14.2 Vendor Procurement, Purchase Orders & Contract Administration

Key Takeaways

  • The enterprise procurement lifecycle spans eight disciplined phases, beginning with business requisition and sourcing, advancing through evaluation and contracting, and culminating in three-way matching and payment.
  • Procurement solicitations deploy distinct instruments: RFIs gather exploratory market intelligence without pricing commitments, RFPs invite comprehensive solutions for complex needs, and RFQs seek competitive pricing on standardized commodities.
  • A purchase requisition functions purely as an internal request for spending authority, whereas an issued and accepted purchase order establishes an enforceable commercial contract with an external supplier.
  • Commercial contract structures distribute operational risk: Fixed-Price contracts place cost-overrun exposure on the vendor, Time & Materials contracts accommodate evolving scopes, and Cost-Reimbursable contracts absorb emergent uncertainties.
  • Lease versus buy evaluations weigh immediate capital outlay, cash flow liquidity, technological obsolescence risk, and ongoing maintenance obligations against the total lifecycle cost of asset ownership.
Last updated: September 2026

Vendor Procurement, Purchase Orders & Contract Administration

Quick Summary: Corporate procurement is the strategic, cross-functional discipline of acquiring goods, materials, and services necessary to sustain enterprise operations while maximizing financial value, mitigating operational risk, and preserving regulatory compliance. The procurement lifecycle progresses systematically through eight phases: Requisition, Sourcing, Evaluation, Negotiation, Contracting, Purchase Order Issuance, Receipt & Quality Inspection, and Payment Reconciliation. To engage the supplier marketplace effectively, organizations deploy targeted solicitation instruments: Requests for Information (RFIs) to explore market capabilities without financial commitment, Requests for Proposals (RFPs) to evaluate complex technical solutions through competitive bidding, and Requests for Quotations (RFQs) to secure pricing on standardized commodities. Central to administrative workflow is distinguishing between a Purchase Requisition—an internal request for spending authority—and an issued Purchase Order (PO), which forms a legally binding commercial contract upon vendor acceptance. Furthermore, administrative professionals support high-stakes Lease vs. Buy decisions by evaluating capital outlay, cash flow liquidity, technology obsolescence, and maintenance burdens. Long-term supplier partnerships are governed through Vendor Relationship Management (VRM), utilizing Master Service Agreements (MSAs), Statements of Work (SOWs), and Service Level Agreements (SLAs) with strict renewal notice tracking.


The Enterprise Procurement Lifecycle

Procurement encompasses far more than simply placing orders and paying invoices; it is an integrated corporate governance workflow that ensures organizational capital is spent judiciously with vetted commercial partners. The lifecycle follows eight sequential, interconnected stages:

+-------------------------------------------------------------------------+
|                    THE ENTERPRISE PROCUREMENT LIFECYCLE                 |
+-------------------------------------------------------------------------+
|                                                                         |
|   [ 1. REQUISITION ] ───────► Identify business need, define specs,     |
|                               verify departmental budget authority.     |
|         │                                                               |
|         ▼                                                               |
|   [ 2. SOURCING ] ──────────► Scan supplier marketplace, determine      |
|                               solicitation tool (RFI, RFP, RFQ).        |
|         │                                                               |
|         ▼                                                               |
|   [ 3. EVALUATION ] ────────► Screen supplier bids using objective      |
|                               weighted scoring matrices and audits.     |
|         │                                                               |
|         ▼                                                               |
|   [ 4. NEGOTIATION ] ───────► Finalize commercial terms, pricing,       |
|                               delivery windows, warranties, and SLAs.   |
|         │                                                               |
|         ▼                                                               |
|   [ 5. CONTRACTING ] ───────► Draft and execute legal agreements        |
|                               (Master Service Agreements, SOWs).        |
|         │                                                               |
|         ▼                                                               |
|   [ 6. PO ISSUANCE ] ───────► Transmit authorized Purchase Order;       |
|                               encumber committed funds in ERP.          |
|         │                                                               |
|         ▼                                                               |
|   [ 7. RECEIPT & CHECK ] ───► Accept delivery, perform physical count   |
|                               and quality audit, issue Receiving Report.|
|         │                                                               |
|         ▼                                                               |
|   [ 8. PAYMENT ] ───────────► Execute Three-Way Match (PO, Receiving    |
|                               Report, Invoice) and disburse funds.      |
+-------------------------------------------------------------------------+

