All Practice Exams

Free Practice Questions for CESSWI

Exam-style questions and explanations by OpenExamPrep.

✓ No registration✓ No credit card
167+ Questions
100% Free
Same family resources

Explore More EnviroCert Stormwater & Erosion Control Certifications

Continue into nearby exams from the same family. Each card keeps practice questions, study guides, flashcards, videos, and articles in one place.

Exam Review

Key Facts: CESSWI Exam

2 sections

Part B Structure

EnviroCert

Not published

Current item count (legacy memo: 100–120 per section)

ECI current FAQ and November 2015 memo

70%

Passing Score on Each Section

EnviroCert

180 min

Part B Time Limit (90 + 90)

EnviroCert

$345

Prometric Exam Bundle

EnviroCert Sept 2026

$370

Application Fee (incl. Manual)

EnviroCert Sept 2026

6 PDHs/yr

Annual Renewal PDHs

ECI Renewal

Prometric

Exam Delivery

EnviroCert

CESSWI is EnviroCert International’s certification for erosion, sediment, and stormwater inspectors. The current FAQ gives two 90-minute Part B sections; an older November 2015 memo reports a 70% passing standard on each and a historical 100–120-question range. US applicants without a current ECI professional certification also complete Part A. The September 2026 schedule lists a $370 application fee and $345 Prometric bundle ($715 total), with remote-proctored and approved in-person arrangements. Full CESSWI renews annually with six PDHs and a $160 fee.

Sample CESSWI Practice Questions

Try these sample questions to review concepts for the CESSWI exam. Each question includes a detailed explanation. Start the interactive quiz above for the full 167+ question experience with AI tutoring.

1Under EPA 40 CFR Part 122, which federal permit program regulates stormwater discharges from most construction sites that disturb one or more acres?
A.NEPA Construction Permit
B.NPDES Construction General Permit (CGP)
C.Clean Air Act 112 permit
D.RCRA Subtitle D permit
Explanation: The NPDES Construction General Permit (CGP) implements the Clean Water Act requirement to control stormwater discharges from construction activities disturbing one or more acres (or less if part of a larger common plan). Operators must obtain CGP coverage before discharging.
2Which document is the primary site-specific plan that a CESSWI typically inspects against on a construction project?
A.Spill Prevention, Control, and Countermeasure (SPCC) plan
B.Stormwater Pollution Prevention Plan (SWPPP)
C.OSHA Written Hazard Communication Plan
D.Fire Protection Plan
Explanation: The SWPPP is the site-specific plan required by the NPDES Construction General Permit. It identifies pollutant sources and the BMPs selected to control them, and an inspector verifies that installed BMPs match the SWPPP.
3Under the 2022 EPA Construction General Permit, what is the baseline routine inspection frequency for a typical active construction site?
A.At least once every 30 days
B.At least once every 14 days
C.At least once every 7 days, OR at least once every 14 days plus after qualifying rain events
D.Only after every rain event
Explanation: EPA's 2022 CGP allows operators to choose between inspecting at least every 7 calendar days OR at least every 14 calendar days plus within 24 hours of a qualifying storm event. The qualifying rain threshold is 0.25 inch in 24 hours.
4EPA's 2022 CGP defines a qualifying storm event that can trigger a post-storm inspection as a rain event producing at least what depth within 24 hours?
A.0.10 inch
B.0.25 inch
C.0.50 inch
D.1.00 inch
Explanation: The 2022 CGP defines a qualifying storm event as 0.25 inch or greater of rainfall in 24 hours. A post-storm inspection is then required within 24 hours of the end of that event under the 14-day-plus-storm option.
5Under the CGP, within how many days after identifying a BMP deficiency must the operator complete corrective action, unless infeasible?
A.Immediately, within the same work shift whenever possible, and generally within 7 calendar days
B.Within 30 calendar days
C.Within 90 calendar days
D.By the next annual report
Explanation: CGP corrective actions must be initiated immediately and completed as soon as possible, with a general outside limit of 7 calendar days. Delays beyond 7 days must be documented with a written explanation and a revised schedule.
6Who is ultimately legally responsible for compliance with the NPDES Construction General Permit on a construction site?
A.The CESSWI inspector
B.The Notice of Intent (NOI) operator(s) identified on the permit
C.EPA staff
D.The equipment rental supplier
Explanation: Legal responsibility rests with the operator(s) listed on the Notice of Intent, typically the owner and/or general contractor that has operational control over the site. Inspectors document conditions; they do not transfer the legal obligation from the permittee.
7An MS4 permit regulates which of the following?
A.Stormwater discharges from a municipal separate storm sewer system owned by a local jurisdiction
B.Discharges from industrial process wastewater only
C.Drinking water treatment plant effluent
D.Landfill leachate
Explanation: An MS4 (Municipal Separate Storm Sewer System) permit covers stormwater that a municipality or similar entity conveys to waters of the U.S. Construction sites discharging to an MS4 must meet both CGP and the receiving MS4's requirements.
8Turbidity is commonly measured and reported in which unit on construction sites?
A.Milligrams per liter (mg/L)
B.Nephelometric Turbidity Units (NTU)
C.Parts per billion (ppb)
D.Gallons per minute (gpm)
Explanation: Turbidity is measured in NTU using a nephelometer, which shines a light through a water sample and measures the scattered light at 90 degrees. NTU is the standard unit in EPA Method 180.1 and Standard Methods.
9A CESSWI inspector collects a discharge sample for a site that requires chain-of-custody documentation. Which of the following is MOST important for chain-of-custody?
A.Each person who handles the sample is identified with date and time
B.The sample is kept at room temperature at all times
C.The sample bottle can be opened by any worker on site
D.The label can be omitted to save time
Explanation: Chain-of-custody requires that every transfer of a sample be documented with the handler's name, date, and time. That creates a defensible record proving the sample was not altered or tampered with between collection and analysis.
10Which federal agency issues the baseline Construction General Permit used in states where EPA is the NPDES permitting authority?
A.OSHA
B.USDA Natural Resources Conservation Service
C.US Environmental Protection Agency (EPA)
D.US Army Corps of Engineers
Explanation: EPA issues the federal Construction General Permit under Clean Water Act authority for states, territories, and tribes where EPA remains the NPDES permitting authority. Most states have been authorized to run their own equivalent programs.

