16.2 Plugged Drillpipe Nozzles, Float Failures & Drillstring Washouts
Key Takeaways
At unchanged actual flow and fluid conditions, a sudden DP-pressure rise with no corresponding casing-pressure rise suggests a nozzle/string restriction. Verify flow, gauges and fluid position; constantSPM alone is insufficient.
After a confirmed partial nozzle restriction, do not reduce BHP to recover an obsolete DP target. Establish the safe revised circulating reference and rebuild the remaining schedule for actual rate, density and fluid fronts.
An unexplained DP-pressure decline can indicate pipe or nozzle washout. Compare the current kill phase, actual output and fluid positions before diagnosing it; continued flow through damaged pipe risks enlargement and parting.
Secure the well for a suspected pipe washout and assess string integrity, pressure communication and the location of the influx. Hang off only when the approved contingency and actual load ratings require and permit it.
A closed unported float can leave zero or unreliable trapped pressure on the DP gauge. Obtain SIDPP by an approved measurement method; a pressure-curve shoulder alone is not an exact static reading.
Plugged Drillpipe Nozzles, Float Failures & Drillstring Washouts
During a well kill, surface pressures depend on actual flow, fluid properties and positions, flow-path restrictions and annular backpressure. When downhole mechanical components fail—such as bit nozzles plugging with debris, the drillpipe parting or washing out, or the bit float valve failing to indicate shut-in pressure—surface gauge readings diverge abruptly from pre-calculated kill sheets.
The supervisor compares deviations with the expected kill-phase pressure and volume trends, checks instruments and actual flow, and applies the contingency procedure while preserving BHP. A gauge pattern is a lead to investigate, not an instant unique diagnosis.
Plugged Bit Nozzles: Hydraulic Mechanics and Schedule Adjustment
Bit nozzles are engineered orifices designed to accelerate drilling fluid into high-velocity jets. The pressure drop across the bit nozzles increases with fluid density and the square of flow rate, and decreases with the square of total flow area for unchanged discharge behaviour:
Here is flow rate, is mud density and is the sum of the open nozzle areas. For unchanged flow, density and discharge coefficient:
Reducing TFA from 0.45 to 0.30 square inches gives a pressure-loss ratio of 2.25; an original 400 psi bit loss becomes 900 psi. Use the applicable nozzle model and units for an absolute pressure-loss calculation.
PLUGGED BIT NOZZLE HYDRAULICS
Normal Circulation: One Nozzle Plugged:
┌───────────────┐ ┌───────────────┐
│ TFA = 0.45 sq │ │ TFA = 0.30 sq │ (Reduced Area)
└───────┬───────┘ └───────┬───────┘
▼ ▼
ΔP_bit = 400 psi ΔP_bit = 900 psi (ΔP_plug = +500 psi)
│ │
▼ ▼
ICP = 1,150 psi ICP_new = 1,650 psi (STEP INCREASE)
Casing P = 600 psi (CONSTANT) Casing P = 600 psi (NO CHANGE!)
Diagnostic Signature of a Plugged Nozzle
At unchanged actual flow and fluid conditions, a sudden drillpipe-pressure rise without a corresponding annulus-pressure rise suggests an added restriction inside the string. Partial nozzle plugging is one possible cause. Confirm pump output, gauges, fluid fronts and returns; constantSPM alone does not prove constant flow. Complete blockage can stop circulation and isolate the drillpipe gauge from the annulus.
The Fatal Error: Throttling the Choke
When drillpipe pressure suddenly spikes by , an inexperienced driller or choke operator may instinctively open the hydraulic choke to bring drillpipe pressure back down to the target value on the kill sheet graph.
Caution
Do not open the choke merely to force drillpipe pressure back to an obsolete target after a confirmed nozzle restriction. At unchanged actual flow, the extra pressure is consumed inside the string; lowering annulus backpressure would reduce BHP and can admit further influx.
Re-establishing the Circulating Schedule
Make a controlled shutdown when required to diagnose the restriction and preserve pressure limits. Check whether the string still communicates with the well; a completely plugged string cannot supply normal static SIDPP or a conventional circulating kill path.
