Free Practice Questions for NOSTROY Chief Project Engineer — Construction Organization, Level 7
Exam-style questions and explanations by OpenExamPrep.
Loading practice questions...
Key Facts: NOSTROY Chief Project Engineer — Construction Organization, Level 7 Exam
36 of 50
Minimum theory score to reach the practical stage
NOSTROY 2024 sample assessment tool, 16.02500.09
60 min
Theoretical stage time limit
NOSTROY 2024 sample assessment tool, 16.02500.09
3 years
Qualification certificate validity
NARK qualification register, 16.02500.09
Every 5 years
Required assessment frequency for national register specialists
Urban Planning Code, Article 55.5-1, Part 10
5 years / 3 years
Required experience (construction field / engineering positions)
NARK qualification register, 16.02500.09
The NOSTROY level-7 GIP exam (НОК, qualification 16.02500.09) is Russia's independent qualification assessment for chief project engineers in construction. NOSTROY's national register requires it at least every five years. Accredited ЦОКs run it as 50 computer tasks in 60 minutes (36 points to pass) plus a practical stage. Topics: preparation, management, construction control and handover. This bank is an independent English-language MCQ study adaptation.
Sample NOSTROY Chief Project Engineer — Construction Organization, Level 7 Practice Questions
Try these sample questions to review concepts for the NOSTROY Chief Project Engineer — Construction Organization, Level 7 exam. Each question includes a detailed explanation. Start the interactive quiz above for the full 100+ question experience with AI tutoring.
1Under Article 51 of the Urban Planning Code of the Russian Federation (ГрК РФ), what does a building permit (разрешение на строительство) confirm?
2Under Article 51, Part 4 of the Urban Planning Code, which body issues a building permit in the general case?
3For how long is a building permit for a capital construction object issued under Article 51, Part 19, other than a permit for a construction stage or for individual housing construction?
4Under Article 51, Part 17 of the Urban Planning Code, in which situation is a building permit NOT required?
5Under Article 48.1 of the Urban Planning Code, which design characteristic makes a capital construction object 'unique' (уникальный объект)?
6Under Article 49, Part 2 of the Urban Planning Code, for which objects is expertise of design documentation NOT carried out?
7Under Article 49, Part 3.8, the developer may decide not to send changes to approved design documentation for expertise only if the changes meet several conditions at once. Which is one of them?
8Under Article 48, Part 15 of the Urban Planning Code, who approves design documentation and the changes made to it under Parts 3.8 and 3.9 of Article 49?
9Under Article 52, Part 2.1, a contractor that is not a member of a construction SRO may perform construction contracts with a developer or technical customer if the obligations under each contract do not exceed what amount?
10According to Article 52, Part 2 of the Urban Planning Code, who ensures the performance of works under a construction contract concluded with a developer?
About the NOSTROY Chief Project Engineer — Construction Organization, Level 7 Exam
The professional exam for the qualification 'Chief project engineer (specialist in organization of construction) (level 7)', register number 16.02500.09, is the independent qualification assessment (НОК) used by construction GIPs in Russia. It is based on professional standard 16.025 'Specialist in organization of construction' (Ministry of Labour Order No. 231n of 21 April 2022) and assesses four labour functions: preparation for construction (C/01.7), management of construction (C/02.7), construction control (C/03.7), and handover and acceptance of completed objects (C/04.7). Under Article 55.5-1 of the Urban Planning Code, specialists in the national register of specialists in construction (НРС), kept by NOSTROY, must pass independent qualification assessment at least once every five years. Passing it also lowers the total-experience requirement for inclusion in the register from ten years to five. The NARK register currently lists a three-year validity for the certificate itself. The exam is held in person at accredited Centers of Qualification Assessment (ЦОК). The theory stage is 50 computer-based tasks in 60 minutes, and at least 36 points are needed to reach the practical stage. The practical stage uses situational tasks such as finding violations in a construction site plan. The scope draws on the Urban Planning Code, Government Decree No. 87, SP 48.13330.2019, SP 543.1325800.2024, SP 70.13330.2012, the labour-protection rules for construction (Order No. 883n), Minstroy Orders No. 344/pr and 1026/pr, and related standards. The official assessment is in Russian. This OpenExamPrep resource is an independent English-language MCQ study adaptation that keeps key Russian terms. It is not an official translation, does not reproduce the official task bank, and does not replace preparation for the practical stage.
Exam sponsor: Council for Professional Qualifications in Construction (СПК в строительстве) under NOSTROY; exams held by accredited ЦОКs. The requirements and fees below concern the certification or admission exam, separate from our free practice resources.
Assessment
Independent qualification assessment (НОК) under Federal Law No. 238-FZ, held in person at an accredited Center of Qualification Assessment (ЦОК) with video recording. Stage 1 is a computer-based theory test; stage 2 is a practical stage with situational tasks done in real or model conditions. The SPK in construction reviews the results and issues a qualification certificate or, if unsuccessful, a conclusion. OpenExamPrep's bank is an independent English-language MCQ study adaptation; it is not an official translation, does not simulate the official software, and cannot replace practice of the Russian-language practical tasks.