About the CESSWI Exam

CESSWI is EnviroCert International's professional certification for inspectors who perform construction-site, industrial, and post-construction erosion, sediment, and stormwater compliance inspections. The credential covers federal and state stormwater regulations, soils and hydrology, general permits, inspection fundamentals and construction elements, stormwater sampling, documentation and safety, plan and site management, and management practices across six categories (BMPs).

Exam sponsor: EnviroCert International, Inc. (ECI). The requirements and fees below concern the certification or admission exam, separate from our free practice resources.

Assessment

Separate open-book untimed Part A rules assessment plus closed-book Part B in two 90-minute sections; current item count not published

Time Limit

Part B is 180 minutes total (Section 1 90 minutes, Section 2 90 minutes); Part A is open book with no time limit

Passing Score

70% or higher on each section

Exam / Certification Fees

$345 Prometric bundle plus $370 application fee (includes digital General Principles Review Manual)

Exam sponsor website

Our practice resources: topics covered

We aim to reflect publicly available exam outlines and topic information in our study resources. Coverage, format, and difficulty may differ from the actual exam, and we cannot guarantee that every detail is accurate or current. Confirm exam requirements, fees, and policies with the official exam sponsor.

0% (separate Part A exam)

SAOP 1: Rules and Regulations

Federal, state, and local erosion, sediment, and stormwater law, administered as a separate open-book Part A exam for candidates without a current ECI certification.

0%

SAOP 2: Soils Mechanics and Soil Science Principles

Soil formation, physical and mechanical soil properties, USDA textural triangle classification, water and wind erosion processes, and sediment transport.

0%

SAOP 3: Site Climatic Conditions and Rainfall Amounts

Regional climate, seasonal precipitation patterns, and rainfall intensity/duration effects on site erosion and inspection scheduling.

1-2%

SAOP 4: Hydrology and Drainage Principles

Hydrologic cycle, watershed drainage planning, Hydrologic Soil Groups (A-D), disturbed soil profiles, Time of Concentration, hydrographs, and runoff estimation equations.

4-6%

SAOP 5: General Permits

NPDES CGP structure, NOI/NOT procedures, 50-foot natural buffers, 7-day and 14-day + 0.25-inch storm inspection frequencies, corrective action deadlines, and TMDL/ESA triggers.

12-15%

SAOP 6: Inspection Fundamentals and Duties

Inspector roles and scope of authority, pre-inspection document review, inspector support equipment, outfall-first inspection sequence, and post-inspection follow-through.

7-9%

SAOP 7: Inspection Elements for Construction

Pre-construction meetings, site entrance postings, on-site SWPPP reviews, active BMP failure diagnosis, final stabilization verification (70% rule), and Notice of Termination.

1-3%

SAOP 8: Stormwater Monitoring and Sampling

Permit monitoring triggers, sampling plans, turbidity (NTU) and pH measurement, grab sample collection, meter calibration, preservation, and Chain of Custody.

22-27%

SAOP 9: Documentation, Communication, and Safety

Objective field notes, forensic photo logs, formal inspection reports, Corrective Action Logs, site map markups, conflict resolution, OSHA excavation/confined-space safety, SDS, spill response, and PPE.

9-11%

SAOP 10: Plan and Site Management

SWPPP, ESCP, and SWMP distinctions, certifications and notifications, civil plan sets and legends, sequencing, contour reading, slope calculations, check dam spacing, and plan amendments.

32-39%

SAOP 11: Management Practices

Purpose, applicability, limitations, installation, inspection, and maintenance thresholds for 68 category entries in the official Job Task Analysis across Site Planning, Erosion Control, Sediment Control, Runoff Control, Good Housekeeping, and Post-Construction.

