LCP supervision and clear project communication

Key Takeaways

  • Employees need instructions, their supervising LCP's name, and a working contact method.

  • LCB's supervision rule includes communication within an hour and an unavailable LCP returning the call by the end of the day.

  • Record decisions and communicate approved changes to the people actually performing the work.

Last updated: October 2026

Supervision must cover the work

An unlicensed construction worker must be employed by the licensed landscape contracting business and directly supervised by an LCP licensed for the phase being performed. The LRB guide defines direct supervision through project instruction, knowledge of the LCP by name, knowledge of how to contact that person, and ability to communicate within an hour; if unavailable, the LCP must return the employee's call by the end of the day. This is an operating obligation, not merely a licensing application entry.

Assign the supervisor before mobilization. Explain the current drawing, materials, grades, limits of work, hazards, and inspection points. Confirm comprehension by having the worker describe the planned task and what conditions require stopping. An instruction such as “finish the wall” leaves unanswered its bottom elevation, drainage detail, reinforcement, and whether an inspection is required before backfilling.

The supervising phase must fit the task. A Planting Only LCP cannot independently direct irrigation installation outside that phase. An LCP working beyond the individual's phase requires the applicable direct supervision. A company with multiple crews needs a contact and coverage arrangement that actually works for all of them. Test the communication method at a remote or low-signal site rather than discover its failure after the crew encounters a buried facility.

Instructions and stop points

Use a short pre-task briefing to identify the task, accepted detail, tools, hazards, quality checks, and stop points. For a paver project, stop points might include subgrade acceptance, drainage-slope confirmation, base density where specified, and restraint installation. For irrigation, include utility clearance, pipe material, joint cure, flushing, water testing, and controller commissioning. The exact checks change by task; repeating the same generic checklist for every job does not establish competent supervision.

Workers should stop when field conditions contradict the design. Examples include water entering a wall excavation, a plant root flare hidden far below nursery soil, a missing locate mark near a gas meter, or a foundation discovered under a proposed trench. Communicate the evidence and the location. The LCP should determine whether to inspect, obtain a design revision, contact the authority, or change sequencing before the crew improvises a hidden defect.

Use photographs with scale, marked plan locations, and measured elevations rather than descriptions such as “the hole looks wet.” Record who made a decision and which revision authorizes it. An instruction sent privately to one foreman can fail if another crew works from an old plan the next morning. Distribute the accepted revision, remove obsolete copies from active use, and verify that quantities and cost assumptions were updated.

Customer communication and changes

Explain scope, schedule, access, noise, watering responsibility, and site protection before work. Translate technical consequences into practical choices. If a patio cannot drain toward the planned outlet, show the elevations and explain the needed correction rather than merely call the original design “wrong.” Distinguish an observed fact from a proposed solution and identify any price or schedule effect.

LCB requires written, mutually agreed changes; the customer and business do not need signatures on every change order when another written agreement documents acceptance. Preserve the accepted text or email, revised material specification, and affected drawing. A conversation with a tenant or neighbor is not necessarily authorization from the contracting owner. Confirm who has authority to approve scope and price.

Listening is part of estimating and dispute prevention. Repeat the customer's requested outcome in concrete terms, such as a dry walking surface after ordinary rain or a low-maintenance planting with specified summer irrigation. Avoid promising “maintenance free” or guaranteed drainage under every storm. State the design assumptions and what happens when they are exceeded, including overflow routes and maintenance needs.

Closeout and future responsibility

At completion, walk the work with the customer, record unfinished items, provide instructions, and explain guarantees. Show isolation valves, controller programs, drain cleanouts, and any components requiring periodic testing. Have the customer demonstrate essential operations where possible. A printed manual left in a wet valve box is unlikely to support successful maintenance.

Document final settings and photographs before the owner changes them. Record planting quantities and substitutions, actual pipe or wire locations, and the contact for a problem. A later brown patch can result from a closed supply valve, plugged nozzle, changed program, or installation fault; good closeout evidence speeds diagnosis. LCB's LRB guide describes the supervision and communication expectations that support this workflow.

Field application

For an absent LCP, identify coverage before the crew starts and confirm the substitute holds the required phase. A voicemail box full of old messages is not a working contact system. At a low-signal site, establish an alternate communication method and a stop-work instruction if it fails. The requirement concerns actual instructions and availability; documenting a name alone does not demonstrate the crew can obtain a decision.

Reference table

Crew questionRequired working answer
Who supervises?Named LCP with appropriate phase
What is authorized?Current instructions and accepted revision
How do we obtain a decision?Working contact method and rule-compliant availability
What changes are approved?Preserved written mutual agreement
Test Your Knowledge

Which arrangement supports LCB's direct-supervision requirement?

A

Only a name on the license application

B

A licensed supervisor in an unrelated phase with no contact method

C

The crew has project instruction, knows the supervising LCP by name, and can contact that person under the rule

D

Unlicensed independent workers issued Form 1099