3.3 Analyzing Cause-and-Effect Relationships and Sequential Procedures
Key Takeaways
Levels E and M emphasize relationships in historical, scientific and technical texts. Level D adds connections and distinctions, and Level A asks how events, ideas and individuals interact and develop.
Sequence establishes order. A cause also requires a mechanism or a stated link in the text.
Track immediate effects, contributing conditions and further consequences separately.
In procedures, identify prerequisites, actions that overlap, and exceptions or recovery steps that apply only under certain conditions.
Analyzing Cause-and-Effect Relationships and Sequential Procedures
A sequence tells you what happened or what must happen first. A causal explanation tells you how or why one event brings about another. These relationships often occur in the same passage.
The TABE 13 & 14 Reading blueprints list both 2.RI.3 and 3.RI.3 at Level E, and 4.RI.3 at Level M, for relationships in historical, scientific and technical texts. At Level D, 8.RI.3 asks how a text connects or distinguishes ideas, events or people. At Level A, 11–12.RI.3 asks how participants, ideas and events interact and develop across a complex sequence.
Causes, Conditions and Consequences
An immediate cause directly brings about an effect described in the text. Other factors can contribute by helping the effect occur or making it more likely. A text may name several causes without establishing whether any one cause was required in every case. Keep the explanation within what the text says.
In a chain, an effect at one stage becomes a cause at the next. The National Weather Service explains that surfaces can cool at night as they lose heat. If an above-freezing surface cools below the dew point of the surrounding air, water vapor can condense into liquid droplets on it. Surface cooling comes before condensation. The droplets form because the cooling allows condensation, so overnight timing alone is an incomplete explanation.
| Text cue | Relationship to check | Reading task |
|---|---|---|
| before, then, after | Order | Identify what comes first and whether the text also gives a reason. |
| while, meanwhile, during | Overlap or contrast | Decide whether time overlaps or two situations are being contrasted. |
| because, as a result, led to | Claimed cause or outcome | Put each part on the appropriate side of the causal link. Check what evidence supports it. |
| only after, unless, if | Condition or branch | Identify which action depends on the condition and how the text handles the alternative. |
For example, “Since Monday the desk has closed early” gives a time span. “The desk closed early since no clerk could stay” supplies a reason. Use the whole clause to decide what a cue word is doing.
Historical Sequence and Changing Relationships
The Pony Express began carrying mail in April 1860. Congress authorized support for a transcontinental telegraph that June. As the line was being built, Pony Express riders continued carrying mail. Telegrams could travel only along completed stretches of wire. The completion of the transcontinental line in October 1861 made rapid coast-to-coast messaging possible and helped end the Pony Express. Some of its last letters reached their destinations in November. The National Park Service trail history, trail timeline and Library of Congress timeline distinguish those milestones.
Compare the two systems during construction and after completion. Before the build linked the coasts, the two systems could cover different parts of a route. After the line was connected, messages no longer needed a rider to cross the unwired stretches. The meaningful connection is how the line’s progress changed the role of the relay service. November delivery dates alone do not tell you when the service stopped accepting new mail.
Worked Procedure: Validation of a Traffic-Count Report
Read the following fictional instructions for preparing a monthly report.
Export the counter’s file and check that it includes every date in the reporting period. If any date is missing, request a corrected export and repeat the date check. After the dates are complete, compare the station code in the file with the code on the assignment sheet. If the codes differ, ask the field team to identify the correct file and restart the checks. When both checks pass, calculate the station total and submit it for review. The review team locks the month’s reporting table once it posts the approved total. A correction after posting requires the review team to reopen the table.
Trace the Normal Path and the Branches
- Normal path: Obtain the file, check dates, match the station, calculate the total and submit for review. Posting follows approval.
- Missing-date branch: Request a corrected file and repeat the date check. A file with the right station code can still fail the date check.
- Mismatched-station branch: Ask the field team for the correct file and restart the checks. Complete dates already checked on the first file do not establish the second file’s dates.
- Consequence of a discovered error after posting: The posted total is already in a locked table. The review team must reopen the table before a correction can be made.
For a question about distinctions, compare the branch conditions and who acts in each case. For a question about interactions, follow how the analyst’s checks affect the field team’s work and ultimately the review team’s control of the posted report. For a question about cause, find the link that explains the extra step: posting locks the table, so reopening it becomes necessary for a later correction.
In the fictional instructions, what triggers a request for a corrected export and another date check?
The review team posts the approved total.
The station has the same code as the assignment.
The station total is ready to submit.
The file is missing a date from the reporting period.
In the normal path, which check immediately precedes calculation after the file passes the date check?
Ask the review team to reopen the monthly table.
Compare the file’s station code with the assignment sheet.
Post the approved total.
Request a corrected export even though all dates are present.
What additional step does the procedure require if an error is discovered after the approved total is posted?
The field team must change the code on the assignment sheet.
The analyst can replace the total in the locked table immediately.
The review team must reopen the table before the correction.
The analyst must remove an unrelated date from the file.
Sections you finish are checked off in the contents.