100+ Free Personal Track Safety (PTS) Practice Questions
Pass your Personal Track Safety (PTS) — Sentinel (Network Rail/NSAR, UK) exam on the first try — instant access, no signup required.
Loading practice questions...
Key Facts: Personal Track Safety (PTS) Exam
90%
Passing Score
Network Rail
45 min
Time Limit
Network Rail
GBP 140
Average Fee
Sentinel Centre
Prepare for the Network Rail PTS exam with 100 free practice questions covering danger zones, AC/DC electrification safety, COSS briefings, and emergency procedures.
Sample Personal Track Safety (PTS) Practice Questions
Try these sample questions to test your Personal Track Safety (PTS) exam readiness. Each question includes a detailed explanation. Start the interactive quiz above for the full 100+ question experience with AI tutoring.
1What distance from the nearest running rail defines the boundary of the 'Danger Zone' on Network Rail infrastructure?
2What is the minimum safe clearance distance required from live 25kV AC Overhead Line Equipment (OLE) under standard PTS rules?
3What color of high-visibility clothing is MANDATORY for all personnel working on or near the line on Network Rail infrastructure?
4Who is responsible for issuing a Safe System of Work (SSOW) briefing to track workers before going on or near the line?
5What safety device is used in an emergency to automatically trigger a red track circuit signal and stop approaching trains on track-circuited lines?
6What is the minimum Position of Safety distance from a line where trains travel at speeds up to 100 mph?
7What is the minimum Position of Safety distance from a line where trains travel at speeds between 101 mph and 125 mph?
8Under DC Conductor Rail electrification (750V 3rd rail), what is the minimum safe distance you should maintain from a live conductor rail unless stepping over it carefully?
9What action must you take if your Sentinel card is requested by an authorized Network Rail auditor or COSS on site?
10What is meant by an 'Open Line'?
About the Personal Track Safety (PTS) Exam
Comprehensive practice question bank for the Network Rail Personal Track Safety (PTS) Sentinel knowledge exam.
Questions
30 scored questions
Time Limit
45 minutes
Passing Score
90%
Exam Fee
GBP 140 (Network Rail / NSAR Sentinel scheme)
Personal Track Safety (PTS) Exam Content Outline
Danger Zone and Position of Safety
Danger zone definitions, position of safety, speed-based safety distances, and crossing tracks safely.
Electrification Hazards (AC Overhead & DC Conductor Rail)
Conductor rail (750V DC) 3rd/4th rail rules, overhead line equipment (25kV AC) clearances, and emergency isolations.
PPE, Sentinel Card and Personal Safety
High-visibility clothing (BS EN ISO 20471), safety footwear, Sentinel card swipe-in, and mobile phone usage rules.
Safe System of Work and COSS Briefing
Safe System of Work (SSOW), Controller of Site Safety (COSS) briefings, site warden warnings, and Sentinel compliance.
Railway Emergency Procedures
Emergency train stopping procedures, track circuit operating clips (TCOCs), red flag/light signals, and signaller contact.
How to Pass the Personal Track Safety (PTS) Exam
What You Need to Know
- Passing score: 90%
- Exam length: 30 questions
- Time limit: 45 minutes
- Exam fee: GBP 140
Keys to Passing
- Complete 500+ practice questions
- Score 80%+ consistently before scheduling
- Focus on highest-weighted sections
- Use our AI tutor for tough concepts
Personal Track Safety (PTS) Study Tips from Top Performers
Frequently Asked Questions
What is the passing score for the Network Rail PTS exam?
The official PTS knowledge assessment requires a passing score of at least 90% (typically 28 out of 30 questions correct).
What prerequisites are needed before taking the PTS assessment?
Candidates must have a valid Network Rail Level 4 Medical certificate and a negative Drug and Alcohol (D&A) screening registered on the Sentinel database by a recognized sponsor.
What is the minimum safe distance from 25kV Overhead Line Equipment (OLE)?
Under standard PTS rules, you must stay at least 2.75 metres (9 feet) away from live 25kV AC overhead line equipment unless an official isolation has been confirmed.