Under EPA 40 CFR Part 122, which federal permit program regulates stormwater discharges from most construction sites that disturb one or more acres?
Rules And Regulations
Question · Easy
What a Safety Data Sheet tells you
Short
Which document is the primary site-specific plan that a CESSWI typically inspects against on a construction project?
Chapter 1: CESSWI Program Overview, Scope of Practice & Professional Ethics
1.1 CESSWI Scope of Practice, Eligibility, and Exam Structure
Study guide
Under the 2022 EPA Construction General Permit, what is the baseline routine inspection frequency for a typical active construction site?
Question · Medium
Engineering Exam Prep Podcast
Listen on Spotify
Podcast
EPA's 2022 CGP defines a qualifying storm event that can trigger a post-storm inspection as a rain event producing at least what depth within 24 hours?
Under the CGP, within how many days after identifying a BMP deficiency must the operator complete corrective action, unless infeasible?
Who is ultimately legally responsible for compliance with the NPDES Construction General Permit on a construction site?
1.2 Certification Renewal, PDH Requirements, and Audit Policies
An MS4 permit regulates which of the following?
Turbidity is commonly measured and reported in which unit on construction sites?
Monitoring And Sampling
A CESSWI inspector collects a discharge sample for a site that requires chain-of-custody documentation. Which of the following is MOST important for chain-of-custody?
Which federal agency issues the baseline Construction General Permit used in states where EPA is the NPDES permitting authority?
1.3 EnviroCert Code of Ethics and Professional Conduct
What is the typical maximum slope length before a sediment control such as a silt fence should be interrupted with a reinforcement like a J-hook or terminated?
Management Practices
A silt fence is designed primarily to control what?
The specification commonly referenced for silt fence geotextile in the U.S. is:
Question · Hard
A silt fence should be trenched in and backfilled how deep on the upslope side to prevent undermining?
Chapter 2: Federal, State, and Local Stormwater Regulations
2.1 Federal Water-Pollution History and Stormwater Phases
Accumulated sediment behind a silt fence should be removed once it reaches approximately what fraction of the exposed fabric height?
Rock check dams are typically installed in channels and swales to:
Check dams in a channel should be spaced so that the toe of the upstream dam is at approximately the same elevation as which feature of the next downstream dam?
A stabilized construction entrance is intended to:
2.2 CWA Sections, Water Quality, and Related Federal Programs
Inlet protection at a storm drain inlet is intended to:
Which combination best describes the ORDER of priority the CGP expects on construction sites?
Which is an example of an EROSION control, not a sediment control?
Rolled erosion control products (RECPs) are typically anchored with:
2.3 EPA Construction Permit Coverage and Operational Clocks
Surface roughening on a freshly graded slope helps by:
Fiber rolls (wattles) installed across a slope should be:
A turbidity curtain is primarily used to:
A typical minimum dewatering practice for pumping sediment-laden water from an excavation before discharging to a receiving water is to:
2.4 Industrial MSGP and Municipal MS4 Programs
Sediment basins under the CGP must typically be sized to provide at least what storage for sites with 10 or more disturbed acres draining to a common location?
The preferred outlet for a CGP-compliant sediment basin is:
A concrete washout area on a construction site is primarily needed because:
Which of the following is considered 'good housekeeping / materials management' rather than an erosion or sediment control?
2.5 Regulatory Compliance, Enforcement Mechanisms, and Penalties
Inlet protection made of silt fence wrapped around a curb inlet is often prohibited on roadways because it:
Dust control on unpaved haul roads is often achieved by:
Rip-rap at a pipe outlet is used to:
Temporary seeding is BEST described as:
Chapter 3: Soil Mechanics, Erosion Processes, and Climatic Factors
3.1 Soil Formation, Horizons, and Geomorphology
A diversion berm or swale is typically used to:
Permanent final stabilization under the 2022 CGP generally requires a uniform perennial vegetative cover with a density of at least:
Under the 2022 EPA CGP, when earth-disturbing activities have permanently ceased (or temporarily ceased and will not resume for 14 or more calendar days), when must the operator INITIATE soil stabilization?