1What professional authorization should a client verify before appointing an engineer to perform technical supervision (технічний нагляд)?
A.A valid qualification certificate covering the relevant technical-supervision work
B.A contractor's site-manager appointment alone
C.A general design-engineering certificate regardless of specialization
D.A construction-related degree without professional certification
Explanation: Technical supervision requires the relevant professional qualification and scope. A degree or appointment to a different construction role does not itself authorize this certified function.
2Which proposed appointment presents the conflict prohibited by the technical-supervision framework for the same construction object?
A.A certified independent engineer appointed by the client
B.An employee of the construction organization executing the supervised works
C.A certified engineer who previously supervised another client's completed project
D.A certified engineer engaged through a separate supervision service contract
Explanation: A person working for an organization executing the controlled construction cannot provide the required independent technical supervision of those works. Certification alone does not resolve that conflicting role.
3Delivered reinforcement does not match the approved design and the contractor intends to cast concrete around it today. Which response best fulfils technical supervision?
A.Document the nonconformity, require the affected work to stop pending an approved resolution, notify the client and withhold acceptance
B.Accept the cage if the contractor undertakes to submit documents after casting
C.Sign the hidden-work act with a general note that material quality is the supplier's responsibility
D.Approve the substitution solely because the delivered bars have the same diameter
Explanation: Supervision must prevent nonconforming materials from becoming accepted concealed work. The discrepancy needs a documented technical resolution; further escalation follows the applicable procedure if the contractor refuses to correct it.
4Which conditions accompany the indefinite term of a Ukrainian technical-supervision qualification certificate?
A.Annual replacement of the certificate regardless of practice
B.No professional development after the initial examination
C.Automatic permission to supervise every specialization
D.No specialty practice break exceeding three years and professional development at least every five years
Explanation: The indefinite-term framework includes practice continuity and periodic professional development. The holder must also remain within the work scope and qualification category stated in the credential.
5An uncertified assistant prepares inspection notes for a technical-supervision engineer. Who must make and take responsibility for the certified acceptance decision?
A.The assistant, because preparing the notes transfers authority
B.The appropriately certified responsible engineer after verifying the work
C.The supplier, because it issued the invoice
D.The contractor alone, because it performed the work
Explanation: Administrative assistance does not transfer the professional's certified authority or responsibility. The responsible engineer must have a defensible basis for the inspection and any signed acceptance.
6Whose construction-quality interests does the appointed technical-supervision engineer primarily represent within the construction process?
A.The executing contractor's production team
B.The client (замовник) that arranges technical supervision
C.The materials supplier's sales department
D.The project designer acting exclusively as author's supervision
Explanation: The client arranges technical supervision to check the works and their conformity. This role is distinct from contractor quality control and the designer's author's supervision, even though they cooperate in inspections.
7A proposed project exceeds the consequence-class scope stated in an engineer's technical-supervision certificate. What should be established before appointment?
A.That the client is willing to pay a higher fee
B.That the contractor accepts the engineer's general experience
C.That an appropriately authorized engineer covering the project's scope will be responsible
D.That the building uses only familiar construction materials
Explanation: Appointment must respect the professional's authorized work scope and qualification level. Familiar materials, experience or a private agreement do not by themselves expand the certificate.
8What should technical supervision do when material conformity cannot be established from the available delivery documents and inspection?
A.Require the additional testing or verification needed to resolve conformity before acceptance
B.Treat a paid invoice as conclusive evidence of technical performance
C.Accept the batch because earlier deliveries from the same supplier passed
D.Replace the missing evidence with the contractor's verbal assurance
Explanation: Technical supervision can require the necessary verification of materials and works. The testing scope should address the actual uncertainty; prior experience or commercial documents cannot establish the properties of an unverified batch.
9What is the principal function of the General Work Log (Загальний журнал робіт)?
A.Replace the approved design drawings
B.Record the sequence, timing, quality and conditions of construction work
C.Record only the contractor's financial payments
D.Replace every specialist test report with a daily progress total
Explanation: DBN A.3.1-5:2016 treats the General Work Log as a primary production record. It records how work progressed and under what conditions, while specialist logs, acts and test reports provide additional evidence.
10What information does an as-built geodetic scheme (виконавча геодезична схема) provide for a newly erected frame?
A.Only the designer's intended coordinates copied without measurement
B.Only the cost of the survey equipment
C.Only the setting-out plan prepared before erection
D.Measured positions and elevations that allow actual geometry to be compared with design and tolerances
Explanation: An as-built scheme records the geometry actually achieved. Comparing it with the design and applicable tolerances helps identify deviations before subsequent works conceal or load the structure.