6.5 Construction Draws, Bridge Loans & Seller Financing
Key Takeaways
A bridge loan finances a timing gap until a specified source repays it. Confirm available net proceeds, related sale conditions and the effect of a delay.
Construction draws depend on scheduled evidence and the ability to finish the work. Ontario's construction holdback obligation and the lender's progress advances are distinct.
A vendor take-back mortgage secures part of the price owed to a seller. An agreement for sale can defer transfer of legal title.
Wraparound, blanket and participating loans require checks on who pays the prior debt, which parcels secure the loan and how the lender's return is determined.
Some financing is needed before the borrower has a completed home, before a previous sale closes or when the seller carries part of the purchase price. Identify the purpose, the release schedule, the actual lender and the source of repayment. Review lender authority and transaction terms before presenting any arrangement to a client.
Bridge or Interim Financing
A bridge loan covers a temporary timing gap. For example, a buyer needs equity for a new purchase before the sale proceeds from the current home arrive. The lender may require a firm sale agreement, a new mortgage commitment and proof of net sale proceeds. RBC's bridge product requires a firm sale agreement for the existing home. Check the dates, authorized amount, security, fees and repayment terms. If the sale is delayed, the borrower may need to carry three obligations for longer: the old loan, temporary financing and the new mortgage.
Worked example. The current home will sell for $740,000 and has a $430,000 payout and $30,000 of estimated selling costs. Expected net proceeds are $280,000. The new purchase requires $235,000 in equity before that sale closes. The estimated proceeds can cover $235,000, leaving $45,000 before bridge interest, fees and adjustments. This is a cash-flow calculation. The bridge lender decides how much it will advance.
Construction and Improvement Financing
A progress-draw loan funds a build or major improvement in stages. Agree with the lender on the budget, inspection requirements, borrower contribution and conditions for release. A foundation, enclosure and completion are examples of possible milestones. Advance amounts depend on the lender's verified work, valuation and remaining cost rather than fixed percentages of completion.
In a cost-to-complete review, compare available funds with the documented cost of finishing the project. If the borrower has $150,000 of available undrawn loan funds and $20,000 in available cash but the confirmed remaining work will cost $190,000, the file has a $20,000 funding gap. The lender must reconsider the next advance and document how completion would be funded. A completion mortgage can fund when the property is ready to close, while the builder has separate financing during construction.
CMHC Improvement can use as-improved value for an eligible project and requires progress advances for new construction and for improvements beyond its stated single-advance threshold. For an Ontario contract or subcontract under which a lien may arise, Construction Act section 22 generally requires the payer to retain 10% of the price of services or materials as supplied. The duty can apply even if payment is scheduled on completion. Section 26's annual release rules, in force from January 1, 2026, generally require publication no later than 14 days after the contract anniversary and owner payment within 60–74 days after publication, subject to lien and transition rules. Counsel checks the actual contract, statutory priority and applicable release dates. The lender can impose its own funding and draw conditions.
Seller Financing and Less Common Security Structures
| Structure | What changes in the transaction |
|---|---|
| Vendor take-back mortgage | The seller takes a charge from the buyer to secure unpaid purchase money. Confirm rank, repayment terms and consent of any lender whose loan terms are affected. |
| Agreement for sale with deferred title | The buyer pays under a contract and legal title can stay with the seller until the agreed performance or payment. Counsel checks protection of the buyer's interest, prior liens and remedies. |
| Wraparound mortgage | Existing financing remains in place under the arrangement. The new lender receives payment on the wrap and is responsible under the contract for servicing the underlying debt. Review prior lender consent, recourse and the risk of a missed senior payment. |
| Blanket mortgage | A single financing is secured across multiple properties. Identify every parcel, the rank of the charge and the conditions or payment required to release one property on sale. |
| Participating mortgage | The negotiated lender return can include a share of specified gains, revenues or profits. Read how the participation is measured, when it is paid and how it affects total borrowing cost and exit. |
| Discount or bonus | A loan may withhold a charge from the gross advance or require separate compensation for advancing credit. Trace net proceeds and the promised payments and apply the applicable disclosure and criminal-interest rules separately. |
Worked vendor example. A buyer offers $700,000, using $120,000 of personal funds, a proposed $550,000 bank mortgage and a $30,000 seller mortgage. The seller's mortgage is a separate secured obligation. Give the bank complete information about the source, terms, payment and priority before relying on bank approval. It is for the bank and any insurer to decide whether the structure is acceptable.
When the financier is an ordinary individual seller who is neither a financial institution nor an NHA-approved lender, the Level 1 agent at an unrelated brokerage must recognize the usual scope restriction and escalate. Ontario Regulation 186/08 section 11.1 contains a separate limited exemption for specified registered real estate brokerages and professionals arranging a vendor take-back in a trade, if all conditions apply. That exemption has its own criteria. Counsel should review any agreement that retains title, wraps existing financing, secures multiple properties or makes the return depend on gains.
A buyer wants to fund a new home before receiving the $280,000 of expected net proceeds from a firm sale. What does the lender first need to establish for a bridge proposal?
Whether the old mortgage automatically transfers title to the new home
The confirmed timing and amount of net sale proceeds, the shortfall at purchase and the bridge lender's terms
The high-ratio insurance premium on the entire sale price
Whether the construction contract permits an annual holdback release
A construction lender confirms $190,000 in remaining work, $150,000 in available undrawn funds and $20,000 in verified cash for the project. What does the cost-to-complete review show?
A $40,000 surplus because equity is assessed on original cost
A $20,000 surplus to release to the borrower
A $20,000 funding gap that needs to be addressed before the next advance is relied on
Completion is assured because inspections have been ordered
A borrower wants to sell one parcel that secures a blanket loan covering three parcels. What should the agent establish with counsel and the lender before counting on the sale proceeds?
Whether a home insurer will pay the shortfall caused by a land valuation change
Whether the seller has an open amortization under the original purchase agreement
Whether the charge is automatically removed when a parcel changes ownership
The lender's partial release terms, required payment and the effect on the other security