scope
Document boundaries, interfaces and dependencies
Gap analysis
Compare current state with requirements
5.1 Top management
Set direction and provide resources
5.2 Security policy
Frame objectives, commitments and improvement
6.2 Security objectives
Set, document and monitor objectives
6.3 ISMS changes
Plan changes before carrying them out

Build the SoA

  1. Treatment option selected→Determine necessary controls(Start from treatment needs)
  2. Necessary controls identified→Compare against Annex A(Check omissions)
  3. Control is necessary→Record inclusion rationale(State why control is needed)
  4. Necessary control outside Annex A→Include in SoA(Justify inclusion)
  5. Annex A control is unnecessary→Document exclusion rationale(Explain why it is unnecessary)
  6. Necessary control is planned→Record actual implementation status(Track delivery in treatment plan)
  7. Scope or risks change→Recheck control selection(Update affected records)

Risk Assessment Artifacts

6.1.2 Assessment criteria
Define assessment and acceptance criteria
Repeatable assessment
Seek consistent, valid, comparable results
Identify risks
Find CIA loss scenarios
Risk owner
Accountable for a specific risk
Analyze risk
Estimate consequences, likelihood and level
Evaluate risk
Compare criteria and prioritize treatment
Residual risk
Risk remaining after treatment
6.1.3 Risk owner approval
Approve plan and accept residual risks

Competence vs Awareness

Competence

  • Ability to perform assigned work
  • Retain evidence of competence

Awareness

  • Understand policy and personal contribution
  • Know consequences of failing requirements

Test capability and reinforce responsibilities

Choose an Implementation Action

  1. Personnel lack role skills→Build or acquire competence(Evaluate effectiveness of actions)
  2. Personnel misunderstand policy→Run targeted awareness(Explain individual responsibilities)
  3. Multiple policy versions circulate→Control documented information(Identify approved version)
  4. Staff see a suspicious event→Use reporting channel A.6.8(Triage reported events)
  5. Incident response is needed→Apply response procedures A.5.26(Retain response records)
  6. Significant system change planned→Reassess affected risks(Clause 8.2)
  7. Plan calls for recovery evidence→Exercise recovery arrangements(Record restoration results)

Support and Operation

7.2 Competence
Retain evidence of relevant competence
7.3 Awareness
Explain policy, contribution and consequences
7.4 Communication
Define what, when, whom, how
7.5 Documented information
Control access, revisions and retention
8.1 Operational control
Set process criteria and track changes
External processes and services
Control those relevant to ISMS
8.2 Risk reassessment
Scheduled and significant-change triggers
8.3 Risk treatment
Implement plan and retain results

Annex A Control Examples

A.5.23 Cloud services
Govern acquisition, use and exit
A.5.26 Incident response
Apply documented response procedures
A.5.30 ICT readiness
Test continuity of ICT services
A.6.3 Security awareness
Role-appropriate education and training
A.6.8 Event reporting
Provide timely reporting channels
A.7.4 Physical monitoring
Detect unauthorized physical access
A.8.9 Configuration management
Define and monitor secure configurations
A.8.13 Backup
Test recovery from maintained backups
A.8.16 Monitoring activities
Detect anomalous system activity
A.8.28 Secure coding
Apply secure development practices

Control Implementation Evidence

Access rights
Approvals and access review records
Cloud supplier controls
Contracts and responsibility assignments
Incident handling
Triage, decisions and response records
Recovery exercise
Restoration results against recovery objectives
Awareness program
Training records and knowledge checks
Approved configurations
Baselines and change approvals

Internal Audit vs Management Review

Internal audit

  • Evaluate evidence against criteria
  • Ensure impartial auditor selection

Management review

  • Top management evaluates ISMS
  • Decide on improvements and changes

Audit results inform management review

Choose an Evaluation Method

  1. Need to quantify control performance→Measure against defined criteria(9.1 monitoring and measurement)
  2. Need impartial conformity evaluation→Conduct an internal audit(9.2 internal audit)
  3. Leadership must review ISMS effectiveness→Hold management review(9.3 management review)
  4. Audit identifies unmet requirement→Start nonconformity response(10.2 corrective action process)
  5. Need to verify corrective action→Review effectiveness evidence(Check for repeat failures)
  6. Starting third-party certification audit→Prepare for Stage 1(Provide scope and documentation)

