Free Practice Questions for CONOCER Instalador Fotovoltaico
Exam-style questions and explanations by OpenExamPrep.
Loading practice questions...
Key Facts: CONOCER Instalador Fotovoltaico Exam
4 Elements
Verify, Install, Connect, Start Up
EC0586.01 standard
Up to 1,000 V
Grid-Tied, No Batteries
EC0586.01 standard
±15% STC
Module and String Voc Check
EC0586.01 standard
2 h + 6 h
Estimated Desk and Field Time
EC0586.01 standard
14/12/2017
DOF Publication Date
EC0586.01 standard
< 0.7 MW
Distributed Generation Limit
Ley del Sector Eléctrico (2025)
CONOCER EC0586.01 (Instalación de sistemas fotovoltaicos en residencia, comercio e industria) is Mexico's competency standard for grid-tied solar PV installers. Accredited certifiers evaluate four elements, site verification, mounting, electrical connection, and startup, in a real or simulated installation and issue a judgment of Competente or Todavía no competente. This independent OpenExamPrep bank offers English-language practice MCQs on the EC0586.01 criteria and NOM-001-SEDE-2012 Article 690.
Sample CONOCER Instalador Fotovoltaico Practice Questions
Try these sample questions to review concepts for the CONOCER Instalador Fotovoltaico exam. Each question includes a detailed explanation. Start the interactive quiz above for the full 79+ question experience with AI tutoring.
1Which systems does CONOCER EC0586.01 cover?
2In EC0586.01, the installer works from the Carpeta del Proyecto (CP). Which set of documents does the standard's glossary list for the CP?
3When corroborating the site's feasibility under EC0586.01 Element 1, which action is part of the performance criteria?
4EC0586.01 requires the installer to corroborate the building's general grounding system before installing. Besides confirming that it exists as shown in the CP, what else must be checked?
5At the load center where the SFVI will connect, what does EC0586.01 ask the installer to corroborate?
6Before installing, EC0586.01 asks the installer to corroborate the grid voltage at the load center with a multimeter or voltmeter. Which set of measurements does the standard describe?
7When preparing tools under EC0586.01, what must the installer verify about the measuring equipment?
8While checking materials against the Lista de Materiales y Equipo, the installer finds an inverter with a dented enclosure that could affect its function. What does EC0586.01 require?
9EC0586.01 lists an emergent situation in Element 1: the DC voltage to be handled is 1,000 V or more. What is the expected response?
10EC0586.01's attitude of responsibility in Element 1 is shown by verifying, before installing, that certain items are available in addition to PPE. Which set does it name?
About the CONOCER Instalador Fotovoltaico Exam
Independent CONOCER EC0586.01 practice questions by OpenExamPrep. EC0586.01 (Instalación de sistemas fotovoltaicos en residencia, comercio e industria) is the CONOCER competency standard for installers of grid-interconnected photovoltaic systems up to 1,000 V without batteries. The standard is published in Spanish, and certification follows a competency evaluation of performances, products, knowledge, and attitudes by an accredited certifier, not an official multiple-choice test. This bank is an English-language MCQ study adaptation covering site verification, mounting, DC and AC connection, NOM-001-SEDE-2012 Article 690 rules, and startup with anti-islanding checks; it is not an official translation and does not replace the evaluation.
Exam sponsor: CONOCER (Consejo Nacional de Normalización y Certificación de Competencias Laborales). The requirements and fees below concern the certification or admission exam, separate from our free practice resources.
Assessment
One standard with four elements, published in the DOF on 14 December 2017 and developed by the committees of Comercio, Industria y Servicios de Baja California, Energía Renovable y Eficiencia Energética, and INFONAVIT: Elemento 1 (Verificar las condiciones para la instalación del SFVI), Elemento 2 (Instalar los componentes mecánicos y eléctricos del SFVI), Elemento 3 (Conectar los componentes eléctricos del SFVI), and Elemento 4 (Realizar la puesta en marcha del SFVI). It covers grid-interconnected systems at low voltage (up to 1,000 V) without battery backup. Products include the verified materials list and tool list, the installed array, the Formato de Registro with Voc, Isc, and startup measurements, and the operating, labeled system.
Time Limit
About 8 or more hours estimated (2 hours desk work, at least 6 hours field)
Passing Score
Competency judgment: Competente or Todavía no competente
Exam / Certification Fees
Varies by accredited certifier (not published by CONOCER)
Exam sponsor websiteFees, eligibility, and exam policies can change. Confirm them with the exam sponsor before applying or paying.