For a partial restriction that permits safe circulation, establish a new circulating reference at the chosen actual flow while maintaining the appropriate BHP reference during startup. Rebuild the remaining pressure schedule for the current fluid fronts, density and rate, including subsea CLF compensation where applicable.
At an unchanged flow and density, an additional measured restriction loss can be added to the corresponding current target. It is not automatically a constant addition to all later targets: nozzle loss changes with density and flow. Monitor for the plug clearing, which would invalidate the increased target again.
Drillstring Washouts: Recognition, Hazards, and Emergency Isolation
A drillstring washout occurs when drilling mud erodes a cavity through a tool joint connection, pin-box thread, or cracked drillpipe body, creating an unintended flow communication path between the inside of the drillstring and the annulus.
DRILLSTRING WASHOUT MECHANICS
[Standpipe Manifold]
│
▼
[Drillpipe Bore]
│
WASHOUT HOLE
┌──────────────┴──────────────┐
▼ ▼
[Flow Escapes into Annulus] [Reduced Flow to Bit]
│ │
▼ ▼
Drillpipe Pressure Bit Pressure Drop
DROPS STEADILY COLLAPSES
│ │
└──────────────┬──────────────┘
│
▼
[Catastrophic Twist-Off Threat under Tension]
Diagnostic Signature of a Washout
At unchanged actual flow and fluid conditions, an unexplained drillpipe-pressure decline without a corresponding casing-pressure decline suggests reduced drillstring/bit resistance. A pipe washout, nozzle erosion or another restriction change can produce this pattern. Normal kill-mud displacement can also reduce drillpipe pressure, so compare the reading with the current method phase and fluid-front position.
| Change from the expected trend | Possible cause | First response |
|---|---|---|
| DP rises; casing approximately unchanged | Partial nozzle/string restriction | Preserve BHP, check flow and instruments; establish a safe revised reference. |
| DP falls; casing approximately unchanged | Pipe/nozzle washout or changed flow/fluid | Check actual output and fluid position; secure the well for diagnosis if unexplained. |
| Both pressures rise and choke opening does not restore control | Choke/return-path obstruction | Controlled shutdown before pressure limits are exceeded; establish an available safe path. |
| Both pressures fall and choke closure cannot maintain control | Choke erosion/leak or another loss of backpressure | Secure the well and use the planned standby/isolation response. |
| Unexpected gain or return-flow change | Possible additional influx | Apply the kick/contingency response; a pressure pattern alone cannot exclude influx. |
Pipe-Parting Risk and Response
A pipe washout can enlarge under abrasive flow and weaken a connection or pipe body. Continued circulation may lead to parting; the rate of damage and remaining strength are not known from the surface pressure decline. Losing the lower string can remove access to the bit and constrain the available kill methods.
- Make a controlled pump shutdown and shut in under the established procedure, preserving well support while friction pressure decays.
- Check instruments, actual pump output and fluid-front position. Distinguish a possible pipe washout from nozzle erosion or a normal scheduled pressure decline.
- Assess string integrity and loads. Hang off only if required by the approved contingency and within the actual ram, pipe, tooljoint and load ratings; it is not an automatic step on every floating rig.
- Determine whether the suspected hole lies above or below the influx and whether SIDPP still represents the bottomhole pressure. Pressure readings and fluid profiles may constrain its location but do not uniquely locate it; any further diagnostic intervention requires its own planned pressure-control arrangement.
- Reassess the kill method. A leak above the influx can invalidate conventional DP-pressure control of BHP. Use the appropriate off-bottom/migration contingency when communication is unsuitable. Do not resume merely because the gauges are stable.
Bit Float Valve Diagnostics: Obtaining SIDPP
A drillstring float is a check valve that restricts reverse flow. An unported closed float can isolate the standpipe gauge, leaving zero or a trapped nonzero reading. Neither is automatically true SIDPP. A float not sealing may allow reverse communication, so use the known valve type and observed behaviour rather than assuming every installed float holds.
CLOSED UNPORTED FLOAT -> standpipe gauge may be isolated
-> use approved measurement method
-> record the pressure reference and validity checks
One method uses a recent SCR measurement for the same pump, actual flow, fluid and string configuration:
- Verify equipment alignment, suitable communicating gauges and stabilized casing-pressure history.