The Eight Lifecycle Stages in Detail

  1. Requisition: The originating department identifies an operational requirement (e.g., equipment, software, or professional services), compiles preliminary specifications, verifies budgetary availability, and submits an internal purchase requisition for administrative approval.
  2. Sourcing: Procurement personnel determine how to engage the market, reviewing pre-approved vendor lists (AVL) or launching an external market inquiry using structured solicitation instruments.
  3. Evaluation: Cross-functional teams evaluate supplier submissions against documented criteria, assessing technical competency, financial health, past client performance, and total cost of ownership.
  4. Negotiation: The buyer and short-listed vendors refine contractual terms, including unit pricing, volume discounts, payment schedules, intellectual property rights, liability caps, and performance warranties.
  5. Contracting: Legal counsel and procurement leads formalize the commercial relationship, drafting and signing comprehensive bilateral contracts, Master Service Agreements, or detailed Statements of Work.
  6. Purchase Order Issuance: The buyer generates an authorized Purchase Order (PO) and transmits it to the vendor. Concurrently, the organization's financial system encumbers (reserves) the committed budget funds.
  7. Receipt and Quality Inspection: When merchandise arrives at the receiving dock, staff perform physical counts, inspect packages for transit damage, verify serial numbers against the packing slip, and issue a formal Receiving Report.
  8. Invoice Verification and Payment: Accounts payable executes the definitive Three-Way Match—comparing the Purchase Order, the Receiving Report, and the Vendor Invoice. When all three documents agree in quantities, unit pricing, and terms, payment is disbursed according to agreed payment schedules (e.g., Net 30).

Procurement Solicitation Instruments: RFI vs. RFP vs. RFQ

Selecting the correct solicitation document is crucial for achieving the desired procurement outcome while respecting market dynamics and organizational resources. The three primary instruments serve distinct operational functions across different stages of purchasing readiness.

+-------------------------------------------------------------------------+
|               PROCUREMENT SOLICITATION SPECTRUM                         |
+-----------------------+-------------------------------------------------+
| Instrument            | Primary Characteristic & Purchasing Context     |
+-----------------------+-------------------------------------------------+
| Request for           | • High ambiguity; exploratory market research.  |
| Information (RFI)     | • Solicits capabilities, industry trends, ideas.|
|                       | • No pricing; no binding contract awarded.      |
+-----------------------+-------------------------------------------------+
| Request for           | • Complex problem; customized technical solution|
| Proposal (RFP)        | • Detailed scope; qualitative & cost evaluation.|
|                       | • Multi-phase competitive proposal review.      |
+-----------------------+-------------------------------------------------+
| Request for           | • Exact specifications; commodity off-the-shelf.|
| Quotation (RFQ)       | • Pure price competition and delivery speed.    |
|                       | • Rapid award to lowest responsive bidder.      |
+-----------------------+-------------------------------------------------+

1. Request for Information (RFI)

  • Operational Purpose: An exploratory research tool used when an enterprise has an identified business problem or strategic aspiration but lacks comprehensive knowledge of available market solutions, technological capabilities, vendor landscape, or pricing models.
  • Content & Structure: Outlines the high-level business challenge, describes the enterprise operating environment, and poses open-ended questions inviting vendors to explain how their platforms or services could solve the problem.
  • Pricing & Legal Standing: Strictly non-binding and informal. Buyers do not request formal price commitments, and no contract can be awarded directly from an RFI. Responses are analyzed to educate procurement teams and draft subsequent, targeted RFP specifications.

2. Request for Proposal (RFP)

  • Operational Purpose: A comprehensive, formal competitive solicitation deployed when the organization understands its specific requirements and desired outcomes, but requires vendors to propose the technical methodology, architectural design, implementation plan, and commercial fee structure (e.g., deploying enterprise resource planning software, selecting a corporate travel management agency, or engaging architectural firms).
  • Content & Structure: Contains a detailed Statement of Work (SOW), performance criteria, technical requirements, submission deadlines, contractual terms, and explicit scoring weights. Vendors submit extensive multi-part proposals covering corporate qualifications, technical methodology, staffing credentials, risk mitigation, and itemized cost models.
  • Pricing & Legal Standing: Formal and competitive. Vendors are held to their proposed pricing during a specified validity period (e.g., 90 or 120 days). Solicitations lead to competitive presentations, demonstrations, contract negotiations, and formal agreement execution.