Performance Evidence

9.1 Measure definition
What, method, timing and responsibilities
9.1 Evaluate results
Assess performance and ISMS effectiveness
Measurement evidence
Retain results for evaluation
9.2 Audit program
Consider process importance, previous results
Audit scope and criteria
Set for each internal audit
Auditor selection
Ensure objectivity and impartiality
Audit records
Retain program and audit results
Audit finding
Evidence evaluated against audit criteria

Management Review

9.3 Review owner
Top management at planned intervals
Previous actions
Check status from earlier reviews
Context changes
Review issues and interested-party changes
Performance trends
Measurements, audits, nonconformities, corrective actions
Interested-party feedback
Review relevant stakeholder feedback
Risk inputs
Assessment results and treatment status
Improvement opportunities
Consider opportunities for ongoing improvement
Review outputs
Record decisions on improvements, changes

Corrective Action Sequence

Contain, find causes, act, check, record

Control the issueAssess causes and similar issuesImplement needed actionsVerify effectivenessKeep evidence

Correction vs Corrective Action

Correction

  • Fix the detected issue
  • Example: revoke one stale account

Corrective action

  • Address cause to prevent recurrence
  • Example: fix offboarding workflow

Verify the corrective action worked

Nonconformity Response

Nonconformity
A requirement is unmet
Major nonconformity
Affects capability to achieve intended results
Minor nonconformity
ISMS can still achieve results
10.2 Immediate response
Control issue and address consequences
Evaluate need for action
Review causes and similar failures
Verify effectiveness
Assess evidence after corrective action
Retained records
Issue, actions taken and results

Improvement Evidence

10.1 Continual improvement
Improve suitability, adequacy and effectiveness
Repeat findings
Check for systemic weaknesses
Corrective action owner
Assign responsibility for delivery
Closure evidence
Record outcomes and effectiveness review
ISMS changes
Update affected processes when needed

Audit Evidence Sources

Read the record, ask the owner, watch the work

RecordsInterviewsObservation

Stage 1 vs Stage 2

Stage 1

  • Evaluate readiness for Stage 2
  • Review scope and documentation

Stage 2

  • Evaluate implementation and effectiveness
  • Sample operations and records

Prepare evidence of controls operating

Certification Audit Cycle

Certification body
Audits the organization’s ISMS
Stage 1 output
Readiness findings and Stage 2 planning
Stage 2 focus
Conformity and effective implementation
Audit follow-up
Provide evidence addressing findings
Surveillance
Check ongoing conformity during cycle
Recertification
Reassess ISMS for certification renewal

Evidence for the Certification Audit

Scope statement
Defines the audit boundary
SoA and treatment plan
Trace control and treatment decisions
Control operation
Show records and actual practices
Internal audit records
Show coverage, findings and reporting
Management review records
Show decisions about ISMS changes
Corrective action records
Show responses and effectiveness checks

Common Traps

Annex A selection

Required Annex A comparison ≠ Universal implementation of every control

Control status

Selected and justified control ≠ Implemented and operating control

Risk ownership

Implements the control ≠ Accepts the residual risk

Climate amendment

Evaluate climate change relevance ≠ Assume climate change automatically relevant

Risk review trigger

Planned intervals and significant changes ≠ Calendar as the sole trigger

Audit severity

Single isolated issue ≠ Automatic minor classification

Credential scope

PECB certifies individual practitioners ≠ Certification body certifies organizational ISMS

Exam vs credential

Passing the PECB exam ≠ Meeting all credential requirements

Last Minute

  1. 1.Use the English multiple-choice blueprint
  2. 2.Clauses 4–10 apply to conformity
  3. 3.Determine climate relevance under 4.1
  4. 4.Document ISMS boundaries and dependencies
  5. 5.Analyze likelihood and consequences
  6. 6.Evaluate risk against predefined criteria
  7. 7.Cross-check necessary controls against Annex A
  8. 8.Justify exclusions and track implementation
  9. 9.Risk owners accept residual risks
  10. 10.Reassess when significant changes arise
  11. 11.Internal audit informs management review
  12. 12.Verify corrective action effectiveness
  13. 13.Stage 2 tests actual implementation
Same family resources

Explore More PECB Certifications

Continue into nearby exams from the same family. Each card keeps practice questions, study guides, flashcards, videos, and articles in one place.