- Start circulation cautiously, coordinating the choke to preserve BHP. The surface-stack approximation holds the initial casing reference when annular friction is negligible; subsea choke returns require compensation for developing CLF.
- At the selected recorded low flow, estimate SIDPP as stabilized circulating standpipe pressure minus the corresponding original-mud SCR pressure.
- Shut down in a controlled manner while preserving well support, and record the result and method. The gauge may become isolated again as the float closes.
Where appropriate, use the approved slow bump/breakback procedure instead. A change of slope can help identify float opening, but it is not by itself an exact static SIDPP: opening resistance, fluid compression and dynamic losses need the method's checks. Do not prescribe a universal 0.10–0.25 bpm rate, quarter-barrel strokes or 100–150 psi spring correction. Confirm pump pressure rating and controllable output; an ordinary trip-tank pump is not automatically suitable for high-pressure injection.
Worked Scenario: Partial Nozzle Restriction During the Driller's Method
TVD 11200 ft; MD 16500 ft; OMW 13.2 ppg; verified SIDPP 450 psi.
Recorded SCR at the selected actual flow:650 psi; ICP=450+650=1100 psi.
Calculated KMW=13.2+450/(0.052 x 11200)=13.973 ppg; planned density 14.0 ppg.
Original FCP estimate=650 x 14.0/13.2=689 psi, before specified rounding/margins.
During the FIRST circulation, all string fluid remains OMW.
DP pressure rises 1100->1480 psi while the confirmed actual flow,
annulus pressure and returns show no corresponding unexpected change.
A partial nozzle restriction is confirmed; equipment limits permit continuation.
Extra current restriction loss=1480-1100=380 psi.
Re-established OMW circulating loss at that flow=650+380=1030 psi.
The current first-circulation DP target is 1480 psi.
At 14.0 ppg throughout the system, the density-scaled loss estimate is:
FCP_new=1030 x 14.0/13.2=1092 psi.
Do not force DP pressure down to 1100 psi by opening the choke. Use the confirmed revised reference and watch for the obstruction clearing. Maintain the first Driller's circulation DP target while removing the influx; casing pressure varies with annular conditions. After gas removal is verified, the second circulation follows its normal phases: preserve the casing-pressure reference while kill mud displaces the string, then use the revised final circulating DP reference once kill mud reaches the bit. Rebuild the transition schedule and margins for actual conditions rather than adding 380 psi to every future target.
During a stable-fluid phase at verified unchanged flow, DP pressure jumps 850 to 1200 psi while casing pressure and returns remain unchanged. A partial nozzle restriction is confirmed. Which response preserves well control?
A secondary gas influx has entered the wellbore; the choke operator must immediately open the choke to restore drillpipe pressure to 850 psi.
A drillstring washout has occurred; the pump rate must be increased to maintain bottomhole pressure.
The choke has washed out; the supervisor must switch to the manual standby choke immediately.
Preserve BHP and establish the safe revised circulating reference; the current target increases by 350 psi, while later targets must account for actual rate, density and fluid-front changes.
Why does an unported drillstring float require an approved SIDPP measurement procedure, and how should a pressure-curve shoulder be interpreted during a slow bump?
Pumping at high speed until casing pressure doubles, indicating bottomhole pressure balance.
Circulating backwards down the annulus until fluid returns through the standpipe manifold.
The closed float can isolate the DP gauge. A shoulder can indicate opening, but the approved procedure must account for valve behaviour and dynamic effects before accepting SIDPP.
Closing the annular preventer and observing when the trip tank level drops by exactly 5 barrels.
With unchanged fluid positions and verified actual pump output, DP pressure falls 250 psi below the expected trend while casing pressure and returns remain steady. What suspected hazard warrants a controlled shutdown and investigation?
A possible drillstring washout, which can weaken and part the pipe; secure the well and investigate the changed hydraulic path.
The kill mud weight was mixed too heavy, requiring immediate dilution with base oil.
The bit nozzles have eroded larger, which is normal and requires increasing the pump SPM by 50%.
Gas is expanding near the surface, requiring the choke to be opened wider to prevent casing burst.