3. Request for Quotation (RFQ)

  • Operational Purpose: A streamlined, price-focused solicitation utilized for procuring standardized, off-the-shelf commodity items or routine commercial services where technical specifications, part numbers, quality standards, and delivery quantities are already fully established (e.g., ordering 500 standard computer monitors, 2,000 reams of paper, or routine courier services).
  • Content & Structure: Provides exact part numbers, technical specifications, quantities, required delivery timetables, and shipping terms (e.g., FOB Destination). Little or no narrative methodology is requested.
  • Pricing & Legal Standing: Highly structured and legally actionable. Vendors submit firm, binding unit price quotations. Contract award is awarded primarily to the lowest responsive and responsible bidder that satisfies all mandatory delivery terms.

Visual Reference: Procurement Sourcing Instruments Comparison

Feature / DimensionRequest for Information (RFI)Request for Proposal (RFP)Request for Quotation (RFQ)
Core PurposeMarket intelligence gathering; exploring vendor capabilities and industry trends.Procuring complex, customized technical solutions, professional services, or major projects.Obtaining competitive pricing for standardized, commodity products or routine services.
Buyer Specification LevelLow to conceptual; problem statement is defined, but solution is open.Moderate to high; detailed requirements and desired outcomes are explicitly stated.Complete and rigid; precise part numbers, dimensions, quantities, and standards provided.
Cost / Pricing DataNone requested; general budget ranges may be explored conceptually.Detailed commercial models, fee structures, and milestone pricing schedules requested.Firm, itemized unit prices, volume discounts, freight charges, and payment terms required.
Selection FocusInformation gathering only; no vendor selection or contract award occurs.Weighted evaluation of technical methodology, qualifications, references, and cost.Awarded primarily to the lowest price meeting delivery and specification criteria.
Legal StandingInformal inquiry; non-binding on all parties; cannot form a contract.Formal competitive solicitation; vendor bids remain firm during formal review.Actionable commercial bid; buyer acceptance forms the basis of a binding Purchase Order.

Vendor Evaluation & Weighted Scoring Matrices

To ensure corporate capital is allocated impartially and audit-ready governance is preserved, organizations must avoid subjective or emotional vendor selection. Instead, administrative and procurement teams utilize Weighted Scoring Matrices to grade supplier proposals objectively.

Foundational Vendor Evaluation Dimensions

A comprehensive vendor evaluation examines multiple critical criteria beyond the purchase price:

  • Technical and Functional Competence: The degree to which the proposed solution fulfills stated technical specifications, usability standards, and system performance benchmarks.
  • Financial Viability and Longevity: Reviewing audited financial statements, Dun & Bradstreet credit ratings, annual revenue, and debt ratios to ensure the supplier possesses financial stability and will not become insolvent mid-contract.
  • Past Performance and Client Testimonials: Conducting structured reference checks with existing corporate clients in similar industries to verify delivery reliability, responsiveness, and customer support quality.
  • Total Cost of Ownership (TCO): Quantifying not only the upfront purchase price, but all associated lifecycle expenditures, including software licensing, data migration, user training, maintenance contracts, freight, energy consumption, and decommissioning costs.
  • Corporate Responsibility & Diversity: Assessing supplier Environmental, Social, and Governance (ESG) performance, carbon footprint reduction, and certified supplier diversity credentials (e.g., minority-, woman-, or veteran-owned business enterprises).

