18.3 Constant BHP Circulating Kill Procedures for Horizontal Wells
Key Takeaways
Track lateral and build/vertical transit with the surveyed profile and actual volumes. Constant lateral TVD limits the elevation contribution but does not guarantee flat gas volume, casing pressure or pit volume.
Use the selected kill method and verified pressure reference to control BHP throughout circulation. Choke adjustments follow pressure response and lag, not a rule to leave it fixed until the heel.
Gas rising into the build and vertical sections can expand substantially as absolute pressure falls. Anticipate changing return volumes and backpressure; a pressure spike is neither a required nor unique heel-arrival signal.
The Wait-and-Weight schedule uses surveyed TVD and segment capacities plus changing circulating losses. A flat lateral adds no hydrostatic head, but its scheduled drillpipe pressure need not be flat.
Constant-BHP Circulating Kill Procedures for Horizontal Wells
A horizontal well uses the same pressure-balance principles as a vertical well. The long measured path changes volumes and friction; the surveyed vertical profile determines hydrostatic head. Plan the kill with both, rather than treating heel arrival as a switch between two guaranteed pressure patterns.
Follow the Influx Through the Well
Surface / controlled return system
|
| Vertical and build sections:
| gas rises; changing absolute pressure can cause substantial expansion
\\
+---------------------------------------------- Toe / bit
Heel Horizontal lateral
small elevation change, possible segregation
All positions: follow the selected pressure-control reference,
track volumes and monitor formation/equipment/return-system limits.
Lateral Transit
In the ideal flat-lateral hydrostatic model, gas moving at constant TVD does not replace additional vertical mud head. That explains why the initial pressure differential may be small. It does not prove that gas pressure stays constant while circulating: friction, fluid distribution, temperature, dissolution and expansion can change the readings.
Select sufficient flow to sweep gas from the lateral within the pressure window. Compare actual pressures and returns with the prepared model. Do not hold the choke fixed merely because gas is thought to remain below the heel, or open it simply because casing pressure is not rising.
Build and Vertical Transit
As gas rises and its absolute pressure falls, expansion can increase the return volume and the surface backpressure required to maintain BHP. For a fixed amount of free gas: Use absolute pressure and temperature. This relation does not imply exponential expansion with time or a mandatory pressure spike at the heel.
The choke operator follows the selected drillpipe-pressure target or other approved phase reference, allowing for system response lag. Make controlled adjustments based on actual pressure response while monitoring the annular pressure window. A casing-pressure rise with pit gain is consistent with gas expansion, but also requires checking the current fluid positions and other possible causes.
Caution
Neither quiet gauges nor a nominal heel-arrival stroke count permits automatic choke action. Maintain the method’s pressure target and investigate discrepancies; do not force casing pressure to remain at its original shut-in value throughout circulation.
While circulating a gas influx through a horizontal lateral at constant pump flow, which statement correctly guides the choke operator before the influx reaches the heel?
Constant TVD removes an elevation change, but does not guarantee constant casing pressure or pit volume; follow the selected pressure target and monitor actual returns.
Casing pressure rises steadily at 50 psi per 100 strokes while pit volume expands rapidly.
Casing pressure drops to zero immediately upon establishing circulation.
Pit volume drops continuously as gas is compressed into a supercritical fluid.
Select the Kill Method for the Actual Well
Driller’s Method can begin circulation with the available original mud. Wait-and-Weight requires suitable kill mud and a prepared pressure schedule. Choose the approved method after assessing the pressure window, mud availability, gas movement, geometry and equipment; horizontal geometry alone does not establish a universal preference.
| Factor | Driller’s Method | Wait-and-Weight |
|---|---|---|
| Initial circulation | Removes the influx using original mud | Removes the influx while pumping prepared kill mud |
| Preparation | Can start without first weighting the full kill volume | Requires adequate kill mud and the displacement schedule |
| Control reference | First circulation: verified constant drillpipe reference at steady rate; second circulation: casing reference until kill mud reaches bit, then drillpipe FCP | Geometry-dependent drillpipe schedule to bit arrival, then FCP |
| Gas transport | Early circulation may help remove gas; sufficient sweeping velocity is still required | Waiting may allow movement or segregation; manage the shut-in well while preparing mud |
| Weak-zone pressure | Depends on the actual original-mud/influx profile | Kill mud in the annulus may reduce pressure at the controlling zone |
Compare Fluid-Front Timing
Wait-and-Weight can lower shoe pressure if kill mud enters the annulus before the gas reaches the controlling zone. Compare drillstring displacement with the annular route and the actual influx position/expansion. A lateral annular volume larger than drillstring volume does not remove that potential advantage; it may allow kill mud to reach the bit while gas remains below the shoe. Neither method guarantees a particular peak pressure without a fluid-profile calculation.
Construct the Geometry-Dependent Pressure Schedule
For Wait-and-Weight, use surveyed TVD at each fluid-front position, measured-length capacities, pump output and the relevant circulating losses. A straight ICP-to-FCP line is the standard uniform-vertical approximation, not an all-geometry schedule.
At a specified constant flow rate, the pressure balance at the standpipe is: Here is the current drillstring hydrostatic head referred to the standpipe datum. The loss term includes the applicable path from that gauge to the bit. It changes as the two muds displace one another.
