5.3 Pre-Termination Inspection, Cable Preparation, and Strip Tools

Key Takeaways

  • A compliant fiber preparation workstation requires a resilient, dark or contrasting work mat, optical-grade lint-free wipes, 99% pure electronic-grade isopropyl alcohol (IPA), and an OSHA-compliant puncture-proof fiber shard disposal container.

  • Outer jacket removal requires calibrated ring cuts and longitudinal cuts scoring 80% to 90% of jacket wall thickness to protect buffer tubes, followed by rip cord deployment pulled 180 degrees parallel to the cable axis.

  • Aramid strength yarn (Kevlar) must be trimmed exclusively with high-carbon or molybdenum alloy micro-serrated Kevlar shears, as ordinary wire cutters or utility knives slip, pinch, and rapidly dull.

  • Precision fiber stripping utilizes a 3-hole stripper to systematically remove the 1.6–3.0 mm jacket, 900 µm tight buffer, and 250 µm acrylate coating down to 125 µm bare cladding in short incremental pulls at a 30° to 45° angle.

  • Fan-out kits (furcation kits) mechanically convert fragile 250 µm loose-tube fibers into ruggedized 900 µm color-coded buffered assemblies using a furcation manifold and PTFE-lined tubing for direct field connectorization.

Last updated: October 2026

Pre-Termination Inspection, Cable Preparation, and Strip Tools

Successful optical fiber termination depends entirely on the precision and cleanliness of the pre-termination preparation phase. Before an installer ever exposes a glass core or polishes a ferrule, the cable structure must be systematically stripped, cleaned, strain-relieved, and organized. According to BICSI Installer 2 Optical Fiber (INSTF) guidelines and ANSI/TIA-568 standards, improper stripping techniques that score buffer tubes, crush glass fibers, or leave chemical contamination are the leading causes of high insertion loss, premature mechanical failure, and macrobending attenuation in finished field links.


Ergonomics, Sanitary Workstation Setup, and Fiber Shard Containment

Optical termination is a micro-assembly procedure performed in challenging field environments. Silica glass fibers possess an outer cladding diameter of 125 μm125\ \mu\text{m} (approximately the thickness of a human hair) and a primary acrylate coating diameter of 250 μm250\ \mu\text{m}. Setting up an ergonomic, organized, and sanitary workstation is the foundational step for any termination or splicing operation.

Workstation Setup Requirements

  • Work Surface: The workstation must feature a clean, flat, vibration-free surface covered with a resilient, dark or contrasting work mat. High-contrast black, dark green, or dark gray static-dissipative vinyl mats provide immediate visual contrast against translucent glass shards and colored fiber strands.
  • Cleaning Agents: Technicians must utilize optical-grade, lint-free hydropolymer or precision polyester wipes and 99% pure electronic-grade anhydrous isopropyl alcohol (IPA). Drugstore rubbing alcohol (70% or 91%) should not be used: its water content, and sometimes additives, leave residue on the glass.
  • Solvent Dispensing: IPA should be stored and dispensed from sealed, push-down touch pumps to eliminate airborne particulate contamination and prevent accidental solvent spills in enclosed telecommunications spaces.
  • Fiber Shard Disposal Unit: A dedicated, puncture-proof "sharps" container with a locking or self-closing lid must be placed within arm's reach of the technician's dominant hand. Glass shards from cleaving and stripping operations represent severe personal injury hazards.

Caution

Fiber Shard Safety: Cleaved optical fiber shards are virtually invisible, needle-sharp silica splinters. They easily penetrate skin and are hard to see and remove, and a shard in the eye needs medical attention. Never touch your eyes, face, or clothing while handling bare fibers. Food and open beverages are strictly prohibited in the optical termination workspace. All waste shards must go directly into the puncture-proof disposal container. Technicians should use double-sided adhesive tape or dedicated sticky tape pads to collect any stray fiber splinters from the work mat.

Cable Inspection and Verification

Before stripping the cable sheath, the technician must inspect the outer jacket to verify compliance with installation documentation and blueprints:

  1. Cable Markings: Confirm the manufacturer brand, fiber count, core/cladding diameter (9/125 μm9/125\ \mu\text{m} single-mode, 50/125 μm50/125\ \mu\text{m} OM3/OM4/OM5, or 62.5/125 μm62.5/125\ \mu\text{m} OM1), and NEC flame rating (OFNP plenum, OFNR riser, or OFNG/OFN general-purpose).
  2. Sequential Footage / Meter Markings: Record the printed sequential markings at both ends of the run to verify actual link length against the approved optical loss budget.
  3. Service Slack: Verify that adequate service slack has been preserved. In telecommunications rooms (TRs) and entrance facilities (EFs), BICSI recommends maintaining 3 meters (10 feet) of cable sheath slack at the entrance, plus 1 meter (3.3 feet) of jacketed slack inside the optical distribution cabinet for future re-termination or routing adjustments.