Constructing the Weighted Scoring Matrix

  1. Establish Criteria and Weights: The evaluation committee defines evaluation categories and assigns percentage weights based on organizational priorities. The sum of all weights must equal 100% (or 1.0).
  2. Standardize the Scoring Scale: Evaluators score each proposal against individual criteria using a uniform rubric (e.g., 1 = Unacceptable, 3 = Meets Minimum Standards, 5 = Exceeds Standards).
  3. Compute Weighted Scores: The raw score for each criterion is multiplied by its assigned weight. Summing the weighted scores yields the composite score for each competing vendor.
+-------------------------------------------------------------------------+
|                 SAMPLE WEIGHTED VENDOR EVALUATION MATRIX                |
+-----------------------+--------+--------------------+-------------------+
| Evaluation Criterion  | Weight | Vendor A (TechCorp)| Vendor B (SysPro) |
|                       |        | Raw (1-5) | Weighted| Raw (1-5) |Weighted|
+-----------------------+--------+-----------+--------+-----------+-------+
| Technical Capability  |  30%   |     5     |  1.50  |     4     |  1.20 |
| Total Cost / Pricing  |  25%   |     3     |  0.75  |     5     |  1.25 |
| Financial Stability   |  15%   |     4     |  0.60  |     3     |  0.45 |
| Past Performance/Refs |  15%   |     5     |  0.75  |     3     |  0.45 |
| SLA & Customer Support|  15%   |     4     |  0.60  |     4     |  0.60 |
+-----------------------+--------+-----------+--------+-----------+-------+
| TOTAL EVALUATION SCORE|  100%  |     -     |  4.20  |     -     |  3.95 |
+-----------------------+--------+-----------+--------+-----------+-------+
Result: Vendor A achieves the superior composite score (4.20 vs. 3.95).

Purchase Requisitions vs. Purchase Orders: Legal Standing & Workflows

Administrative professionals must maintain absolute clarity regarding the distinct legal standing and administrative mechanics of Purchase Requisitions versus Purchase Orders.

The Purchase Requisition (PR)

A Purchase Requisition is strictly an internal administrative request document. Generated by an employee or department lead, it requests organizational permission to procure goods or services. The PR outlines item descriptions, quantities, estimated costs, accounting budget codes, and suggested suppliers.

  • Legal Status: A purchase requisition has zero external legal enforceability. It is an internal communication channel and must never be transmitted to a vendor as an authorization to deliver goods.
  • Internal Governance: The PR routes through internal approval hierarchies (e.g., department manager, finance, and IT) to verify that the expenditure is necessary and adequate departmental budget exists.

The Purchase Order (PO)

Once the purchase requisition receives all mandatory internal approvals, the purchasing department generates a Purchase Order (PO). The PO is an external commercial instrument transmitted directly to the vendor.

  • Key Content: The PO includes a unique sequential PO number, complete buyer and seller entity details, itemized line items, part numbers, agreed unit prices, delivery schedule, billing terms (e.g., Net 30), and shipping terms (e.g., FOB Destination).
  • Legal Standing: In contract law, an issued Purchase Order represents a formal legal offer to purchase. When the vendor accepts the purchase order—either through formal written acknowledgment, electronic order confirmation, or by commencing performance and shipping the goods—a legally binding commercial contract is officially formed between the buyer and the seller under the Uniform Commercial Code (UCC).
  • Budget Encumbrance: Within the enterprise accounting software, issuing a PO triggers a budget encumbrance. Encumbering funds places a legal hold on that portion of the departmental budget, ensuring the capital remains committed and cannot be spent elsewhere while awaiting vendor fulfillment.

Commercial Contract Types: Risk Allocation & Applications

When contracting with vendors, organizations structure agreements according to how operational and financial risk is allocated between buyer and seller. The three standard commercial contract types are:

+-------------------------------------------------------------------------+
|                  COMMERCIAL CONTRACT STRUCTURES & RISK                  |
+-------------------------------------------------------------------------+
|                                                                         |
|   [ 1. FIXED-PRICE / LUMP SUM ]                                         |
|   • Entire scope delivered for single predetermined price.              |
|   • Financial risk rests primarily on SELLER.                           |
|   • Best for standardized work with complete, rigid specifications.     |
|                                                                         |
|   [ 2. TIME & MATERIALS (T&M) ]                                         |
|   • Buyer pays fixed hourly labor rates plus direct material costs.     |
|   • Financial risk is SHARED (requires "Not-to-Exceed" cap).            |
|   • Best for consulting, emergency repairs, and evolving scopes.       |
|                                                                         |
|   [ 3. COST-REIMBURSABLE / COST-PLUS ]                                  |
|   • Buyer pays all allowable actual vendor costs plus a negotiated fee. |
|   • Financial risk rests primarily on BUYER.                            |
|   • Best for high-uncertainty R&D, pioneering technology development.   |
+-------------------------------------------------------------------------+

1. Fixed-Price (Lump Sum) Contracts

  • Mechanics: The buyer agrees to pay a single, fixed monetary amount upon satisfactory delivery of the specified deliverables, regardless of the vendor's actual costs incurred.
  • Risk Profile: The seller bears the primary financial risk of cost overruns, labor delays, or material price increases. If the project costs more than anticipated, the vendor's profit margin decreases or turns into a loss.
  • Application: Standardized commercial purchases, construction with fully finalized architectural blueprints, off-the-shelf software implementations, or standard facility maintenance.
  • Caution: Scope changes require expensive formal change orders; if specifications were vague, vendors may cut corners to preserve profit margins.