Preparing for the CESSWI Exam

What You Need to Know

  • Passing score: 70% or higher on each section
  • Assessment: Separate open-book untimed Part A rules assessment plus closed-book Part B in two 90-minute sections; current item count not published
  • Time limit: Part B is 180 minutes total (Section 1 90 minutes, Section 2 90 minutes); Part A is open book with no time limit
  • Exam / certification fees: $345 Prometric bundle plus $370 application fee (includes digital General Principles Review Manual) Official sources

Using Our Practice Resources

  • Work through all 167 available questions
  • Review every answer and explanation
  • Track weak areas and revisit them
  • Use our AI tutor for tough concepts

CESSWI: Suggested Study Strategy

1Weight your study time to the JTA blueprint: Management Practices (32-39%) and Documentation, Communication, and Safety (22-27%) together account for roughly three-fifths of Part B.
2Read the current permit: EPA CGP rain triggers use at least 0.25 inch within 24 hours; minor corrective work is generally due by the next business day, significant repairs/new controls within seven days, with separate logging and SWPPP clocks.
3Use the approved BMP detail and permit to verify installation and cleanout thresholds; handbook examples do not establish one universal national threshold.
4Memorize Rise / Run = Slope and practice converting between percent slope, horizontal-to-vertical ratios (H:V), contour elevations, and check dam spacing (L = H / S); EnviroCert supplies all other equations on the exam.
5Choose a safe, systematic inspection route that covers all required areas; tracing discharge points upstream is useful but is not a universal mandated order.
6Write inspection reports using objective, factual language tied to site plan coordinates, weather data, and dated photographs rather than speculative legal conclusions or redesign instructions.
7Review OSHA construction site safety standards including 29 CFR 1926 Subpart P excavation rules (4-foot egress within 25 feet, 2-foot spoil pile setback, 5-foot protective system threshold), 19.5%-23.5% confined space oxygen limits, SDS 16-section format, and PPE.

Frequently Asked Questions

What is the CESSWI exam format and passing score?

CESSWI uses a separate open-book untimed Part A US rules assessment for applicants without a current ECI professional certification, and closed-book Part B in two 90-minute sections. The current FAQ supplies these times; the November 2015 public examination memo gives a 70% standard per section and a historical 100–120-question range. Confirm current item counts and appointment instructions with ECI.

How much does the CESSWI exam cost in 2026?

EnviroCert's Program Fee Schedule lists a $370 application fee (which includes the digital General Principles Review Manual) and a $345 Prometric exam bundle, for a total initial cost of $715. An ECI-proctored in-person first exam is $210. A Prometric retest bundle is $210 ($205 on the legacy webpage table; $190 in-person retest), and annual renewal is $160 for full CESSWI status ($105 on the Sept 2026 fee schedule / $100 on the legacy table for CESSWI-IT).

What are the CESSWI experience and education requirements?

No high school diploma or college degree is required to apply for CESSWI. Full CESSWI certification requires a minimum of 2 years of combined professional experience and education credit (0.5 year for CESSWI-IT In-Training status). Qualifying degrees in science, planning, or construction management earn 0.5 year (Associate), 1.0 year (Bachelor's), or 1.25 years (Graduate/Law); non-qualifying degrees earn half credit, and professional licensure without a degree (PE, LA, PG, PH) earns 1.5 years credit.

Is the CESSWI exam open book?

Part A (US Federal Rules, Regulations, and Ordinances) is an open-book exam with no time limit. Part B (Sections 1 and 2) is strictly closed book; candidates may use a ECI-authorized calculator, and EnviroCert provides all equations other than Rise / Run = Slope within the exam question or a drop-down menu.

What is on the CESSWI exam blueprint?

EnviroCert's Job Task Analysis (V1.1, May 2024) weights Part B across 11 Specific Areas of Practice (SAOPs): Management Practices at 32-39%, Documentation, Communication, and Safety at 22-27%, Inspection Fundamentals and Duties at 12-15%, Plan and Site Management at 9-11%, Inspection Elements for Construction at 7-9%, General Permits at 4-6%, Stormwater Monitoring and Sampling at 1-3%, and Hydrology and Drainage Principles at 1-2%.

How is CESSWI renewed?

CESSWI renews annually from the certification date through the ECI Certification Portal. Full CESSWI status requires 6 Professional Development Hours (PDHs) per year and a $160 renewal fee; CESSWI-IT requires 3 PDHs per year and a $105 ($100 legacy) renewal fee. Up to one year of PDHs (6 PDHs) may be carried forward upon written request, and ECI audits at least 1% of PDH records annually.

Does CESSWI satisfy EPA and state Qualified Person requirements?

CESSWI demonstrates inspection competency, but certification acceptance and qualified-person training depend on the applicable permit and jurisdiction. EPA CGP Parts 4.1 and 6.3 require qualified inspectors to complete the specified training; holding CESSWI alone does not automatically satisfy every EPA or state requirement. Verify local acceptance and additional training before taking an inspection assignment.

What is the boundary between a CESSWI inspector and a CPESC designer?

A CESSWI observes, measures, samples, photographs, and documents compliance with the approved SWPPP and permit, and notifies the permitee when plan modifications are needed. A CESSWI does not engineer or redesign stormwater plans; engineering design and plan stamping belong to a legally authorized designer.