Time Limit
60 minutes (theoretical stage); about 120 minutes for the practical stage at accredited ЦОКs
Passing Score
At least 36 of 50 points in the theoretical stage, plus completion of the practical task(s) to the assessment-tool criteria
Exam / Certification Fees
Set by each accredited ЦОК under its contract with the candidate or employer; no nationally fixed fee
Exam sponsor websiteReported exam pass rate: Not published. Exam sponsor website
Fees, eligibility, and exam policies can change. Confirm them with the exam sponsor before applying or paying.
Official sources
- NARK register: qualification 16.02500.09 'Chief project engineer (specialist in organization of construction) (level 7)' · Source checked 2026-10-11
- NARK register: assessment tool 16.02500.09.001 · Source checked 2026-10-11
- National Association of Builders (НОСТРОЙ / NOSTROY) · Source checked 2026-10-11
- Urban Planning Code of the Russian Federation, Article 55.5-1 · Source checked 2026-10-11
- Ministry of Labour Order No. 231n of 21 April 2022: professional standard 'Specialist in organization of construction' · Source checked 2026-10-11
- SP 48.13330.2019 'Organization of construction' (with Amendments No. 1 and 2) · Source checked 2026-10-11
- SP 543.1325800.2024 'Construction control during construction, reconstruction and capital repair of capital construction objects' · Source checked 2026-10-11
Our practice resources: topics covered
We aim to reflect publicly available exam outlines and topic information in our study resources. Coverage, format, and difficulty may differ from the actual exam, and we cannot guarantee that every detail is accurate or current. Confirm exam requirements, fees, and policies with the official exam sponsor.
C/01.7 Preparation for construction
Urban Planning Code permits, expertise and design changes, national register of specialists, Decree No. 87 design sections, ППР development and approval, setting-out basis, site handover and preparation, demolition, and labour-protection organization
C/02.7 Management of construction
Scheduling and resources, concrete placement, compaction, joints, curing and winter concreting (SP 70.13330), masonry and precast work, deviations from the design, and labour protection during the works
C/03.7 Construction control
Input, operational and acceptance control, hidden works and responsible structures, executive documentation (Order No. 344/pr), the general work journal (Order No. 1026/pr), laboratory and non-destructive testing, tolerances, and state construction supervision
C/04.7 Handover and acceptance
Completion acts, conclusion of conformity (ЗОС), commissioning permit procedure, conservation of unfinished objects, comprehensive testing of engineering systems, and storage of executive documentation
Preparing for the NOSTROY Chief Project Engineer — Construction Organization, Level 7 Exam
What You Need to Know
- Passing score: At least 36 of 50 points in the theoretical stage, plus completion of the practical task(s) to the assessment-tool criteria
- Assessment: Independent qualification assessment (НОК) under Federal Law No. 238-FZ, held in person at an accredited Center of Qualification Assessment (ЦОК) with video recording. Stage 1 is a computer-based theory test; stage 2 is a practical stage with situational tasks done in real or model conditions. The SPK in construction reviews the results and issues a qualification certificate or, if unsuccessful, a conclusion. OpenExamPrep's bank is an independent English-language MCQ study adaptation; it is not an official translation, does not simulate the official software, and cannot replace practice of the Russian-language practical tasks.
- Time limit: 60 minutes (theoretical stage); about 120 minutes for the practical stage at accredited ЦОКs
- Exam / certification fees: Set by each accredited ЦОК under its contract with the candidate or employer; no nationally fixed fee Official sources
Using Our Practice Resources
- Work through all 100 available questions
- Review every answer and explanation
- Track weak areas and revisit them
- Use our AI tutor for tough concepts
NOSTROY Chief Project Engineer — Construction Organization, Level 7: Suggested Study Strategy
Frequently Asked Questions
What is the NOSTROY level-7 GIP exam?
It is the professional exam for qualification 16.02500.09, 'Chief project engineer (specialist in organization of construction) (level 7)', held under Federal Law No. 238-FZ on independent qualification assessment. Specialists in NOSTROY's national register of specialists in construction must pass this assessment at least once every five years (Urban Planning Code, Article 55.5-1).
How is the official exam structured?
It has two stages at an accredited ЦОК. The theory stage is 50 computer-based tasks drawn at random from the approved bank, with 60 minutes and at least 36 points needed. The practical stage uses situational tasks, and ЦОКs typically allot about 120 minutes to it.
Who can sit the exam?
The NARK register lists higher education in a construction specialty and at least five years of construction experience, including three years in engineering positions in construction organizations. An alternative route accepts any higher education with the same experience plus a notice of inclusion in the national register of specialists in construction.
How long is the qualification certificate valid?
The NARK qualification register currently lists a three-year validity for this certificate. The Urban Planning Code separately requires specialists in the national register to pass independent qualification assessment at least once every five years.
How much does the exam cost?
There is no national fee. Each accredited ЦОК sets its own price in its contract. The candidate or another person pays, or the employer pays when it sends the candidate (Federal Law No. 238-FZ, Article 4).
Is this practice bank an official NOSTROY exam or translation?
No. The official assessment is in Russian and uses the approved assessment-tool bank and practical tasks. This bank is independent English-language MCQ practice by OpenExamPrep, with key Russian terms kept. It does not reproduce official tasks or simulate the practical stage.