Cable Sheath Stripping and Jacket Removal Techniques

Optical cables are engineered with robust outer jackets made of polyvinyl chloride (PVC), low-smoke zero-halogen (LSZH), or heavy-duty polyethylene (PE) to shield fragile internal glass from crushing forces and environmental moisture. Stripping the jacket requires specialized tools and disciplined hand mechanics.

Sheath Stripping Tools

  • Swivel-Blade Round Cable Strippers: Tools featuring an adjustable, rotatable blade mounted in an open clamp. The blade automatically pivots to execute both circumferential (ring) and axial (longitudinal) cuts.
  • Micro-Duct and Sheath Slitters: High-precision ratcheting slitters designed to slice longitudinally down heavy dielectric jackets without depth run-out.
  • Armored Cable Slitters: Heavy-duty ratcheting cutters equipped with hardened tool-steel cutting wheels engineered to shear through corrugated steel tape (CST) armor or aluminum interlocked armor (AIA).

The Ring-Cut and Longitudinal Technique

To remove the outer jacket without damaging internal buffer tubes, rip cords, or central strength members, installers execute a controlled two-step stripping sequence:

  1. Calibrating Blade Depth: Prior to cutting the production cable, adjust the blade height using a scrap piece of the same cable. The blade should be dialed in to score 80% to 90% through the jacket thickness. The blade must never penetrate 100% of the jacket wall, as direct blade contact can nick internal elements.
  2. The Circumferential Ring Cut: Place the tool at the designated strip length (typically 1.0 to 1.5 meters1.0\text{ to }1.5\text{ meters} for patch panels or fan-out kits). Rotate the tool 360∘360^\circ around the circumference of the cable once or twice to create a clean, uniform score line.
  3. The Longitudinal Cut: Pivot the blade into the axial position and draw the slitter smoothly down the length of the jacket toward the cable end.
  4. Flexing and Snapping: Grasp the cable on either side of the circumferential score mark and gently flex the jacket back and forth. The remaining 10% to 20% of the unsevered plastic will cleanly snap along the score line. Slide the split jacket section off the core assembly.

Rip Cord Deployment

Most premises distribution and OSP loose-tube cables incorporate one or two high-tensile synthetic rip cords (typically aramid or braided polyester) embedded directly beneath the outer sheath. Rip cords provide the safest method for opening long lengths of cable sheath without using bladed tools near delicate buffer tubes.

[Outer Sheath] -----------------------------------------------------
                  \ (Rip cord pulled backwards at 180 degrees)
                   =================================================
[Internal Buffer Tubes & CSM] --------------------------------------

To deploy a rip cord:

  1. Make a short 50 to 75 mm50\text{ to }75\text{ mm} (2 to 3 inches2\text{ to }3\text{ inches}) preliminary ring cut at the cable end to expose the rip cord.
  2. Grasp the rip cord firmly with needle-nose pliers or wrap it around a screwdriver handle or dowel rod.
  3. Pull the rip cord backward at an acute angle (180∘180^\circ parallel to the cable axis). The cord will slice through the jacket material cleanly from the inside out.
  4. Peel back the separated jacket halves and trim them flush with the circumferential ring cut.

Handling Internal Cable Elements

Once the outer sheath is removed, the installer must process three primary internal structural elements: strength members, moisture-blocking materials, and aramid yarn.

Central Strength Member (CSM) Preparation

The Central Strength Member—typically an epoxy-impregnated dielectric fiberglass-reinforced plastic (FRP) rod or stranded galvanized steel wire—resists axial tension and prevents cable elongation during pulling.

  • The CSM must never be cut flush with the outer jacket.
  • Measure the distance required by the specific termination enclosure's strain-relief clamp (typically 25 to 50 mm25\text{ to }50\text{ mm} or 1 to 2 inches1\text{ to }2\text{ inches} beyond the sheath cut).
  • Cut dielectric FRP strength rods using heavy-duty diagonal cutters or a dedicated cable shear. If cutting metallic steel strength members, use hardened wire cutters and ensure the metallic member is grounded and bonded per NEC Article 770 and ANSI/TIA-607.