A standard segmented calculation using linear hydraulic-loss interpolation is: is drillstring capacity to the kill-mud front, total drillstring capacity, and the front’s vertical depth. This is a calculation approximation; actual fluid rheology and hydraulic conditions must support the selected schedule.
SURFACE TO HEEL: hydrostatic head increases with surveyed TVD;
circulating losses also change.
HEEL TO BIT: a flat lateral adds no vertical head;
circulating losses may still change.
BIT ARRIVAL: the selected schedule reaches FCP.
Thus the hydrostatic part of the step-down ceases in a flat lateral, but the total pressure target need not be flat. In the interpolation above, heavier mud continuing down the lateral increases the loss term. Do not discard that term and impose the hydrostatic-only heel pressure as the final target.
For the standard gas-cleared second Driller’s circulation, use the appropriate casing-pressure reference until kill mud reaches the bit, then hold drillpipe FCP. Monitor the expected drillpipe response and pressure limits throughout; do not substitute the Wait-and-Weight control phase indiscriminately.
When constructing a Wait-and-Weight drillpipe-pressure schedule for a horizontal well, what changes once the kill-mud front enters a truly flat lateral?
The pressure must drop linearly at an accelerated rate of double the initial slope until reaching the bit.
Additional displacement produces no hydrostatic head gain, but changing circulating losses still determine whether the total drillpipe-pressure target is flat or changes.
The pressure must be dropped immediately to zero to prevent fracturing the horizontal formation.
The pressure must follow a parabolic curve based on total measured depth divided by hole diameter.
Extended-Reach Friction and Choke Management
Long, narrow annuli can have significant pressure losses even at a selected kill rate. Spm alone does not establish those losses: pump output, fluid properties, geometry and flow rate are required.
For upward returns to a surface choke gauge: includes the relevant annular and choke-line friction. Add the actual subsea line head and datum conversion where applicable. The flowing casing-gauge reading is not SICP.
On startup, losses develop; on slowdown, they disappear. Coordinate rate and choke backpressure to preserve the required BHP. Holding initial casing pressure is the standard surface-stack startup approximation only when annular losses are negligible. With significant annular friction or subsea CLF, use the appropriate compensated reference, reversing the adjustment on shutdown.
Anticipate Gas Return with Several Measurements
- Calculate displacement estimates: gives strokes to displace one lateral annular volume. Define the counter origin and include actual capacity segments.
- Track the fluid fronts: The gas leading edge may arrive earlier because the influx already occupies part of the annulus, expands or slips. Dispersion can also leave gas behind the nominal front. The volume estimate is not an exact arrival or clearance count.
- Brief before transitions: Use the planned positions and actual trends to keep the choke operator ready. Follow the method’s pressure target with controlled adjustments and response lag; do not apply a universal 90% trigger or prescribed choke opening percentage.
- Monitor the return system: Check the MGS gas/liquid/venting envelope and liquid seal where used. If limits are approached, coordinate rate reduction and backpressure within the well pressure window. If safe handling cannot be maintained, secure the well under the approved contingency; verify the system and pressure reference before resuming.
Worked ERD Planning Example
ILLUSTRATIVE WELL DATA
• Bit: 24,600 ft MD, 8,800 ft TVD
• Heel / shoe: 10,600 ft MD, 8,750 ft TVD
• Lateral measured length: 14,000 ft
• Original mud: 13.0 ppg OBM; shoe integrity equivalent: 15.2 ppg
• SIDPP 420 psi; SICP 425 psi; pit gain 32 bbl
• Original SCR: 850 psi at 25 spm; pump output 0.10 bbl/stroke
• Given average lateral annular capacity: 0.0459 bbl/ft
Under the standard communicating formation-pressure model: The standard ICP estimate is psi. Assess return-path losses before choosing the actual startup reference; the SCR measurement alone does not separate annular losses from drillstring losses.
The lateral displacement estimate is: This is one lateral annular volume, not a guaranteed first-gas arrival. The 50 ft heel-to-toe TVD difference also means the given lateral is slightly toe-down, rather than exactly flat.
The shoe integrity pressure is psi. In a static illustration with constant BHP 6368.8 psi and original mud between shoe and bit, shoe pressure would be: The illustrative margin is psi. As fluids move and circulation losses change, calculate the actual shoe pressure from that current profile. Neither a future peak shoe pressure nor separator capacity can be proved from these data alone.
During circulation, follow the chosen control phase, compare predicted and measured returns and monitor limits. After expected displacement, make a controlled shutdown and verify pressures, fluid density, volumes and no flow. A nominal stroke count alone does not establish that dispersed gas has all been removed.
During the first Driller’s circulation in an extended-reach well, how should the supervisor interpret a casing-pressure rise accompanied by increasing pit volume near the predicted gas arrival at the build section?
The drillpipe pressure suddenly drops to zero, and the mud pump stalls completely.
The active mud pit volume begins decreasing rapidly as fluid is lost into the formation.
The casing pressure begins dropping steadily while drillpipe pressure spikes by 1,000 psi.
The pattern is consistent with expanding gas, but does not uniquely prove heel arrival; compare it with tracked volumes and pressure limits while maintaining the selected drillpipe target.
Sections you finish are checked off in the contents.
You've completed this section
Continue exploring other exams