100+ Free Construction Painting NC II Practice Questions

TESDA Construction Painting NC II Competency Assessment practice questions are available now; exam metadata is being verified.

✓ No registration✓ No credit card✓ No hidden fees✓ Start practicing immediately
Varies Pass Rate
100+ Questions
100% Free

Loading practice questions...

2026 Statistics

Key Facts: Construction Painting NC II Exam

₱1,156

Assessment Fee

TESDA Circular 072-2021

Competency

Passing Standard

TESDA

3 Core

Core Units Focus

TR 2015

5 years

NC Validity

TESDA

TESDA Construction Painting NC II certifies painters in surface preparation and coating application. Assessment combines written testing with demonstration and oral questioning. Promulgated assessment fee is ₱810 (Jan 2021 schedule).

Sample Construction Painting NC II Practice Questions

Try these sample questions to test your Construction Painting NC II exam readiness. Each question includes a detailed explanation. Start the interactive quiz above for the full 100+ question experience with AI tutoring.

1A painter receives a job packet for an interior concrete wall repaint. According to CON713357, what must be secured and interpreted before selecting materials and tools?
A.Scope of work from appropriate personnel and/or working drawings
B.Only the paint brand preference of the homeowner
C.Electrical load schedules for the building panel
D.Plumbing isometric drawings for drain lines
Explanation: Element 1.1 of CON713357 requires securing and interpreting the scope of work from appropriate personnel and/or working drawings before identifying painting materials, tools, and equipment.
2Which coating material is classified as a base coat in the TESDA Construction Painting NC II Training Regulations?
A.Primer
B.Finish coat only
C.Colorant tint only
D.Thinner/reducer only
Explanation: The TR lists base coat (primer), putty, and finish coat as associated painting materials. Primer is the base coat that promotes adhesion and seals the substrate.
3When selecting painting materials for a job, which document should a painter consult alongside job requirements and OSHS?
A.Paint schedule and/or manufacturer specifications
B.Vehicle registration records
C.Menu pricing from a restaurant
D.Social media color trends only
Explanation: CON713357 requires selecting materials consistent with job requirements, plans and/or paint schedules, and Occupational Safety and Health Standards.
4Which item is explicitly listed under materials use and specifications in CON713357?
A.Grades of sandpaper
B.Types of concrete reinforcement bars
C.Welding electrode classifications
D.Tile grout color charts only
Explanation: The TR learning contents for CON713357 include types of paint, thinner/reducer, grades of sandpaper, types of putty, paint brush and roller/tray, and colorant.
5Before mixing paint on site, what safety requirement applies during preparation of paint materials per CON713357?
A.Observe safety precautions and use appropriate PPE
B.Disable all ventilation to contain odors indoors
C.Mix near open flames to test flash point
D.Store opened solvents in unlabeled containers
Explanation: Element 2.4 of CON713357 requires observing safety precautions during preparation of paint materials, with appropriate PPE used in line with job requirements.
6A painter must protect floors and fixtures before starting work. Which CON713357 element covers this task?
A.Install protective covering on floors and fixtures
B.Apply finish coat directly over fixtures
C.Remove all door frames before painting
D.Skip protection when using water-based paint only
Explanation: Performance criterion 1.4 requires installing protective covering on floors and fixtures before painting operations begin.
7When assembling access equipment such as scaffolding or ladders, what must the painter follow?
A.Manufacturer specifications and safety precautions per detailed plans
B.Maximum height extension regardless of load rating
C.Assembly by untrained personnel to save time
D.Removal of guardrails to improve reach
Explanation: CON713357 element 1.5 requires assembling access equipment consistent with detailed plans and manufacturer specifications while following safety precautions.
8Which material is used to fill minor surface imperfections before priming and finishing?
A.Putty
B.Thinner only
C.Sandpaper grit
D.Masking tape only
Explanation: The TR identifies putty as an associated material for surface preparation and finishing alongside primer and finish coat.
9What is the purpose of a thinner or reducer in a solvent-based paint system?
A.Adjust paint viscosity for proper application per manufacturer recommendations
B.Replace primer on bare metal surfaces
C.Increase dry film thickness without adding solids
D.Eliminate the need for surface preparation
Explanation: Types of thinner/reducer are core knowledge in CON713357. Thinners adjust viscosity for brushing, rolling, or spraying per manufacturer specifications.
10Which application tool combination is specifically named in the TR materials list for CON713357?
A.Paint brush and roller with tray
B.Tile cutter and rubber mallet
C.Pipe wrench and tubing bender
D.Welding torch and electrode holder
Explanation: The TR learning contents explicitly list types of paint brush and roller/tray among required material knowledge.

About the Construction Painting NC II Practice Questions

Verified exam format metadata for TESDA Construction Painting NC II Competency Assessment is pending. The practice questions above remain available while official exam length, timing, passing score, fee, and administrator details are reviewed.