Water-Blocking Material Remediation

  • Dry Water-Blocking Materials: Modern indoor/outdoor cables utilize dry, water-swellable aramid yarns, tapes, and super-absorbent polymer powders. These materials can be gently gathered and trimmed away using dry lint-free wipes and Kevlar shears.
  • Gel-Filled Buffer Tubes and Cables: Traditional OSP loose-tube cables contain petroleum- or silicone-based hydrophobic gel designed to block longitudinal water migration. Gel must be thoroughly cleaned from the buffer tubes and fibers before termination. Saturate lint-free wipes with a certified non-toxic, citrus-based or hydrocarbon cable gel-clearing solvent. Wipe each tube down until completely degreased, followed by a final wipe with 99% electronic-grade IPA.

Aramid Yarn (Kevlar) Trimming: The Critical Shear Rule

Surrounding the internal buffer tubes or tight-buffered fibers is a protective bed of woven aramid yarn (commercially known as DuPont Kevlar). Aramid yarn absorbs pulling forces and provides crucial mechanical retention when crimped to the rear barrel of a connector.

Important

The Kevlar Shear Mandate: Never attempt to cut aramid strength yarn using ordinary wire cutters, electrician's snips, or utility knives. Aramid fibers possess immense tensile strength and high shear modulus. Standard scissor blades will deflect, pinch, and slide over the fibers, immediately dulling the blades and leaving jagged, frayed threads that jam connector crimp rings.

Installers must use dedicated Kevlar shears featuring:

  1. High-Carbon or Molybdenum-Vanadium Alloy Steel Blades: Hardened to resist rapid abrasive wear.
  2. Micro-Serrated Cutting Edge: One blade features microscopic laser-cut teeth that trap and hold the slippery aramid filaments, preventing them from slipping forward while the opposing razor-sharp blade cleanly shears through the bundle in a single stroke.

Buffer Tube Stripping and Bare Fiber Exposure

In loose-tube cables, 250 μm coated optical fibers are housed loosely within color-coded plastic buffer tubes (typically manufactured from polybutylene terephthalate [PBT] or polypropylene). These tubes protect the fibers from exterior mechanical stresses and allow the glass to float freely during thermal expansion and contraction.

Operating Buffer Tube Strippers

Stripping the semi-rigid buffer tube to expose the bare 250 μm fibers requires an adjustable-blade buffer tube stripper:

  1. Blade Depth Calibration: The stripper possesses an adjustable screw stop controlling blade depth. Calibrate the blade on an empty section of tube so that it scores roughly halfway through the plastic wall thickness.
  2. Scoring the Tube: Place the tool around the buffer tube at the desired breakout point. Rotate the tool 360∘360^\circ once. Do not over-rotate, as repeated spinning increases the risk of blade migration into the fiber bundle.
  3. The Flex-and-Snap Technique: Remove the tool. Hold the buffer tube firmly with both hands on either side of the score line and gently flex the tube until the plastic snaps with an audible click.
  4. Axial Slide-Off: Slowly and smoothly draw the severed tube section straight off the fiber bundle, keeping the tube perfectly parallel to the fibers. Never pull at an angle, as the sharp severed edge of the plastic tube can shear or micro-fracture the underlying glass.
  5. Fiber Cleansing: Wipe the exposed 250 μm fibers with an IPA-dampened lint-free wipe to remove any residual gel or manufacturing talc.

Precision Fiber Stripping Tools and Hand Mechanics

Once individual optical fibers are accessed, the technician must strip the outer polymer protective layers down to the bare 125 μm125\ \mu\text{m} silica glass cladding. This operation demands extreme precision, as any metal blade contact with the glass surface introduces micro-cracks that lead to catastrophic fiber breakage.