Official sources
- CONOCER — Registro Nacional de Estándares de Competencia (RENEC) · Source checked 2026-09-30RENEC lists EC0586.01 'Instalación de sistemas fotovoltaicos en residencia, comercio e industria' as a current standard with accredited certifiers
- CONOCER — RENEC standard lookup (EC0586.01 ficha) · Source checked 2026-09-30Full EC0586.01 text: approved 30 November 2017 and published in the DOF on 14 December 2017, updating EC0586 (DOF 11 June 2015); four elements (E2936 to E2939); Nivel 2; revision period 2 years; evaluation estimated at 2 hours desk and at least 6 hours field
- SENER — NOM-001-SEDE-2012 full text (PDF) · Source checked 2026-09-30Articles 690 and 705 (maximum voltage, circuit sizing, disconnects, arc-fault protection, labeling, anti-islanding, and point of connection) used in this bank; the Secretaría de Economía catalog lists the NOM as vigente
- Cámara de Diputados — Ley del Sector Eléctrico · Source checked 2026-09-30Article 25 defines generación distribuida as plants of less than 0.7 MW by exempt generators, replacing the 0.5 MW threshold of the former Ley de la Industria Eléctrica
- Comisión Nacional de Energía — Generación Distribuida · Source checked 2026-09-30Lists the current distributed-generation instruments, including the Manual de Interconexión de Centrales de Generación con Capacidad menor a 0.5 MW referenced by EC0586.01
- CONOCER — Preguntas Frecuentes · Source checked 2026-09-30Costs vary by standard and evaluation center; certificate validity is set in each standard; the result is competent or not yet competent; certificates are issued by the Secretaría de Educación Pública
Our practice resources: topics covered
We aim to reflect publicly available exam outlines and topic information in our study resources. Coverage, format, and difficulty may differ from the actual exam, and we cannot guarantee that every detail is accurate or current. Confirm exam requirements, fees, and policies with the official exam sponsor.
Elemento 1: Verificar las condiciones para la instalación del SFVI
Corroborating the site against the Carpeta del Proyecto, marking work-at-height and electrical risk points, checking the grounding system and load-center protections, measuring grid voltages, verifying materials and tools, and knowing orientation methods such as the círculo indio.
Elemento 2: Instalar los componentes mecánicos y eléctricos del SFVI
Assembling, leveling, orienting, and anchoring the structure, checking torque with a torque wrench, preventing galvanic corrosion, mounting modules within their manual's requirements, and fixing inverters and junction boxes while keeping enclosure protection ratings.
Elemento 3: Conectar los componentes eléctricos del SFVI
Wiring DC and AC circuits, bonding to the existing grounding system, installing and opening protections and disconnects, checking module and string Voc and Isc against the ±15% STC criterion, and applying NOM-001-SEDE-2012 Article 690 sizing rules.
Elemento 4: Realizar la puesta en marcha del SFVI
Energizing in the manufacturer's sequence, recording synchronization time and measurements, labeling the system, verifying anti-islanding by opening the inverter's AC disconnect, and handing over to the supervisor.
Preparing for the CONOCER Instalador Fotovoltaico Exam
What You Need to Know
- Passing score: Competency judgment: Competente or Todavía no competente
- Assessment: One standard with four elements, published in the DOF on 14 December 2017 and developed by the committees of Comercio, Industria y Servicios de Baja California, Energía Renovable y Eficiencia Energética, and INFONAVIT: Elemento 1 (Verificar las condiciones para la instalación del SFVI), Elemento 2 (Instalar los componentes mecánicos y eléctricos del SFVI), Elemento 3 (Conectar los componentes eléctricos del SFVI), and Elemento 4 (Realizar la puesta en marcha del SFVI). It covers grid-interconnected systems at low voltage (up to 1,000 V) without battery backup. Products include the verified materials list and tool list, the installed array, the Formato de Registro with Voc, Isc, and startup measurements, and the operating, labeled system.
- Time limit: About 8 or more hours estimated (2 hours desk work, at least 6 hours field)
- Exam / certification fees: Varies by accredited certifier (not published by CONOCER) Official sources
Using Our Practice Resources
- Work through all 79 available questions
- Review every answer and explanation
- Track weak areas and revisit them
- Use our AI tutor for tough concepts
CONOCER Instalador Fotovoltaico: Suggested Study Strategy
Frequently Asked Questions
What is the official format of the CONOCER EC0586.01 evaluation?
An accredited certifier, evaluation center, or independent evaluator observes the candidate in a real or simulated installation that includes a microinverter system of at least 750 Wp and a central-inverter system of at least 1,500 Wp. The standard estimates 2 hours of desk work and at least 6 hours in the field. There is no official multiple-choice exam.
Does EC0586.01 cover battery or off-grid systems?
No. EC0586.01 covers grid-interconnected photovoltaic systems (SFVI) in homes, businesses, and industry at low voltage up to 1,000 V, without battery backup. Supervision of PV installations is covered by a separate standard, EC1181.
How is the CONOCER EC0586.01 certification graded?
The result is a competency judgment: Competente or Todavía no competente. A candidate found competent receives a certificate of labor competency issued by the Secretaría de Educación Pública through CONOCER.
How much does CONOCER EC0586.01 certification cost?
CONOCER does not publish a single national fee. It states that evaluation and certification costs vary by standard and by the evaluation center chosen, so candidates should ask accredited certifiers listed in RENEC for EC0586.01.
Is this OpenExamPrep question bank an official CONOCER test?
No. It is an independent, English-language multiple-choice study adaptation of the EC0586.01 criteria and the NOM-001-SEDE-2012 rules they rely on. It is not an official CONOCER examination or translation, and it cannot replace the practical evaluation.