2. Time & Materials (T&M) Contracts

  • Mechanics: The buyer reimburses the vendor for actual labor hours expended at pre-negotiated, fixed hourly billing rates, plus the direct cost of approved materials utilized.
  • Risk Profile: Risk is shared, but the buyer is exposed to cost growth if vendor hours are not rigorously tracked. Administrative best practice mandates inserting a mandatory Not-to-Exceed (NTE) budgetary ceiling that the vendor cannot exceed without prior written authorization.
  • Application: Professional consulting, legal retainers, emergency facilities repairs, and software development projects where the total hours required cannot be accurately predicted upfront.

3. Cost-Reimbursable (Cost-Plus) Contracts

  • Mechanics: The buyer agrees to pay the contractor for all legitimate, allowable, and allocable actual expenses incurred during performance, plus an additional fee representing vendor profit (e.g., Cost Plus Fixed Fee or Cost Plus Incentive Fee).
  • Risk Profile: The buyer bears the primary financial risk of cost escalation, as the final expenditure total is unknown until completion.
  • Application: Groundbreaking research and development, pioneering aerospace and engineering prototypes, and emergency disaster recovery operations characterized by immense technical uncertainty.

Lease vs. Buy Analysis for Capital Assets

When acquiring high-value operational assets—such as high-volume multifunction printer fleets, corporate vehicle pools, server infrastructure, or mail-handling machinery—administrative leaders must conduct a Lease versus Buy Analysis to determine the optimal financial and operational approach.

+-------------------------------------------------------------------------+
|                    LEASE VS. BUY DECISION DYNAMICS                      |
+-----------------------+-------------------------------------------------+
| Decision Factor       | Favoring Leasing        | Favoring Buying       |
+-----------------------+-------------------------+-----------------------+
| Upfront Capital       | Minimal cash outlay;    | Substantial initial   |
| Requirement           | preserves liquidity.    | capital expenditure.  |
| Obsolescence Risk     | Transferred to lessor;  | Absorbed by buyer;    |
|                       | easy scheduled upgrades.| difficult to replace. |
| Maintenance & Service | Bundled into monthly    | Buyer manages/pays for|
|                       | lease agreement rates.  | ongoing repairs.      |
| Overall Lifetime Cost | Higher cumulative total | Lowest total lifecycle|
|                       | cost over long periods. | cost of ownership.    |
| Asset Ownership       | Zero equity; equipment  | Full equity, ownership|
| & Restrictions        | returned at lease end.  | and salvage value.    |
+-----------------------+-------------------------+-----------------------+

Evaluating the Lease Option

  • Preserving Working Capital: Leasing eliminates the requirement for significant upfront capital expenditures, allowing the enterprise to preserve cash liquidity for core business growth.
  • Mitigating Technology Obsolescence: For rapidly evolving assets (computers, copiers, medical devices), leasing transfers the risk of technological obsolescence to the lessor. At the conclusion of a 36- or 48-month lease, the organization returns the equipment and transitions to the latest generation.
  • Bundled Maintenance: Leases frequently include comprehensive service level agreements, scheduled preventive maintenance, and toner/parts supplies in a predictable monthly fee.
  • Accounting Considerations: Operating leases are expensed as operational overhead (OPEX), providing predictable operational deductions.

Evaluating the Buy Option

  • Lowest Total Cost of Ownership: Over an extended operating lifespan (e.g., 5 to 10 years), purchasing an asset outright is significantly less expensive than continuous lease payments.
  • Asset Ownership and Equity: The organization owns the asset outright, can modify it without lessor restrictions, and can recapture capital upon retirement through secondary market salvage or resale.
  • Operational Freedom: No contractual restrictions regarding usage thresholds, monthly page counts, mileage caps, or return condition penalties.
  • Tax and Accounting Depreciation: Capitalized assets are recorded on the balance sheet and depreciated over time (via MACRS or straight-line schedules), providing corporate tax depreciation shields.