The 3-Hole Precision Stripper

The industry-standard tool for fiber preparation is the 3-hole precision fiber stripper. The tool incorporates three laser-calibrated stripping notches:

  1. Hole 1 (Large Outer Notch): Strips 1.6 to 3.0 mm1.6\text{ to }3.0\text{ mm} outer cordage jackets down to the 600 to 900 μm600\text{ to }900\ \mu\text{m} tight buffer.
  2. Hole 2 (Middle Notch): Strips the 900 μm900\ \mu\text{m} tight buffer (or elastomeric furcation tubing) down to the 250 μm250\ \mu\text{m} primary acrylate buffer coating.
  3. Hole 3 (Small Inner Notch): Precision laser-ground notch that strips the 250 μm250\ \mu\text{m} UV-cured acrylate coating down to the bare 125 μm125\ \mu\text{m} silica glass cladding.
[ 3-Hole Stripper Blade Geometry ]
 Notch 1: 1.6 - 3.0 mm Jacket  ===>  900 um Buffer
 Notch 2: 900 um Tight Buffer  ===>  250 um Acrylate Coating
 Notch 3: 250 um Acrylate      ===>  125 um Bare Glass Cladding

Proper Stripping Mechanics

  • Angle of Approach: Hold the stripping tool at an angle of 30∘ to 45∘30^\circ\text{ to }45^\circ relative to the fiber axis. Squeezing the tool completely perpendicular (90∘90^\circ) increases shear friction and promotes fiber buckling.
  • Incremental Bites: Never attempt to strip more than 6 to 12 mm6\text{ to }12\text{ mm} (1/4 to 1/2 inch1/4\text{ to }1/2\text{ inch}) of coating in a single pull. Stripping longer sections causes the removed acrylate coating to bunch up and accordion within the stripper jaws, generating immense drag that snaps the fiber.
  • Cleaning Bare Glass: Immediately after stripping, wipe the bare glass cladding with a lint-free wipe saturated with 99% pure IPA. Draw the wipe firmly from the buffer boundary toward the cleaved end until an audible "squeak" is heard, indicating the glass surface is pristine and free of acrylate residue.
  • The Inviolable Re-Stripping Rule: Never attempt to re-strip an already exposed bare glass fiber with mechanical strippers. Hardened steel blades dragging over bare silica create invisible surface micro-fissures (known as Griffith flaws) that concentrate mechanical stress, causing delayed fiber fracture under normal handling.

Thermal and Chemical Stripping Alternatives

  • Thermal Strippers: In high-reliability applications and multi-fiber ribbon splicing, technicians utilize electrically heated thermal strippers. Integrated heating elements soften the tough acrylate coating in 3 to 5 seconds, allowing the coating to slide off with minimal mechanical pulling force, completely eliminating blade contact with the glass.
  • Chemical Stripping: For sensitive specialty fibers or research applications where mechanical contact must be strictly avoided, chemical stripping gels (typically methylene chloride based) are applied to dissolve the acrylate buffer without mechanical stress.

Fan-Out Kits (Furcation Kits) and Breakout Assemblies

While 250 μm250\ \mu\text{m} primary coated fibers are ideal for high-density fusion splice trays, they are mechanically unsuitable for direct field connectorization. Standard optical connectors (such as LC, SC, and ST) are engineered with rear crimp barrels and strain-relief boots designed to secure 900 μm900\ \mu\text{m} tight-buffered fibers or 2.0 to 3.0 mm2.0\text{ to }3.0\text{ mm} jacketed cordage.

Attempting to install a standard connector directly onto a 250 μm250\ \mu\text{m} fiber leaves the fragile glass unprotected against lateral bending, tensile pull, and macrobending at the connector boot interface. To solve this problem, technicians install fan-out kits (also designated as furcation kits or breakout kits).

Cable ElementUnprotected 250 μm Bare FiberFan-Out Converted 900 μm Fiber
Outer Diameter250 μm250\ \mu\text{m} (UV-cured acrylate)900 μm900\ \mu\text{m} (Elastomeric Hytrel/PVDF tube)
Mechanical ProtectionExtremely fragile; zero crush resistanceSemi-rigid tubing protects against crush and microbends
Termination SuitabilitySplicing only (fusion or mechanical)Direct connector termination (LC, SC, ST)
Handling DurabilityProne to breakage during patchingResilient for cross-connect and patch panel routing

Anatomy of a Fan-Out Kit

A complete commercial fan-out kit consists of three integrated sub-assemblies:

  1. Furcation Manifold (Breakout Body): A precision molded plastic or machined aluminum transition chamber. The manifold mechanically secures the incoming cable buffer tube and central strength member at its input port, providing robust strain relief.
  2. Furcation Tubing: A pre-assembled harness of color-coded, semi-rigid 900 μm900\ \mu\text{m} outer diameter protective tubes manufactured from flame-retardant Hytrel or PVDF. Each tube is internally lined with a low-friction fluoropolymer (PTFE / Teflon) slip-cladding to facilitate smooth fiber insertion without binding.
  3. Protective Manifold Shell: A snap-together or screw-down outer protective casing that encloses the manifold transition junction, locking the buffer tube and furcation tubes securely in place.

Step-by-Step Fan-Out Kit Installation Workflow

[Incoming Cable Buffer Tube] ===> [ Furcation Manifold ] ===> [ 12 x 900 um Color-Coded Tubes ]
                                      |                     (Internal PTFE Low-Friction Liners)
                               [CSM Anchor Clamp]
  1. Calculate Furcation Length: Determine the distance from the cable breakout point to the farthest connector patch position inside the optical panel. Standard furcation lengths range from 600 to 900 mm600\text{ to }900\text{ mm} (24 to 36 inches24\text{ to }36\text{ inches}).
  2. Strip Outer Jacket and Buffer Tubes: Strip the cable jacket back to expose the required length of buffer tube. Then, strip the buffer tube to expose the bare 250 μm fibers, leaving exactly 25 to 50 mm25\text{ to }50\text{ mm} (1 to 2 inches1\text{ to }2\text{ inches}) of buffer tube protruding beyond the cable jacket.
  3. Clean the Fibers: Thoroughly clean each individual 250 μm colored fiber using lint-free wipes saturated with 99% IPA, ensuring all gel and particulate residue are removed.
  4. Color-Coded Tube Staging: Organize the 900 μm900\ \mu\text{m} furcation tubes according to the TIA-598 color code sequence:
    • Position 1: Blue
    • Position 2: Orange
    • Position 3: Green
    • Position 4: Brown
    • Position 5: Slate
    • Position 6: White
    • Position 7: Red
    • Position 8: Black
    • Position 9: Yellow
    • Position 10: Violet
    • Position 11: Rose
    • Position 12: Aqua
  5. Fiber Insertion and Threading: Insert each 250 μm fiber into its matching color-coded furcation tube. Feed the fibers through the low-friction tubing simultaneously in small, steady increments (25 to 50 mm25\text{ to }50\text{ mm} at a time). If a fiber encounters resistance, gently retract it 10 mm and advance it again. Never force a buckled fiber.
  6. Seat the Buffer Tube in the Manifold: Push the manifold base over the buffer tube until the tube seats firmly against the internal stop shoulder. Anchor the central strength member to the manifold clamp if provisions exist.
  7. Enclose and Lock: Snap or screw the protective manifold top cover onto the base. Verify that none of the fibers are pinched between the mating housing halves.
  8. Post-Furcation Readiness: The exposed ends of the fibers now emerge from ruggedized, color-coded 900 μm tubes. They are structurally equivalent to 900 μm tight-buffered distribution fibers and can now be terminated directly using field-installable connectors (anaerobic, epoxy-polish, or splice-on connectors) or organized within modular patch cassettes.

Measuring Exact Strip Lengths and Tolerances

Connector termination kits provide dedicated plastic strip templates, gauge cards, and calipers to measure exact strip lengths prior to cleaving and termination. Tolerances must be held strictly within ±0.5 mm\pm 0.5\text{ mm}.

Typical Strip Dimensions (Pre-Polished Mechanical Connector Example)

  • Outer Jacket Cutback: Typically 25 to 35 mm25\text{ to }35\text{ mm} stripped back to expose aramid yarn and tight buffer.
  • 900 μm Buffer Cutback: Typically 10 to 15 mm10\text{ to }15\text{ mm} stripped to expose the 250 μm coated section.
  • Bare 125 μm Glass Cleave Length: Typically 10.0 mm±0.5 mm10.0\text{ mm} \pm 0.5\text{ mm} of pristine cleaved glass extending beyond the 250 μm coating boundary.

Failure Consequences of Incorrect Strip Lengths

  • Bare Glass Too Long: If the bare glass exceeds the specified length, unbuffered glass extends out the back of the ferrule or cam mechanism into the connector boot. When the connector boot flexes during routing, the unprotected glass experiences severe macrobending loss and readily shatters.
  • Bare Glass Too Short: If the bare glass is cut too short, it fails to reach the internal factory stub in pre-polished mechanical connectors, creating an air gap and very high loss or failing to engage the cam clamp entirely.
  • Buffer Cutback Too Short: If the 900 μm buffer is not stripped back far enough, the thick buffer material jams into the narrow rear ferrule capillary, preventing the bare glass from bottoming out at the ferrule end-face.