Vendor Relationship Management (VRM) & Contract Governance

Procurement success extends throughout the multi-year lifecycle of the commercial partnership through Vendor Relationship Management (VRM). Administrative professionals oversee ongoing contract compliance through three primary mechanisms:

1. Master Service Agreements (MSAs) & Statements of Work (SOWs)

Organizations structure ongoing supplier engagements into a two-tiered legal architecture:

  • Master Service Agreement (MSA): An overarching umbrella contract that establishes the governing legal terms, intellectual property ownership, confidentiality and nondisclosure covenants, warranties, indemnification limits, liability caps, and dispute resolution procedures for the entire commercial relationship.
  • Statement of Work (SOW): An individual project addendum executed under the governing MSA. The SOW details project-specific deliverables, milestone timelines, technical acceptance criteria, labor hours, and specific payment schedules. Utilizing MSAs allows departments to execute new project SOWs rapidly without renegotiating foundational legal terms.

2. Service Level Agreements (SLAs) & Performance Scorecards

A Service Level Agreement (SLA) is a contractual commitment defining explicit, quantifiable performance standards that the supplier must deliver (e.g., 99.9% cloud server uptime, 4-hour on-site technician response for copier failures, or order fulfillment accuracy above 99.5%). SLAs must incorporate clear service credit penalties—deductions applied against monthly invoices when the vendor fails to meet contracted performance thresholds.

Simultaneously, administrative coordinators track supplier performance using periodic Vendor Scorecards, reviewing metrics quarterly across quality, on-time delivery, customer support responsiveness, and invoice accuracy.

3. Tracking Contract Expiration & Renewal Notice Windows

One of the most critical administrative duties in contract governance is monitoring Evergreen (Automatic Renewal) Clauses. Many commercial vendor contracts stipulate that the agreement automatically renews for an additional 12-month term unless the buyer delivers formal written notice of cancellation within a strict contractual window—typically 30, 60, or 90 days prior to contract expiration.

Administrative professionals maintain a centralized contract tracking calendar with automated milestone alerts set at 120, 90, and 60 days before contract anniversary dates. Missing a renewal notice window legally locks the enterprise into another full year of unwanted expenditures and forfeits competitive renegotiation leverage.

Loading diagram...
Enterprise Procurement Lifecycle, Sourcing Selection & Three-Way Match
Test Your Knowledge

An administrative services department is tasked with procuring 250 standardized executive ergonomic task chairs for a corporate facility refresh. The facilities director has already finalized the exact manufacturer, model number, fabric color code, ergonomic lumbar specifications, and delivery schedule. Which procurement solicitation instrument should be issued to prospective office furniture distributors, and why?

A
B
C
D
Test Your Knowledge

An operations manager submits an internal purchase requisition for $18,000 in specialized engineering software licenses. The department head signs the requisition, and the manager immediately forwards a copy of the approved internal requisition directly to the software vendor. The vendor delivers the digital license keys and an $18,000 invoice. However, corporate finance rejects the invoice because the purchasing department never issued an authorized Purchase Order (PO). What is the legal and operational status of the purchase requisition in this situation?

A
B
C
D
Test Your Knowledge

A fast-growing corporate consulting firm requires a fleet of 15 high-volume digital multifunction copiers and production document printers for its regional offices. Due to rapid technological advancements in cloud document encryption, optical character recognition (OCR), and machine hardware, the firm's IT steering committee expects the equipment to become technologically obsolete within 36 months. Additionally, the firm desires predictable monthly operational expenses with comprehensive parts, maintenance, and toner support included. Which procurement structure is most advantageous for the firm, and why?

A
B
C
D
Test Your Knowledge

An administrative operations manager is conducting an annual audit of enterprise commercial contracts and notes that a corporate janitorial and facilities maintenance agreement contains an evergreen automatic renewal clause with a 60-day written cancellation notice requirement prior to its November 1 annual expiration. The executive committee decides to terminate the agreement and solicit competitive proposals through an RFP. Today's date is August 15. What administrative procedure must the operations manager execute to ensure the contract is lawfully terminated without triggering an unwanted 12-month extension?

A
B
C
D