Pre-Termination & Stripping Reference Summary

Cable Layer / ElementNominal DimensionPrimary Stripping ToolRecommended Mechanical ActionInspection & Verification Criteria
Outer Cable Sheath3.0 mm to 15 mm3.0\text{ mm to }15\text{ mm}Swivel-Blade Slitter / Rip CordScore 80–90% depth, flex-snap; pull rip cord at 180∘180^\circZero scoring or cut marks on internal buffer tubes
Aramid Strength YarnTensile bundlesMicro-Serrated Kevlar ShearsSingle clean shear stroke with serrated bladeNo frayed filaments; uniform length for crimp ring
Central Strength Member1.0 to 3.0 mm1.0\text{ to }3.0\text{ mm} FRP/SteelDiagonal Cutters / Wire CuttersCut to clamp setback (25 to 50 mm25\text{ to }50\text{ mm} beyond jacket)Rigid retention; metallic CSM bonded per TIA-607
Loose Buffer Tube2.0 to 3.0 mm2.0\text{ to }3.0\text{ mm} PBTAdjustable Buffer Tube StripperScore 50% depth, flex-snap, straight axial slide-offFibers free of nicks; degreased with solvent and IPA
Tight Buffer / Furcation900 μm900\ \mu\text{m} Elastomer3-Hole Stripper (Middle Notch)30∘ to 45∘30^\circ\text{ to }45^\circ angle; 6 to 12 mm6\text{ to }12\text{ mm} incremental pullsClean cut shoulder; 250 μm coating undamaged
Primary Buffer Coating250 μm250\ \mu\text{m} Acrylate3-Hole Stripper (Inner Notch)30∘ to 45∘30^\circ\text{ to }45^\circ angle; 6 mm6\text{ mm} pulls; wipe with 99% IPABare glass squeaks clean; no re-stripping on bare silica
Bare Silica Cladding125 μm125\ \mu\text{m} GlassPrecision Cleaver / Strip GaugeCleave to template (±0.5 mm\pm 0.5\text{ mm}); inspect end-faceCleave angle <1.0∘<1.0^\circ; pristine core; zero Griffith flaws
Loading diagram...
Pre-Termination, Stripping Sequence, and Furcation Assembly
Test Your Knowledge

What is the specific mechanical function of each notch on a standard 3-hole optical fiber stripper?

A

Hole 1 cuts steel strength members, Hole 2 cuts aramid yarn, and Hole 3 strips 900 μm tight buffer.

B

Hole 1: jacket to 900 μm buffer; Hole 2: buffer to 250 μm coating; Hole 3: coating to 125 μm cladding.

C

Hole 1 scores corrugated steel armor, Hole 2 scores loose buffer tubes, and Hole 3 strips 250 μm coating.

D

Hole 1 polishes the ferrule end-face, Hole 2 strips buffer tubes, and Hole 3 crimps the metal connector eyelet.

Test Your Knowledge

Why is it an inviolable optical fiber installation rule that technicians must NEVER re-strip already exposed bare 125 μm glass cladding with a mechanical stripping tool?

A

Re-stripping bare glass leaves a magnetic residue that interferes with fusion splicer arc diagnostics.

B

The chemical reaction between the steel blade and pure silica turns the cladding surface opaque.

C

Steel blades scratch bare glass, leaving surface flaws that can later cause the fiber to break under slight stress.

D

The friction between the steel blades and bare silica generates electrostatic charges that depolarize single-mode laser signals.

Test Your Knowledge

What is the primary technical objective of installing a fan-out kit (furcation kit) on a loose-tube optical fiber cable before connector termination?

A

To move fragile 250 μm loose-tube fibers into 900 μm color-coded tubing that can be terminated directly.

B

To strip the primary 250 μm acrylate coating down to 125 μm bare cladding glass for mechanical splicing.

C

To provide electrical bonding and grounding continuity between the central strength member and the telecommunications busbar.

D

To convert single-mode optical fiber signals into laser-optimized multimode transmission profiles.

Test Your Knowledge

When stripping the outer jacket of an optical fiber cable with a rotary round-cable slitter, what is the correct blade depth setting to ensure the integrity of internal components?

A

Set the blade to 100% of the jacket thickness to ensure the plastic cuts completely through in a single rotation.

B

Adjust the blade to penetrate exactly 50% of the buffer tube diameter beneath the jacket.

C

Set the blade depth to twice the jacket thickness to ensure internal armor and water-swellable tapes are cut simultaneously.

D

Set the depth on scrap cable to score 80 to 90 percent through the jacket, then flex to snap it.